Monday, 10 August 2026
25,182 passenger trains were recorded on Monday, 10 August 2026 and 407 of them were cancelled. Arrival times were not captured for most of this day, so it is a record of what ran rather than of how punctual it was.
25,182 passenger services were recorded as having been scheduled and settled on this date. Arrival times reached the archive for only 4,149 of them, so nothing is claimed here about how late the rest were — the figures below cover what ran and what did not.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
407 services were cancelled, 1.6% of everything booked. The reason given most often was “This service has been cancelled because of a shortage of train crew”, on 66 of them. Cancellation reasons are close to complete even on days like this, and they are the operators' own wording, reproduced unedited.
Avanti West Coast lost the largest share of its own timetable, 11.0% of 364 booked runs.
The day in numbers
| Passenger trains recorded | 25,182 | |
|---|---|---|
| Cancelled | 407 | 1.6% |
| Arrival time recorded | 4,149 | 16.7% of those that ran |
Every percentage among the bands is of the 4,149 trains whose arrival reached the archive — not of all 25,182, and the bands are exclusive. 20,626 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 2,937 runs down to LS on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||
|---|---|---|
ScotRail SR | 2,937 | 0% |
Northern NT | 2,881 | 1% |
Great Western Railway GW | 2,074 | 1% |
South Western Railway SW | 1,784 | 0% |
Southern SN | 1,628 | 2% |
Southeastern SE | 1,596 | 1% |
London Overground LO | 1,573 | 4% |
Transport for Wales AW | 1,383 | 0% |
Greater Anglia LE | 1,284 | 1% |
West Midlands Railway LM | 1,277 | 4% |
Thameslink TL | 895 | 3% |
London Underground LT | 753 | 0% |
Elizabeth line XR | 687 | 4% |
East Midlands Railway EM | 591 | 2% |
Merseyrail ME | 578 | 0% |
Great Northern GN | 419 | 4% |
c2c CC | 407 | 1% |
Avanti West Coast VT | 364 | 11% |
Chiltern Railways CH | 336 | 1% |
CrossCountry XC | 334 | 3% |
TransPennine Express TP | 331 | 1% |
London North Eastern Railway GR | 300 | 0% |
Tyne and Wear Metro TW | 173 | 0% |
Heathrow Express HX | 150 | 10% |
Sheffield Supertram SJ | 97 | 0% |
Gatwick Express GX | 71 | 0% |
Island Line IL | 52 | 0% |
Eurostar ES | 48 | 0% |
Charter/Other ZZ | 39 | 0% |
Grand Central GC | 20 | 0% |
West Coast Railway Co WR | 16 | 0% |
Hull Trains HT | 14 | 0% |
Lumo LD | 12 | 17% |
Lumo Stirling LF | 10 | 10% |
Caledonian Sleeper CS | 10 | 0% |
North Yorkshire Moors Railway NY | 8 | 0% |
LS LS | 8 | 0% |
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
113 services
This service has been delayed by a fire next to the track
71 services
This service has been delayed by trespassers on the railway
68 services
This service has been delayed by a safety inspection of the track
56 services
This service has been delayed by a fault with the signalling system
49 services
This service has been delayed by trespassers on the railway earlier today
40 services
This service has been delayed by a fault on a train earlier
37 services
This service has been delayed by train crew being delayed
28 services
Why trains were cancelled
A reason reached the archive for 267 of the 407 cancellations (65.6%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a shortage of train crew
66 services
This service has been cancelled because of a shortage of train drivers
60 services
This service has been cancelled because of a safety inspection of the track
33 services
This service has been cancelled because of a fault with the signalling system
32 services
This service has been cancelled because of a tunnel being closed for safety reasons
24 services
This service has been cancelled because of a member of train crew being unavailable
19 services
This service has been cancelled because of a fault on a train
18 services
This service has been cancelled because of urgent repairs to the railway
15 services
The longest delays
The worst of them arrived 1h 36m behind schedule — Elephant & Castle Underground to Stonebridge Park, booked away at 21:29, run by London Underground. The ten longest range from 1h 36m down to 58 min, and they belong to 6 operators, CrossCountry accounting for 3. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
21:29 | Elephant & Castle Underground to Stonebridge Park 2I41 · LT | 1h 36m |
22:50 | Hastings to Tonbridge 1H84 · SE | 1h 27m |
22:55 | Hastings to Eastbourne 1U75 · SN | 1h 25m |
15:26 | Edinburgh to London Kings Cross 1E86 · LD | 1h 20m |
21:48 | London Bridge to Hastings 1H22 · SE | 1h 19m |
13:58 | Plymouth to Manchester Piccadilly 1M61 · XC | 1h 13m |
21:56 | Brighton to Hastings 1U72 · SN | 1h 09m |
17:45 | Bournemouth to Manchester Piccadilly 1M70 · XC | 1h 08m |
15:36 | London Euston to Glasgow Central 9S85 · VT | 1h 07m |
17:04 | Edinburgh to Bristol Temple Meads 1V71 · XC | 58 min |
Through the day
Booked departures by hour.
The quietest was 02:00 with 10.
Buses
16,440 buses from 169 operators were seen on this date, across 3,113,516 position reports.
Bus punctuality was not yet being archived on this date, so only vehicle activity is shown. Nothing before that can be recovered.
Recorded live from the Darwin and TRUST feeds on 10 Aug 2026 itself. How these figures are measured · Sources and licences