TransitRadar

Great Western Railway

One train in 12 on the network over 6 Aug 2026 to 23 Sept 2026 was an Great Western Railway service. 83% of the 57,098 whose arrival was recorded were within five minutes, against 87% nationally over the same dates.

That is around 1,996 services a day. 57,098 arrivals were recorded: 47,480 within five minutes, 8,860 between five and thirty minutes down, and 758 more than half an hour late.

Its week is strongly peaked: 2,237 services on Tuesday, 25 August 2026 against 1,143 on Sunday, 6 September 2026, a swing of 2.0 times.

The average delay at destination was 2.5 minutes. The worst single arrival recorded was 4h 43m behind schedule, Cheltenham Spa to London Paddington on Monday, 14 September 2026.

The day-to-day spread is wide — 21 points between its best day, Thursday, 3 September 2026 at 90%, and its worst, Sunday, 6 September 2026 at 68%.

2,131 services were cancelled, 2.2% of everything booked — close to the 2.4% the network cancelled over the same dates. The worst single day was Thursday, 10 September 2026, at 7% of that day's timetable.

Counting those cancellations as failures, the way the industry's own measure does, takes the on-time share from 83% of recorded arrivals to 80% of everything booked whose outcome is known — 3.0 points.

Ranked on on-time share of recorded arrivals against the 30 operators with enough of them to compare, Great Western Railway comes 17th.

Great Western Railway in numbers

Archived days covered496 Aug 2026 to 23 Sept 2026
Passenger trains recorded97,823
Share of the national timetable8.1%of 1,203,226 over the same dates
Cancelled2,1312.2% · network 2.4%
Arrival time recorded57,09859.7% of those that ran
…arrived within 5 minutes47,48083.2%
…arrived 5 to 30 minutes late8,86015.5%
…arrived more than 30 minutes late7581.3%
Average delay at destination2.5 min
On time, counting cancellations80.2%of the 59,229 booked services whose outcome is known · network 84%
Network, same dates87%on time, against this operator's 83%

Every percentage among the bands is of the 57,098 services whose arrival reached the archive, not of all 97,823, and the bands are exclusive. 38,594 ran without an arrival being recorded, and nothing is claimed about those. The row counting cancellations is those same 47,480 on-time arrivals over a denominator that also holds the 2,131 trains that did not run at all. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it. The on-time share and the average delay answer different questions.

Day by day

49 archived days, 6 Aug 2026 to 23 Sept 2026, widest bar the busiest, filled to the share that arrived within five minutes. The same days across every operator.

DateRunsCancelledArrivalsOn time Incl. cancelled Avg delay
Wednesday, 23 September 20262,1895%1,27684% 77% 2.1 min
Tuesday, 22 September 20262,1692%1,66189% 87% 1.5 min
Monday, 21 September 20262,1621%1,66788% 88% 1.4 min
Sunday, 20 September 20261,2113%76674% 71% 5.7 min
Saturday, 19 September 20262,0042%1,36983% 80% 2.3 min
Friday, 18 September 20262,1861%1,63481% 80% 2.8 min
Thursday, 17 September 20262,1600%1,12188% 87% 1.3 min
Wednesday, 16 September 20262,1820%1,50486% 85% 2 min
Tuesday, 15 September 20262,1151%1,59086% 86% 1.7 min
Monday, 14 September 20262,0692%1,26281% 78% 4.3 min
Sunday, 13 September 20261,2284%75782% 77% 3.5 min
Saturday, 12 September 20262,0083%1,15783% 79% 2.8 min
Friday, 11 September 20262,1396%1,57783% 77% 2.3 min
Thursday, 10 September 20262,1347%1,43182% 74% 2.7 min
Wednesday, 9 September 20262,1846%1,43883% 76% 2.7 min
Tuesday, 8 September 20262,1496%1,54285% 79% 1.9 min
Monday, 7 September 20262,1266%1,44482% 75% 2.7 min
Sunday, 6 September 20261,1431%78768% 68% 4.9 min
Saturday, 5 September 20261,9592%1,29274% 72% 6.4 min
Friday, 4 September 20262,1841%1,70283% 82% 2.3 min
Thursday, 3 September 20262,1650%1,56790% 89% 1.3 min
Wednesday, 2 September 20262,1661%1,52986% 85% 1.7 min
Tuesday, 1 September 20262,1961%1,66585% 84% 2 min
Monday, 31 August 20261,8761%1,65490% 88% 1.2 min
Sunday, 30 August 20261,1853%87781% 78% 3.3 min
Saturday, 29 August 20262,0131%1,51285% 84% 2 min
Friday, 28 August 20262,1952%1,67381% 80% 2.8 min
Thursday, 27 August 20262,2282%1,61782% 80% 3.1 min
Wednesday, 26 August 20262,2271%1,66387% 87% 1.5 min
Tuesday, 25 August 20262,2370%1,65586% 85% 2.4 min
Monday, 24 August 20262,2202%1,56782% 80% 2.7 min
Sunday, 23 August 20261,1643%88486% 83% 1.9 min
Saturday, 22 August 20261,9853%1,27082% 78% 2.4 min
Friday, 21 August 20262,1573%1,55784% 80% 2 min
Thursday, 20 August 20262,1182%1,47684% 82% 1.9 min
Wednesday, 19 August 20262,1693%1,54579% 76% 3.1 min
Tuesday, 18 August 20262,1502%1,47283% 81% 2.3 min
Monday, 17 August 20262,2061%1,44182% 81% 2.5 min
Sunday, 16 August 20261,1766%74876% 69% 4 min
Saturday, 15 August 20262,0013%1,01478% 74% 3.7 min
Friday, 14 August 20262,1852%18969% 55% 5.4 min
Thursday, 13 August 20262,1695%6551% 19% 10.4 min
Wednesday, 12 August 20262,1950%2857% 57% 7.1 min
Tuesday, 11 August 20262,1331%22873% 69% 3.8 min
Monday, 10 August 20262,0741%31677% 73% 3.1 min
Sunday, 9 August 20261,1980%7282% 82% 2.7 min
Saturday, 8 August 20262,0060%75983% 83% 3.7 min
Friday, 7 August 20262,1673%6766% 33% 9 min
Thursday, 6 August 20262,1610%1182% 82% 0.7 min

In the daily longest-delay league

Great Western Railway appears 60 times across 49 archived days, on 3 separate dates in the ten shown. These are appearances in the daily league, not this operator's own worst delays.

DateServiceLate by
14 Sept 2026Cheltenham Spa to London Paddington 05:53 · 1L624h 43m
14 Sept 2026Swansea to London Paddington 06:26 · 1L074h 19m
5 Sept 2026Penzance to London Paddington 10:58 · 1A843h 45m
14 Sept 2026Swansea to London Paddington 07:18 · 1L103h 34m
5 Sept 2026Swansea to London Paddington 13:20 · 1L223h 22m
5 Sept 2026Hereford to London Paddington 15:14 · 1P323h 12m
5 Sept 2026Weston-super-Mare to London Paddington 16:02 · 1A283h 06m
14 Sept 2026Penzance to London Paddington 05:03 · 1A732h 49m
20 Sept 2026Swansea to London Paddington 11:43 · 1L602h 45m
5 Sept 2026Cheltenham Spa to London Paddington 17:03 · 1L842h 38m

Recorded live from the Darwin and TRUST feeds on each of the 49 days above, and aggregated here. GW is this operator's ATOC code. How these figures are measured · All operators · Sources and licences