West Coast Railway Co
West Coast Railway Co ran 1,232 recorded passenger services from 6 Aug 2026 to 23 Sept 2026, and cancelled none of them. Arrival times reached the archive for too few of the rest to say anything about punctuality, so this is a record of what the operator ran.
Only 402 of the services that ran had an arrival time captured — 33% — spread across 49 archived days.
Volume ranged from 39 services on Saturday, 15 August 2026 down to 16 on Monday, 21 September 2026.
West Coast Railway Co in numbers
| Archived days covered | 49 | 6 Aug 2026 to 23 Sept 2026 |
|---|---|---|
| Passenger trains recorded | 1,232 | |
| Share of the national timetable | 0.1% | of 1,203,226 over the same dates |
| Cancelled | 0 | 0.0% · network 2.4% |
| Arrival time recorded | 402 | 32.6% of those that ran |
Every percentage among the bands is of the 402 services whose arrival reached the archive, not of all 1,232, and the bands are exclusive. 830 ran without an arrival being recorded, and nothing is claimed about those. Nothing was cancelled across the window, so counting cancellations leaves the figure unchanged. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it. The on-time share and the average delay answer different questions.
Day by day
49 archived days, 6 Aug 2026 to 23 Sept 2026, widest bar the busiest. The same days across every operator.
In the daily longest-delay league
West Coast Railway Co appears 2 times across 49 archived days, on 2 separate dates in the ten shown. These are appearances in the daily league, not this operator's own worst delays.
| Date | Service | Late by |
|---|---|---|
| 19 Aug 2026 | SCAREXS to Scarborough 15:59 · 5Z64 | 2h 37m |
| 27 Aug 2026 | Fort William to Mallaig 12:50 · 2Y68 | 1h 51m |
Recorded live from the Darwin and TRUST feeds on each of the 49 days above,
and aggregated here. WR is this operator's ATOC code. How these figures are measured · All operators · Sources and licences