The railway ran close to plan on Tuesday, 6 October 2026: 91% of the 22,467 passenger trains whose arrival was recorded were within five minutes, and only 345 of 25,940 were cancelled.

20,362 of the 22,467 trains whose arrival was recorded were within five minutes, and the average delay was 1.1 minutes. Days like this rarely make the news, which is part of why they are worth recording.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

Even so, 94 trains were more than half an hour late. The worst was the 09:50 Exeter St Davids to Cardiff Central, which arrived 2h 10m behind schedule.

Where a reason was given at all, the most frequent was “This service has been delayed by a late running train being in front of this one” (574 services).

The day in numbers

Passenger trains recorded25,940
Cancelled3451.3%
Arrival time recorded22,46787.8% of those that ran
…arrived within 5 minutes20,36290.6%
…arrived 5 to 30 minutes late2,0119.0%
…arrived more than 30 minutes late940.4%
Average delay at destination1.1 min

Every percentage among the bands is of the 22,467 trains whose arrival reached the archive — not of all 25,940, and the bands are exclusive. 3,128 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

37 operators ran passenger services on this date, from ScotRail on 3,043 runs down to Caledonian Sleeper on 6. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0430%2,264 95% 95% 0.7 min
Northern NT2,8291%2,717 90% 89% 1.2 min
Great Western Railway GW2,1881%1,672 86% 85% 2 min
Southeastern SE1,8261%1,782 90% 89% 1.4 min
South Western Railway SW1,7521%1,579 92% 91% 0.8 min
Southern SN1,7332%1,651 87% 85% 1.7 min
London Overground LO1,6062%1,575 98% 96% -0.4 min
West Midlands Railway LM1,3391%1,300 91% 90% 1.1 min
Greater Anglia LE1,3081%1,291 93% 92% 0.4 min
Transport for Wales AW1,2422%1,039 94% 92% -0.5 min
Thameslink TL9732%619 92% 89% 1 min
London Underground LT7860%409 97% 97% 1 min
Elizabeth line XR7005%633 91% 86% 1.4 min
East Midlands Railway EM6280%495 84% 83% 2.2 min
Merseyrail ME6151%608 97% 96% 0.5 min
Great Northern GN4302%386 81% 79% 3 min
c2c CC4241%364 98% 97% 1 min
Avanti West Coast VT4171%311 65% 64% 5.1 min
Chiltern Railways CH3638%333 88% 81% 1.7 min
CrossCountry XC3501%280 72% 71% 5.9 min
TransPennine Express TP3322%311 81% 80% 2 min
London North Eastern Railway GR3171%198 77% 77% 2 min
Tyne and Wear Metro TW1740%173 95% 95% 1.1 min
Heathrow Express HX1520%152 97% 97% 0.3 min
Sheffield Supertram SJ980%74 100% 100% -0.1 min
Gatwick Express GX720%70 87% 87% 1.7 min
Island Line IL520%52 100% 100% -0.6 min
Eurostar ES520%52 83% 83% 3.3 min
Charter/Other ZZ430%3 100% 100% -9.7 min
Grand Central GC215%20 60% 57% 5.8 min
West Coast Railway Co WR180%6 100% 100% -10 min
Hull Trains HT150%15 73% 73% 5 min
Lumo Stirling LF100%10 80% 80% 2 min
Lumo LD100%10 90% 90% 0.4 min
North Yorkshire Moors Railway NY80%8 100% 100% -39.4 min
LS LS80%0 — — —
Caledonian Sleeper CS617%5 80% 67% -2.6 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 91% and 89% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

574 services

This service has been delayed by a speed restriction

437 services

This service has been delayed by a broken down train earlier today

253 services

This service has been delayed by a speed restriction over defective track

243 services

This service has been delayed by a fault with the signalling system

239 services

This service has been delayed by congestion

237 services

This service has been delayed by a fault on a train earlier

118 services

This service has been delayed by a problem currently under investigation

88 services

Why trains were cancelled

A reason reached the archive for 168 of the 345 cancellations (48.7%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a fault with the signalling system

31 services

This service has been cancelled because of a fault on this train

24 services

This service has been cancelled because of a late running train being in front of this one

22 services

This service has been cancelled because of a broken down train earlier today

21 services

This service has been cancelled because of congestion

20 services

This service has been cancelled because of a short-notice change to the timetable

19 services

This service has been cancelled because of a broken down train

17 services

This service has been cancelled because of a late running freight train

14 services

The longest delays

The worst of them arrived 2h 10m behind schedule — Exeter St Davids to Cardiff Central, booked away at 09:50, run by Great Western Railway. The ten longest range from 2h 10m down to 1h 25m, and they belong to 4 operators, Elizabeth line accounting for 4. What a delay on that scale usually means.

BookedServiceLate by
09:50Exeter St Davids to Cardiff Central 2U12 · GW2h 10m
06:42York to Plymouth 1V46 · XC1h 58m
09:08Gloucester to Weymouth 2O74 · GW1h 38m
13:57Haywards Heath to Eastbourne 1F30 · SN1h 33m
08:44Abbey Wood to Reading 9R06 · XR1h 31m
14:33Eastbourne to Haywards Heath 1F39 · SN1h 30m
09:00Abbey Wood to Maidenhead 9N14 · XR1h 27m
08:54Abbey Wood to Heathrow Airport T4 9H12 · XR1h 26m
09:42London Paddington to Shenfield 9W90 · XR1h 26m
09:28Cardiff Central to Portsmouth Harbour 1F11 · GW1h 25m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 61% of 152 arrived within five minutes.

00 128
01 44
02 13
03 26
04 152
05 929
06 1,606
07 1,652
08 1,532
09 1,435
10 1,411
11 1,385
12 1,393
13 1,387
14 1,410
15 1,449
16 1,552
17 1,612
18 1,518
19 1,340
20 1,206
21 1,118
22 995
23 647

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 13.

What ran

Formations were recorded for 27,344 trains on this date, made up of 2,931 individual units and 12,856 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,314 of the day's recorded trains from a pool of 223 units.

The average train was 5.6 vehicles long. The longest formation recorded was 18 vehicles.

ClassTrainsUnits used
Class 3773,314223
Class 4651,619104
Class 7201,541131
Class 4501,519120
Class 1581,465140
Class 3871,43595
Class 1501,38686
Class 3451,24267
Class 1651,22463
Class 1561,09188
Class 3751,046102
Class 7001,024106

Of 25,940 runs, 27,344 had a formation published (105%) — these are allocations rather than observations.

Buses

17,338 buses from 186 operators were seen on this date, across 3,203,782 position reports.

138,940 bus journeys were followed to their destination on this date. 98,974 arrived on time, 7,785 late, and 32,181 — 23% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

The average arrival was 0 minutes late, and 828 journeys finished more than twenty minutes down.

Journeys followed to destination138,940
On time98,97471.2%
Early32,18123.2%
Late7,7855.6%
…more than 20 minutes late8280.6%
Average arrival0 min late

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO106,68173%24%
Nottingham City Transport NCTR2,17875%17%
First South Yorkshire FSYO2,10060%25%
Go North East GNEL2,03872%10%
First Leeds FLDS1,69360%27%
Bee Network BNSM93078%17%
First Potteries FPOT86455%31%
National Express West Midlands TNXB84079%16%
Arriva Yorkshire WRAY82659%26%
First Leicester FLEI76161%34%
National Express NATX75233%33%
Preston Bus PBLT71763%31%

Of the operators with enough journeys to compare, Reading Buses ran closest to time (88%), and National Express furthest from it (33%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 6 Oct 2026 itself. How these figures are measured · Sources and licences