TransitRadar

Southern

Southern recorded 79,831 services from 6 Aug 2026 to 23 Sept 2026 and cancelled 3,039 of them. Of those whose arrival was captured, 83% were within five minutes — below the national figure for the same days.

Over 49 archived days that is 1,629 services a day, 6.6% of the national timetable. Of 56,433 recorded arrivals, 46,726 were within five minutes and 415 were more than half an hour down.

Its week is strongly peaked: 1,800 services on Wednesday, 19 August 2026 against 1,104 on Sunday, 9 August 2026, a swing of 1.6 times.

The average delay at destination was 2.5 minutes. The worst single arrival recorded was 2h 50m behind schedule, London Victoria to Littlehampton on Thursday, 17 September 2026.

The day-to-day spread is wide — 21 points between its best day, Tuesday, 22 September 2026 at 90%, and its worst, Sunday, 16 August 2026 at 69%.

3,039 services were cancelled, 3.8% of everything booked — above the 2.4% the network cancelled over the same dates. The worst single day was Saturday, 15 August 2026, at 11% of that day's timetable.

Counting those cancellations as failures, the way the industry's own measure does, takes the on-time share from 83% of recorded arrivals to 79% of everything booked whose outcome is known — 4.2 points.

Ranked on on-time share of recorded arrivals against the 30 operators with enough of them to compare, Southern comes 18th.

Southern in numbers

Archived days covered496 Aug 2026 to 23 Sept 2026
Passenger trains recorded79,831
Share of the national timetable6.6%of 1,203,226 over the same dates
Cancelled3,0393.8% · network 2.4%
Arrival time recorded56,43373.5% of those that ran
…arrived within 5 minutes46,72682.8%
…arrived 5 to 30 minutes late9,29216.5%
…arrived more than 30 minutes late4150.7%
Average delay at destination2.5 min
On time, counting cancellations78.6%of the 59,472 booked services whose outcome is known · network 84%
Network, same dates87%on time, against this operator's 83%

Every percentage among the bands is of the 56,433 services whose arrival reached the archive, not of all 79,831, and the bands are exclusive. 20,359 ran without an arrival being recorded, and nothing is claimed about those. The row counting cancellations is those same 46,726 on-time arrivals over a denominator that also holds the 3,039 trains that did not run at all. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it. The on-time share and the average delay answer different questions.

Day by day

49 archived days, 6 Aug 2026 to 23 Sept 2026, widest bar the busiest, filled to the share that arrived within five minutes. The same days across every operator.

DateRunsCancelledArrivalsOn time Incl. cancelled Avg delay
Wednesday, 23 September 20261,7258%1,35877% 70% 4.6 min
Tuesday, 22 September 20261,7052%1,64190% 88% 1.3 min
Monday, 21 September 20261,6923%1,58984% 81% 2.3 min
Sunday, 20 September 20261,4641%1,07687% 87% 1.6 min
Saturday, 19 September 20261,7452%1,38587% 85% 1.7 min
Friday, 18 September 20261,7031%1,65983% 82% 2.5 min
Thursday, 17 September 20261,6804%1,11079% 75% 3 min
Wednesday, 16 September 20261,7793%1,53285% 83% 1.9 min
Tuesday, 15 September 20261,7213%1,54182% 80% 2.5 min
Monday, 14 September 20261,6993%1,53084% 81% 2.3 min
Sunday, 13 September 20261,3222%90082% 80% 2.5 min
Saturday, 12 September 20261,7432%1,25489% 87% 1.1 min
Friday, 11 September 20261,6003%1,45783% 80% 2.7 min
Thursday, 10 September 20261,6835%1,37481% 76% 2.8 min
Wednesday, 9 September 20261,6546%1,31775% 69% 4.1 min
Tuesday, 8 September 20261,5956%1,42578% 74% 3.2 min
Monday, 7 September 20261,6023%1,46185% 82% 2.1 min
Sunday, 6 September 20261,4362%96883% 80% 2.5 min
Saturday, 5 September 20261,6703%1,41781% 78% 2.9 min
Friday, 4 September 20261,6234%1,47381% 77% 2.8 min
Thursday, 3 September 20261,6163%1,43079% 76% 3.1 min
Wednesday, 2 September 20261,5924%1,41878% 74% 3.2 min
Tuesday, 1 September 20261,6346%1,45680% 75% 3 min
Monday, 31 August 20261,7483%1,42088% 85% 1.3 min
Sunday, 30 August 20261,1354%91178% 74% 3 min
Saturday, 29 August 20261,7633%1,46184% 81% 2.3 min
Friday, 28 August 20261,7603%1,57983% 80% 2.6 min
Thursday, 27 August 20261,7902%1,63682% 81% 2.4 min
Wednesday, 26 August 20261,7483%1,58285% 82% 2 min
Tuesday, 25 August 20261,7671%1,59984% 83% 2.3 min
Monday, 24 August 20261,7423%1,50684% 81% 2.2 min
Sunday, 23 August 20261,2235%90476% 71% 3.4 min
Saturday, 22 August 20261,5958%1,19781% 73% 3 min
Friday, 21 August 20261,7024%1,51980% 76% 3.1 min
Thursday, 20 August 20261,6769%1,36484% 76% 2.3 min
Wednesday, 19 August 20261,80010%1,52787% 78% 1.9 min
Tuesday, 18 August 20261,7728%1,46490% 82% 1.2 min
Monday, 17 August 20261,78710%1,24385% 75% 2.6 min
Sunday, 16 August 20261,1729%82369% 61% 6.3 min
Saturday, 15 August 20261,60911%95386% 72% 2.2 min
Friday, 14 August 20261,6845%22483% 62% 3.6 min
Thursday, 13 August 20261,6701%7676% 63% 3.6 min
Wednesday, 12 August 20261,6890%2176% 73% 3.2 min
Tuesday, 11 August 20261,6491%24793% 87% 0.7 min
Monday, 10 August 20261,6282%31679% 71% 3.3 min
Sunday, 9 August 20261,1040%14882% 81% 4.8 min
Saturday, 8 August 20261,5880%84588% 88% 2.6 min
Friday, 7 August 20261,6790%8487% 83% 2.3 min
Thursday, 6 August 20261,6680%1392% 92% 1.5 min

In the daily longest-delay league

Southern appears 27 times across 49 archived days, on 7 separate dates in the ten shown. These are appearances in the daily league, not this operator's own worst delays.

DateServiceLate by
17 Sept 2026London Victoria to Littlehampton 12:46 · 1H282h 50m
19 Aug 2026Redhill to Tonbridge 17:00 · 2A482h 50m
17 Sept 2026Southampton Central to Brighton 12:50 · 1N312h 24m
21 Sept 2026Redhill to Tonbridge 17:00 · 2A482h 16m
4 Sept 2026Barnham to Portsmouth Harbour 15:31 · 1Z442h 04m
23 Sept 2026London Victoria to Eastbourne 20:24 · 1F581h 47m
2 Sept 2026East Croydon to London Bridge 15:52 · 2J421h 46m
7 Sept 2026Barnham to Portsmouth Harbour 05:21 · 1S021h 37m
7 Sept 2026Portsmouth Harbour to Barnham 06:29 · 1Z111h 34m
23 Sept 2026London Victoria to London Bridge 07:50 · 2F121h 31m

Recorded live from the Darwin and TRUST feeds on each of the 49 days above, and aggregated here. SN is this operator's ATOC code. How these figures are measured · All operators · Sources and licences