TransitRadar

Tuesday, 1 September 2026

87% of the 21,845 passenger trains whose arrival was recorded on Tuesday, 1 September 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.

Of 26,564 recorded runs, 578 did not run at all. Among those whose arrival reached the archive, 19,001 were within five minutes, 2,670 between five and thirty minutes down, and 174 more than half an hour — the tail that people actually remember.

“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 516 services.

Merseyrail came closest to running to time, 98.2% of its 617 recorded arrivals; Great Northern had the largest cancelled share at 6.3%.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

The day in numbers

Passenger trains recorded26,564
Cancelled5782.2%
Arrival time recorded21,84584.1% of those that ran
…arrived within 5 minutes19,00187.0%
…arrived 5 to 30 minutes late2,67012.2%
…arrived more than 30 minutes late1740.8%
Average delay at destination1.7 min

Every percentage among the bands is of the 21,845 trains whose arrival reached the archive — not of all 26,564, and the bands are exclusive. 4,141 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

37 operators ran passenger services on this date, from ScotRail on 3,156 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,1561%2,238 96% 95% 0.4 min
Northern NT2,8471%2,704 90% 89% 1.1 min
Great Western Railway GW2,1961%1,665 85% 84% 2 min
South Western Railway SW1,9241%1,597 92% 91% 0.7 min
Southeastern SE1,8274%1,721 78% 75% 3.3 min
Southern SN1,6346%1,456 80% 75% 3 min
London Overground LO1,6096%1,461 97% 91% -0.4 min
West Midlands Railway LM1,3461%1,264 86% 84% 1.8 min
Greater Anglia LE1,3110%1,281 91% 91% 1 min
Transport for Wales AW1,3025%996 90% 85% 0.5 min
Thameslink TL9853%611 83% 78% 2.5 min
London Underground LT7850%334 95% 95% 0.9 min
c2c CC7260%354 75% 75% 3.2 min
Elizabeth line XR6983%676 95% 92% -0.6 min
East Midlands Railway EM6282%475 76% 74% 4.4 min
Merseyrail ME6220%617 98% 98% 0.1 min
Great Northern GN4326%338 78% 72% 4.1 min
Avanti West Coast VT4210%316 53% 53% 6.1 min
CrossCountry XC3533%275 52% 50% 11.1 min
Chiltern Railways CH3515%329 95% 90% 0.4 min
TransPennine Express TP3451%314 79% 78% 2.6 min
London North Eastern Railway GR3190%200 66% 66% 5.9 min
Tyne and Wear Metro TW1740%156 96% 96% 0.5 min
Heathrow Express HX1520%152 90% 90% 1.6 min
Sheffield Supertram SJ970%65 98% 98% 0.5 min
Gatwick Express GX726%64 47% 44% 8 min
Island Line IL520%49 98% 98% 1.3 min
Eurostar ES500%46 37% 37% 15.2 min
Charter/Other ZZ380%3 33% 33% 6.3 min
West Coast Railway Co WR240%10 100% 100% -7.5 min
Grand Central GC200%20 55% 55% 8 min
LS LS140%6 33% 33% 9.2 min
Hull Trains HT140%14 64% 64% 5.9 min
Lumo LD120%12 83% 83% 1.2 min
Lumo Stirling LF100%10 60% 60% 2.4 min
Caledonian Sleeper CS1020%8 100% 80% -16.8 min
North Yorkshire Moors Railway NY80%8 100% 100% -5.4 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 87% and 85% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

516 services

This service has been delayed by a speed restriction

492 services

This service has been delayed by a fault with the signalling system

393 services

This service has been delayed by a speed restriction over defective track

382 services

This service has been delayed by a fault with the signalling system earlier today

226 services

This service has been delayed by trespassers on the railway earlier today

122 services

This service has been delayed by trespassers on the railway

116 services

This service has been delayed by congestion

116 services

Why trains were cancelled

A reason reached the archive for 322 of the 578 cancellations (55.7%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a shortage of train drivers

84 services

This service has been cancelled because of a fault with the signalling system

75 services

This service has been cancelled because of a speed restriction

39 services

This service has been cancelled because of a fault on this train

29 services

This service has been cancelled because of urgent repairs to the track

25 services

This service has been cancelled because of emergency services dealing with an incident near the railway

24 services

This service has been cancelled because of a late running train being in front of this one

24 services

This service has been cancelled because of more trains than usual needing repairs at the same time

22 services

The longest delays

The worst of them arrived 3h 18m behind schedule — Great Yarmouth to Norwich, booked away at 09:14, run by Greater Anglia. The ten longest range from 3h 18m down to 1h 16m, and they belong to 4 operators, Greater Anglia accounting for 4. What a delay on that scale usually means.

BookedServiceLate by
09:14Great Yarmouth to Norwich 2P15 · LE3h 18m
08:47Lowestoft to Norwich 2J69 · LE3h 15m
09:47Lowestoft to Norwich 2J71 · LE2h 56m
09:55Warminster to Gloucester 2E58 · GW1h 51m
10:14Paignton to Manchester Piccadilly 1M41 · XC1h 39m
06:02Edinburgh to Plymouth 1V50 · XC1h 38m
09:03Manchester Piccadilly to Bristol Temple Meads 1V49 · XC1h 25m
13:52Peterborough to Ipswich 2L77 · LE1h 24m
10:47Ryde Pier Head to Shanklin 2D17 · IL1h 16m
10:27Plymouth to Edinburgh 1S47 · XC1h 16m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 56% of 154 arrived within five minutes.

00 154
01 40
02 13
03 24
04 154
05 946
06 1,638
07 1,697
08 1,568
09 1,459
10 1,431
11 1,408
12 1,411
13 1,410
14 1,437
15 1,475
16 1,583
17 1,655
18 1,545
19 1,364
20 1,237
21 1,142
22 1,030
23 743

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 13.

What ran

Formations were recorded for 26,994 trains on this date, made up of 2,890 individual units and 12,690 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,178 of the day's recorded trains from a pool of 221 units.

The average train was 5.6 vehicles long. The longest formation recorded was 16 vehicles.

ClassTrainsUnits used
Class 3773,178221
Class 4651,663101
Class 7201,596135
Class 4501,542120
Class 1581,416134
Class 1501,38190
Class 3871,26187
Class 3451,25466
Class 1651,18462
Class 1561,10991
Class 3751,049106
Class 7001,027104

Of 26,564 runs, 26,994 had a formation published (102%) — these are allocations rather than observations.

Buses

16,567 buses from 167 operators were seen on this date, across 3,097,640 position reports.

129,747 bus journeys were followed to their destination on this date. 90,891 arrived on time, 6,515 late, and 32,341 — 25% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.2 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination129,747
On time90,89170.1%
Early32,34124.9%
Late6,5155.0%
…more than 20 minutes late6660.5%
Average arrival0.2 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO103,93772%25%
Go North East GNEL2,12777%10%
Bee Network BNML97869%20%
Bee Network BNSM95079%19%
Arriva Yorkshire WRAY86258%30%
National Express NATX84528%36%
First Bristol, Bath & the West FBRI83072%22%
First Potteries FPOT82758%31%
First Leicester FLEI74059%36%
Preston Bus PBLT71663%29%
trentbarton TBTN53156%32%
Brighton & Hove Bus and Coach Company BHBC52382%12%

Of the operators with enough journeys to compare, Reading Buses ran closest to time (90%), and National Express furthest from it (28%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 1 Sept 2026 itself. How these figures are measured · Sources and licences