TransitRadar

Wednesday, 30 September 2026

The railway ran close to plan on Wednesday, 30 September 2026: 88% of the 22,553 passenger trains whose arrival was recorded were within five minutes, and only 288 of 26,574 were cancelled.

19,943 of the 22,553 trains whose arrival was recorded were within five minutes, and the average delay was 1.7 minutes. Days like this rarely make the news, which is part of why they are worth recording.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

Even so, 154 trains were more than half an hour late. The worst was the 20:45 Inverness to London Euston, which arrived 2h 22m behind schedule.

Where a reason was given at all, the most frequent was “This service has been delayed by a speed restriction” (623 services).

Buses on this date: 136,896 journeys followed to their destination, 71.8% on time.

The day in numbers

Passenger trains recorded26,574
Cancelled2881.1%
Arrival time recorded22,55385.8% of those that ran
…arrived within 5 minutes19,94388.4%
…arrived 5 to 30 minutes late2,45610.9%
…arrived more than 30 minutes late1540.7%
Average delay at destination1.7 min

Every percentage among the bands is of the 22,553 trains whose arrival reached the archive — not of all 26,574, and the bands are exclusive. 3,733 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

37 operators ran passenger services on this date, from ScotRail on 3,060 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0600%2,273 97% 97% 0.5 min
Northern NT2,8781%2,743 89% 88% 1.5 min
Great Western Railway GW2,1830%1,699 84% 84% 2.1 min
Southeastern SE1,8312%1,766 84% 82% 2.9 min
South Western Railway SW1,7652%1,575 85% 84% 2 min
Southern SN1,7151%1,670 87% 86% 1.8 min
London Overground LO1,6151%1,578 99% 98% -0.4 min
West Midlands Railway LM1,3441%1,308 90% 89% 1.5 min
Greater Anglia LE1,3131%1,295 94% 94% 0.3 min
Transport for Wales AW1,2822%1,003 91% 88% 0.5 min
Thameslink TL9871%632 82% 81% 2.7 min
London Underground LT7920%412 95% 95% 1.2 min
TransPennine Express TP7772%341 84% 81% 2.5 min
Elizabeth line XR6973%652 87% 85% 1.6 min
East Midlands Railway EM6311%497 82% 81% 2.7 min
Merseyrail ME6220%619 99% 99% 0.1 min
Great Northern GN4493%351 72% 69% 6 min
Avanti West Coast VT4231%313 55% 54% 7.4 min
c2c CC4182%359 86% 85% 2.4 min
Chiltern Railways CH3557%326 95% 88% 0.7 min
CrossCountry XC3511%279 59% 58% 10 min
London North Eastern Railway GR3180%200 73% 73% 4.1 min
Tyne and Wear Metro TW1740%173 98% 98% 0.9 min
Heathrow Express HX1500%150 89% 89% 1.7 min
Sheffield Supertram SJ980%71 100% 100% 0.3 min
Gatwick Express GX720%69 71% 71% 4.1 min
Charter/Other ZZ540%4 75% 75% 0.5 min
Island Line IL520%52 100% 100% -0.3 min
Eurostar ES520%52 58% 58% 9.5 min
West Coast Railway Co WR220%10 100% 100% -10 min
Grand Central GC200%18 56% 56% 9.6 min
LS LS190%10 60% 60% 10.1 min
Hull Trains HT150%15 80% 80% 4.6 min
Lumo LD120%12 67% 67% 5.2 min
Lumo Stirling LF100%10 90% 90% -1 min
Caledonian Sleeper CS1010%8 63% 56% 32.1 min
North Yorkshire Moors Railway NY80%8 100% 100% -17.9 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 88% and 87% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a speed restriction

