Avanti West Coast appears on 49 archived days from 6 Aug 2026 to 23 Sept 2026, running 379 services a day. 44% of its recorded arrivals were within five minutes, which is below the network as a whole.

10,912 arrivals were recorded across the window, 4,831 of them within five minutes and 784 more than half an hour late. At this volume a single badly delayed working is worth a visible fraction of a percentage point.

Volume moved between 270 services on Sunday, 6 September 2026 and 424 on Friday, 4 September 2026.

The average delay at destination was 10.2 minutes. The worst single arrival recorded was 1h 53m behind schedule, London Euston to Glasgow Central on Saturday, 22 August 2026.

The day-to-day spread is wide — 59 points between its best day, Sunday, 30 August 2026 at 74%, and its worst, Friday, 21 August 2026 at 15%.

430 services were cancelled, 2.3% of everything booked — close to the 2.4% the network cancelled over the same dates. The worst single day was Saturday, 8 August 2026, at 19% of that day's timetable.

Counting those cancellations as failures, the way the industry's own measure does, takes the on-time share from 44% of recorded arrivals to 43% of everything booked whose outcome is known — 1.7 points.

Ranked on on-time share of recorded arrivals against the 30 operators with enough of them to compare, Avanti West Coast comes 30th.

Avanti West Coast in numbers

Archived days covered496 Aug 2026 to 23 Sept 2026
Passenger trains recorded18,570
Share of the national timetable1.5%of 1,203,226 over the same dates
Cancelled4302.3% · network 2.4%
Arrival time recorded10,91260.2% of those that ran
…arrived within 5 minutes4,83144.3%
…arrived 5 to 30 minutes late5,29748.5%
…arrived more than 30 minutes late7847.2%
Average delay at destination10.2 min
On time, counting cancellations42.6%of the 11,342 booked services whose outcome is known · network 84%
Network, same dates87%on time, against this operator's 44%

Every percentage among the bands is of the 10,912 services whose arrival reached the archive, not of all 18,570, and the bands are exclusive. 7,228 ran without an arrival being recorded, and nothing is claimed about those. The row counting cancellations is those same 4,831 on-time arrivals over a denominator that also holds the 430 trains that did not run at all. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it. The on-time share and the average delay answer different questions.

Day by day

49 archived days, 6 Aug 2026 to 23 Sept 2026, widest bar the busiest, filled to the share that arrived within five minutes. The same days across every operator.

DateRunsCancelledArrivalsOn time Incl. cancelled Avg delay
Wednesday, 23 September 20264211%29442% 41% 13 min
Tuesday, 22 September 20264171%30856% 56% 7.2 min
Monday, 21 September 20264180%31755% 55% 7 min
Sunday, 20 September 20263401%17768% 67% 5.2 min
Saturday, 19 September 20263533%24532% 31% 14.7 min
Friday, 18 September 20264190%31454% 54% 6.1 min
Thursday, 17 September 20264151%18716% 15% 14.9 min
Wednesday, 16 September 20264191%27927% 26% 12.9 min
Tuesday, 15 September 20264060%30736% 36% 9.6 min
Monday, 14 September 20263972%28933% 33% 13.4 min
Sunday, 13 September 20262834%20222% 21% 13.9 min
Saturday, 12 September 20263860%25062% 62% 4.7 min
Friday, 11 September 20264081%31157% 56% 7.3 min
Thursday, 10 September 20264061%30851% 50% 7.5 min
Wednesday, 9 September 20264192%29331% 31% 14.8 min
Tuesday, 8 September 20264072%29645% 44% 8.3 min
Monday, 7 September 20264061%30248% 47% 9 min
Sunday, 6 September 20262700%20161% 60% 6.3 min
Saturday, 5 September 20263931%28643% 43% 9 min
Friday, 4 September 20264241%31049% 49% 8.2 min
Thursday, 3 September 20264200%29244% 44% 8.3 min
Wednesday, 2 September 20264201%30346% 45% 8.4 min
Tuesday, 1 September 20264210%31653% 53% 6.1 min
Monday, 31 August 20263871%31552% 52% 7.3 min
Sunday, 30 August 20262830%18274% 74% 3.6 min
Saturday, 29 August 20263951%28140% 39% 9.1 min
Friday, 28 August 20263852%26920% 20% 18.8 min
Thursday, 27 August 20263872%27326% 25% 18.7 min
Wednesday, 26 August 20263841%27544% 43% 9 min
Tuesday, 25 August 20263841%27556% 56% 6.4 min
Monday, 24 August 20263842%26743% 42% 11.4 min
Sunday, 23 August 20262864%20540% 38% 11.1 min
Saturday, 22 August 20263817%23959% 53% 6.1 min
Friday, 21 August 20263745%24315% 14% 30.3 min
Thursday, 20 August 20263661%26542% 42% 8.2 min
Wednesday, 19 August 20263730%27660% 60% 7.1 min
Tuesday, 18 August 20263691%25647% 46% 9.4 min
Monday, 17 August 20263861%25342% 41% 10.5 min
Sunday, 16 August 20262892%20137% 36% 17.7 min
Saturday, 15 August 20263510%21244% 44% 8.3 min
Friday, 14 August 20263861%1729% 26% 13.9 min
Thursday, 13 August 20263803%1315% 9% 34.8 min
Wednesday, 12 August 20263861%683% 56% 2.7 min
Tuesday, 11 August 20263691%4457% 54% 5.2 min
Monday, 10 August 202636411%5817% 10% 21.6 min
Sunday, 9 August 202629514%3100% 7% 2.7 min
Saturday, 8 August 202639319%8033% 17% 14.8 min
Friday, 7 August 202638312%1080% 15% 0.1 min
Thursday, 6 August 20263824%743% 14% 17.4 min

In the daily longest-delay league

Avanti West Coast appears 40 times across 49 archived days, on 6 separate dates in the ten shown. These are appearances in the daily league, not this operator's own worst delays.

DateServiceLate by
22 Aug 2026London Euston to Glasgow Central 18:30 · 1S951h 53m
23 Sept 2026London Euston to Glasgow Central 13:40 · 9S771h 52m
29 Aug 2026Preston to London Euston 19:07 · 1T171h 46m
21 Aug 2026Glasgow Central to London Euston 14:34 · 1M151h 43m
11 Sept 2026Glasgow Central to London Euston 08:00 · 9M511h 41m
23 Sept 2026Glasgow Central to London Euston 17:30 · 1M181h 40m
28 Aug 2026London Euston to Glasgow Central 09:36 · 9S551h 38m
21 Aug 2026London Euston to Edinburgh 08:40 · 9S541h 37m
23 Sept 2026London Euston to Glasgow Central 11:40 · 9S651h 34m
23 Sept 2026Glasgow Central to London Euston 18:40 · 1M191h 33m

Recorded live from the Darwin and TRUST feeds on each of the 49 days above, and aggregated here. VT is this operator's ATOC code. How these figures are measured · All operators · Sources and licences