Tuesday, 18 August 2026 was a poor day on the railway: of the 19,063 passenger trains whose arrival was recorded, 88% were within five minutes, and a further 1,213 were cancelled outright.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
2,075 trains arrived more than five minutes late and 118 more than half an hour, against 16,870 that ran to time. The average delay across every train whose arrival was recorded was 1.4 minutes.
The reason attached most often to a late train was “This service has been delayed by a late running train being in front of this one” — 522 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.
The busiest hour was 07:00, with 1,680 booked departures and an average delay of 0.8 minutes.
The day in numbers
| Passenger trains recorded | 25,767 | |
|---|---|---|
| Cancelled | 1,213 | 4.7% |
| Arrival time recorded | 19,063 | 77.6% of those that ran |
| …arrived within 5 minutes | 16,870 | 88.5% |
| …arrived 5 to 30 minutes late | 2,075 | 10.9% |
| …arrived more than 30 minutes late | 118 | 0.6% |
| Average delay at destination | 1.4 min |
Every percentage among the bands is of the 19,063 trains whose arrival reached the archive — not of all 25,767, and the bands are exclusive. 5,491 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 2,995 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 2,995 | 0% | 2,143 | 96% | 96% | 0.3 min |
Northern NT | 2,789 | 2% | 2,490 | 93% | 91% | 0.6 min |
Great Western Railway GW | 2,150 | 2% | 1,472 | 83% | 81% | 2.3 min |
South Western Railway SW | 1,826 | 1% | 1,406 | 90% | 89% | 1.2 min |
Southern SN | 1,772 | 8% | 1,464 | 90% | 82% | 1.2 min |
Southeastern SE | 1,749 | 9% | 1,391 | 82% | 74% | 4.3 min |
London Overground LO | 1,591 | 14% | 1,273 | 94% | 80% | 0.1 min |
Greater Anglia LE | 1,432 | 15% | 1,083 | 90% | 75% | 0.6 min |
West Midlands Railway LM | 1,343 | 7% | 923 | 89% | 80% | 1.4 min |
Transport for Wales AW | 1,256 | 1% | 878 | 94% | 92% | -0.2 min |
Thameslink TL | 915 | 7% | 519 | 88% | 78% | 1.3 min |
London Underground LT | 767 | 0% | 181 | 96% | 95% | 1.3 min |
Elizabeth line XR | 690 | 4% | 625 | 88% | 84% | 0.6 min |
East Midlands Railway EM | 600 | 3% | 431 | 72% | 69% | 4.4 min |
Merseyrail ME | 589 | 3% | 363 | 93% | 88% | 0.5 min |
Great Northern GN | 437 | 1% | 336 | 90% | 89% | 1.4 min |
c2c CC | 419 | 12% | 293 | 72% | 61% | 4.3 min |
Avanti West Coast VT | 369 | 1% | 256 | 47% | 46% | 9.4 min |
Chiltern Railways CH | 362 | 7% | 321 | 92% | 85% | 1.1 min |
CrossCountry XC | 341 | 2% | 248 | 66% | 64% | 5.6 min |
TransPennine Express TP | 330 | 4% | 284 | 79% | 76% | 2.6 min |
London North Eastern Railway GR | 307 | 0% | 192 | 72% | 72% | 3.4 min |
Tyne and Wear Metro TW | 168 | 0% | 96 | 100% | 100% | -1 min |
Heathrow Express HX | 151 | 0% | 147 | 98% | 98% | 0.2 min |
Sheffield Supertram SJ | 97 | 0% | 40 | 100% | 100% | 0 min |
Gatwick Express GX | 71 | 1% | 68 | 88% | 87% | 1.9 min |
Island Line IL | 51 | 0% | 46 | 100% | 100% | 0.2 min |
Eurostar ES | 47 | 0% | 24 | 79% | 79% | 3.2 min |
Charter/Other ZZ | 42 | 0% | 1 | 100% | 100% | -4 min |
West Coast Railway Co WR | 24 | 0% | 5 | 100% | 100% | -10 min |
Grand Central GC | 19 | 0% | 18 | 67% | 67% | 7.1 min |
LS LS | 14 | 0% | 4 | 100% | 100% | -5.8 min |
Hull Trains HT | 14 | 36% | 8 | 88% | 54% | 1.1 min |
Lumo LD | 12 | 0% | 12 | 75% | 75% | -0.5 min |
Lumo Stirling LF | 10 | 20% | 7 | 71% | 56% | 4 min |
Caledonian Sleeper CS | 10 | 20% | 8 | 75% | 60% | -2.9 min |
North Yorkshire Moors Railway NY | 8 | 0% | 7 | 57% | 57% | -4 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 88% and 83% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
522 services
This service has been delayed by a speed restriction over defective track
456 services
This service has been delayed by a fault with the signalling system
387 services
This service has been delayed by a safety inspection of the track
277 services
This service has been delayed by a speed restriction
269 services
This service has been delayed by congestion
149 services
This service has been delayed by a problem currently under investigation