623 services

This service has been delayed by a late running train being in front of this one

600 services

This service has been delayed by a fault with the signalling system

210 services

This service has been delayed by a speed restriction over defective track

204 services

This service has been delayed by a safety inspection of the track

143 services

This service has been delayed by a fault on a train earlier

110 services

This service has been delayed by congestion

97 services

This service has been delayed by a fault on a train

96 services

Why trains were cancelled

A reason reached the archive for 151 of the 288 cancellations (52.4%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a fault with the signalling system

41 services

This service has been cancelled because of a late running train being in front of this one

28 services

This service has been cancelled because of a fault on this train

23 services

This service has been cancelled because of a fault on a train

15 services

This service has been cancelled because of a fault on a train earlier

13 services

This service has been cancelled because of a safety inspection of the track

12 services

This service has been cancelled because of a safety inspection of the track earlier today

11 services

This service has been cancelled because of a fault with the signalling system earlier today

8 services

The longest delays

The worst of them arrived 2h 22m behind schedule — Inverness to London Euston, booked away at 20:45, run by Caledonian Sleeper. The ten longest range from 2h 22m down to 1h 13m, and they belong to 6 operators, CrossCountry accounting for 4. What a delay on that scale usually means.

BookedServiceLate by
20:45Inverness to London Euston 1M16 · CS2h 22m
20:30London Euston to Preston 1P07 · VT2h 11m
23:40Glasgow Central to London Euston 1M11 · CS2h 00m
16:27Plymouth to Leeds 1E67 · XC1h 52m
15:03Manchester Piccadilly to Bristol Temple Meads 1V61 · XC1h 34m
12:05Edinburgh to Plymouth 1V62 · XC1h 31m
07:22Faversham to Ashford International 2W21 · SE1h 25m
16:55Worcester Foregate Street to Bristol Temple Meads 2T49 · GW1h 24m
15:27Plymouth to Newcastle 1E63 · XC1h 17m
14:06Birmingham New Street to London Euston 1Y46 · LM1h 13m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 43% of 181 arrived within five minutes.

00 181
01 51
02 14
03 27
04 150
05 940
06 1,632
07 1,687
08 1,566
09 1,459
10 1,438
11 1,413
12 1,415
13 1,418
14 1,440
15 1,475
16 1,576
17 1,647
18 1,544
19 1,364
20 1,240
21 1,139
22 1,031
23 727

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 14.

What ran

Formations were recorded for 27,427 trains on this date, made up of 2,909 individual units and 12,801 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,341 of the day's recorded trains from a pool of 222 units.

The average train was 5.6 vehicles long. The longest formation recorded was 24 vehicles.

ClassTrainsUnits used
Class 3773,341222
Class 4651,650103
Class 7201,500128
Class 4501,489119
Class 1581,435130
Class 1501,41290
Class 3871,38494
Class 3451,25566
Class 1561,21194
Class 1651,15061
Class 7001,043108
Class 3751,017104

Of 26,574 runs, 27,427 had a formation published (103%) — these are allocations rather than observations.

Buses

17,338 buses from 187 operators were seen on this date, across 3,152,877 position reports.

136,896 bus journeys were followed to their destination on this date. 98,318 arrived on time, 8,034 late, and 30,544 — 22% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

The average arrival was 0.1 minutes late, and 841 journeys finished more than fifteen minutes down.

Journeys followed to destination136,896
On time98,31871.8%
Early30,54422.3%
Late8,0345.9%
…more than 15 minutes late8410.6%
Average arrival0.1 min late

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO107,48674%23%
First South Yorkshire FSYO2,09158%23%
Go North East GNEL2,06873%9%
First Leeds FLDS1,67460%25%
Bee Network BNSM91576%17%
Arriva Yorkshire WRAY87556%29%
First Potteries FPOT85760%28%
National Express West Midlands TNXB85175%17%
National Express NATX74834%31%
Preston Bus PBLT73364%30%
First Leicester FLEI73265%31%
Bee Network BNML68570%21%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (88%), and National Express furthest from it (34%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 30 Sept 2026 itself. How these figures are measured · Sources and licences