Between 6 Aug 2026 to 23 Sept 2026, West Midlands Railway ran 60,067 recorded services and finished the period on 86% of its measured arrivals within five minutes, within a couple of points of the network as a whole.

Over 49 archived days that is 1,226 services a day, 5.0% of the national timetable. Of 40,846 recorded arrivals, 35,158 were within five minutes and 201 were more than half an hour down.

Its week is strongly peaked: 1,398 services on Friday, 21 August 2026 against 650 on Sunday, 9 August 2026, a swing of 2.2 times.

The average delay at destination was 1.9 minutes. The worst single arrival recorded was 1h 43m behind schedule, Tring to London Euston on Thursday, 10 September 2026.

Between Saturday, 19 September 2026 at 79% and Sunday, 30 August 2026 at 92% there are 13 points.

2,288 services were cancelled, 3.8% of everything booked — above the 2.4% the network cancelled over the same dates. The worst single day was Friday, 21 August 2026, at 13% of that day's timetable.

Counting those cancellations as failures, the way the industry's own measure does, takes the on-time share from 86% of recorded arrivals to 82% of everything booked whose outcome is known — 4.6 points.

West Midlands Railway in numbers

Archived days covered496 Aug 2026 to 23 Sept 2026
Passenger trains recorded60,067
Share of the national timetable5.0%of 1,203,226 over the same dates
Cancelled2,2883.8% · network 2.4%
Arrival time recorded40,84670.7% of those that ran
…arrived within 5 minutes35,15886.1%
…arrived 5 to 30 minutes late5,48713.4%
…arrived more than 30 minutes late2010.5%
Average delay at destination1.9 min
On time, counting cancellations81.5%of the 43,134 booked services whose outcome is known · network 84%
Network, same dates87%on time, against this operator's 86%

Every percentage among the bands is of the 40,846 services whose arrival reached the archive, not of all 60,067, and the bands are exclusive. 16,933 ran without an arrival being recorded, and nothing is claimed about those. The row counting cancellations is those same 35,158 on-time arrivals over a denominator that also holds the 2,288 trains that did not run at all. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it. The on-time share and the average delay answer different questions.

Day by day

49 archived days, 6 Aug 2026 to 23 Sept 2026, widest bar the busiest, filled to the share that arrived within five minutes. The same days across every operator.

DateRunsCancelledArrivalsOn time Incl. cancelled Avg delay
Wednesday, 23 September 20261,3422%1,03985% 82% 1.8 min
Tuesday, 22 September 20261,3222%1,26791% 89% 1.2 min
Monday, 21 September 20261,3164%1,23682% 79% 3 min
Sunday, 20 September 20267981%59188% 87% 1.5 min
Saturday, 19 September 20261,2014%89479% 75% 2.8 min
Friday, 18 September 20261,3301%1,26490% 90% 1.3 min
Thursday, 17 September 20261,3291%75184% 82% 2.1 min
Wednesday, 16 September 20261,3362%97981% 79% 2.4 min
Tuesday, 15 September 20261,2954%97082% 77% 2.4 min
Monday, 14 September 20261,2582%99486% 83% 1.7 min
Sunday, 13 September 20266525%47080% 75% 2.8 min
Saturday, 12 September 20261,2385%81788% 82% 1.5 min
Friday, 11 September 20261,2993%1,18088% 85% 1.3 min
Thursday, 10 September 20261,2893%99685% 82% 2 min
Wednesday, 9 September 20261,3442%1,17087% 86% 1.7 min
Tuesday, 8 September 20261,2962%1,22088% 86% 1.4 min
Monday, 7 September 20261,2831%1,04988% 87% 1.4 min
Sunday, 6 September 20267401%52589% 88% 1.3 min
Saturday, 5 September 20261,2652%1,19988% 86% 1.7 min
Friday, 4 September 20261,3241%1,28790% 89% 1.2 min
Thursday, 3 September 20261,3302%97684% 82% 2.2 min
Wednesday, 2 September 20261,3171%1,01486% 84% 1.7 min
Tuesday, 1 September 20261,3461%1,26486% 84% 1.8 min
Monday, 31 August 20261,3331%1,17192% 91% 0.8 min
Sunday, 30 August 20266720%62092% 92% 0.8 min
Saturday, 29 August 20261,2671%1,21389% 88% 1.3 min
Friday, 28 August 20261,3342%1,29485% 83% 1.9 min
Thursday, 27 August 20261,3333%1,24083% 81% 3.1 min
Wednesday, 26 August 20261,3442%1,26786% 84% 2 min
Tuesday, 25 August 20261,3382%1,25386% 84% 2 min
Monday, 24 August 20261,3393%1,12387% 83% 1.9 min
Sunday, 23 August 20266812%57988% 85% 1.5 min
Saturday, 22 August 20261,3654%87786% 81% 1.9 min
Friday, 21 August 20261,39813%1,01980% 68% 3.4 min
Thursday, 20 August 20261,30911%90386% 75% 1.7 min
Wednesday, 19 August 20261,36111%1,05390% 79% 1.4 min
Tuesday, 18 August 20261,3437%92389% 80% 1.4 min
Monday, 17 August 20261,3456%90482% 76% 2.2 min
Sunday, 16 August 20266637%42778% 70% 3.5 min
Saturday, 15 August 20261,24411%61980% 66% 2.4 min
Friday, 14 August 20261,36012%14485% 41% 3 min
Thursday, 13 August 20261,32811%2450% 7% 7.7 min
Wednesday, 12 August 20261,3343%4100% 8% 2 min early
Tuesday, 11 August 20261,27810%15091% 50% 0.6 min
Monday, 10 August 20261,2774%18984% 65% 2 min
Sunday, 9 August 20266500%6486% 85% 2.3 min
Saturday, 8 August 20261,2673%59288% 83% 2.2 min
Friday, 7 August 20261,3270%3789% 89% 0.7 min
Thursday, 6 August 20261,3270%5100% 83% 1.4 min early

In the daily longest-delay league

West Midlands Railway appears 4 times across 49 archived days, on 4 separate dates in the ten shown. These are appearances in the daily league, not this operator's own worst delays.

DateServiceLate by
10 Sept 2026Tring to London Euston 16:15 · 2T481h 43m
22 Sept 2026Bletchley to Bedford 19:52 · 2S291h 22m
23 Aug 2026London Euston to Crewe 12:45 · 1U351h 00m
2 Sept 2026Hereford to Birmingham New Street 18:40 · 1M8658 min

Recorded live from the Darwin and TRUST feeds on each of the 49 days above, and aggregated here. LM is this operator's ATOC code. How these figures are measured · All operators · Sources and licences