145 services
This service has been delayed by a fire next to the track
130 services
Why trains were cancelled
A reason reached the archive for 850 of the 1,213 cancellations (70.1%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a derailed train
244 services
This service has been cancelled because of a fire on property near the railway
211 services
This service has been cancelled because of a fault with the signalling system
140 services
This service has been cancelled because of a shortage of train drivers
106 services
This service has been cancelled because of urgent repairs to the track
43 services
This service has been cancelled because of a safety inspection of the track
36 services
This service has been cancelled because of a fire next to the track
36 services
This service has been cancelled because of the emergency services dealing with an incident
34 services
The longest delays
The worst of them arrived 3h 49m behind schedule — Gravesend to London Victoria, booked away at 21:49, run by Southeastern. The ten longest range from 3h 49m down to 2h 07m, and they belong to 2 operators, Southeastern accounting for 9. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
21:49 | Gravesend to London Victoria 2U78 · SE | 3h 49m |
20:20 | London Charing Cross to Gravesend 1N36 · SE | 3h 07m |
17:40 | London Victoria to Ramsgate 1S48 · SE | 2h 50m |
21:04 | London Charing Cross to Dover Priory 2R68 · SE | 2h 50m |
17:41 | London Cannon Street to Dover Priory 1G89 · SE | 2h 31m |
20:49 | Gravesend to London Victoria 2U74 · SE | 2h 27m |
17:42 | London Victoria to Gillingham (Kent) 2K42 · SE | 2h 20m |
18:12 | London Victoria to Gillingham (Kent) 2K44 · SE | 2h 14m |
18:41 | London Cannon Street to Dover Priory 1G93 · SE | 2h 09m |
15:47 | Elephant & Castle Underground to Harrow & Wealdstone 2J37 · LT | 2h 07m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 19:00, when 46% of 1,263 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 13.
What ran
Formations were recorded for 26,675 trains on this date, made up of 2,849 individual units and 12,476 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,193 of the day's recorded trains from a pool of 213 units.
The average train was 5.6 vehicles long. The longest formation recorded was 20 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,193 | 213 |
| Class 465 | 1,662 | 102 |
| Class 450 | 1,534 | 115 |
| Class 720 | 1,437 | 114 |
| Class 150 | 1,402 | 88 |
| Class 158 | 1,382 | 133 |
| Class 345 | 1,259 | 66 |
| Class 165 | 1,202 | 62 |
| Class 156 | 1,186 | 94 |
| Class 387 | 1,141 | 82 |
| Class 375 | 1,052 | 103 |
| Class 385 | 1,009 | 66 |
Of 25,767 runs, 26,675 had a formation published (104%) — these are allocations rather than observations.
Buses
16,023 buses from 161 operators were seen on this date, across 2,702,802 position reports.
117,800 bus journeys were followed to their destination on this date. 79,905 arrived on time, 5,735 late, and 32,160 — 27% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.4 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 117,800 | |
|---|---|---|
| On time | 79,905 | 67.8% |
| Early | 32,160 | 27.3% |
| Late | 5,735 | 4.9% |
| …more than 20 minutes late | 532 | 0.5% |
| Average arrival | 0.4 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 88,186 | 69% | 28% |
Nottingham City Transport NCTR | 2,257 | 77% | 19% |
Go North East GNEL | 1,743 | 77% | 13% |
First South Yorkshire FSYO | 1,740 | 59% | 32% |
First Bristol, Bath & the West FBRI | 1,443 | 58% | 30% |
First Leeds FLDS | 1,412 | 54% | 38% |
Arriva Yorkshire WRAY | 804 | 56% | 38% |
Bee Network BNSM | 796 | 77% | 20% |
National Express NATX | 796 | 31% | 36% |
First Potteries FPOT | 697 | 50% | 43% |
First Leicester FLEI | 622 | 55% | 40% |
Bee Network BNML | 540 | 72% | 24% |
Of the operators with enough journeys to compare, National Express West Midlands ran closest to time (87%), and National Express furthest from it (31%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 18 Aug 2026 itself. How these figures are measured · Sources and licences