Wednesday, 14 October 2026
87% of the 19,829 passenger trains whose arrival was recorded on Wednesday, 14 October 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 26,063 recorded runs, 440 did not run at all. Among those whose arrival reached the archive, 17,218 were within five minutes, 2,475 between five and thirty minutes down, and 136 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 682 services.
Merseyrail came closest to running to time, 97.7% of its 394 recorded arrivals; Chiltern Railways had the largest cancelled share at 12.1%.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
Buses on this date: 134,759 journeys followed to their destination, 72.4% on time.
The day in numbers
| Passenger trains recorded | 26,063 | |
|---|---|---|
| Cancelled | 440 | 1.7% |
| Arrival time recorded | 19,829 | 77.4% of those that ran |
| …arrived within 5 minutes | 17,218 | 86.8% |
| …arrived 5 to 30 minutes late | 2,475 | 12.5% |
| …arrived more than 30 minutes late | 136 | 0.7% |
| Average delay at destination | 1.7 min |
Every percentage among the bands is of the 19,829 trains whose arrival reached the archive — not of all 26,063, and the bands are exclusive. 5,794 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from ScotRail on 3,015 runs down to LS on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,015 | 1% | 2,076 | 87% | 86% | 1.8 min |
Northern NT | 2,834 | 1% | 2,523 | 91% | 90% | 1.1 min |
Great Western Railway GW | 2,173 | 1% | 1,498 | 83% | 82% | 2.4 min |
Southeastern SE | 1,802 | 3% | 1,591 | 78% | 76% | 3.4 min |
South Western Railway SW | 1,748 | 1% | 1,426 | 92% | 92% | 0.5 min |
Southern SN | 1,710 | 1% | 1,631 | 90% | 89% | 1.4 min |
London Overground LO | 1,605 | 3% | 1,497 | 96% | 94% | 0 min |
West Midlands Railway LM | 1,339 | 1% | 1,006 | 84% | 82% | 2 min |
Greater Anglia LE | 1,309 | 0% | 1,244 | 95% | 95% | 0.2 min |
Transport for Wales AW | 1,250 | 4% | 872 | 90% | 84% | 0.5 min |
Thameslink TL | 982 | 6% | 449 | 80% | 70% | 3.1 min |
Merseyrail ME | 811 | 0% | 394 | 98% | 97% | -0.2 min |
London Underground LT | 779 | 0% | 150 | 95% | 95% | 1.3 min |
Elizabeth line XR | 693 | 3% | 619 | 87% | 83% | 0.9 min |
East Midlands Railway EM | 624 | 1% | 412 | 75% | 73% | 4.4 min |
Great Northern GN | 429 | 2% | 341 | 79% | 77% | 2.9 min |
Avanti West Coast VT | 420 | 2% | 277 | 43% | 42% | 11.1 min |
c2c CC | 417 | 2% | 347 | 79% | 77% | 3.1 min |
Chiltern Railways CH | 347 | 12% | 294 | 92% | 80% | 1.8 min |
CrossCountry XC | 346 | 1% | 255 | 67% | 66% | 5.6 min |
TransPennine Express TP | 337 | 2% | 266 | 79% | 77% | 2.6 min |
London North Eastern Railway GR | 327 | 1% | 195 | 81% | 80% | 1.7 min |
Tyne and Wear Metro TW | 174 | 0% | 86 | 99% | 99% | 0 min |
Heathrow Express HX | 152 | 0% | 139 | 86% | 86% | 3.1 min |
Sheffield Supertram SJ | 97 | 0% | 36 | 100% | 100% | 0.2 min |
Gatwick Express GX | 72 | 0% | 70 | 84% | 84% | 2.9 min |
Charter/Other ZZ | 60 | 0% | 1 | 100% | 100% | 0 min |
Island Line IL | 52 | 0% | 35 | 94% | 94% | 0.2 min |
Eurostar ES | 50 | 0% | 25 | 68% | 68% | 4 min |
Grand Central GC | 20 | 0% | 19 | 68% | 68% | 4.7 min |
West Coast Railway Co WR | 18 | 0% | 3 | 100% | 100% | -9.3 min |
Hull Trains HT | 15 | 0% | 15 | 80% | 80% | 4.1 min |
Lumo LD | 11 | 9% | 9 | 78% | 70% | 1.9 min |
Lumo Stirling LF | 10 | 0% | 7 | 43% | 43% | 4 min |
Caledonian Sleeper CS | 10 | 10% | 7 | 86% | 75% | -7.1 min |
TY TY | 9 | 0% | 7 | 86% | 86% | 0.4 min |
North Yorkshire Moors Railway NY | 8 | 0% | 7 | 100% | 100% | -35.7 min |
LS LS | 8 | 0% | 0 | — | — | — |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 87% and 85% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
682 services
This service has been delayed by a speed restriction
623 services
This service has been delayed by congestion
373 services
This service has been delayed by a speed restriction over defective track
202 services
This service has been delayed by trespassers on the railway earlier today
190 services
This service has been delayed by slippery rails
163 services
This service has been delayed by a safety inspection of the track
163 services
This service has been delayed by a fault with the signalling system
158 services
Why trains were cancelled
A reason reached the archive for 225 of the 440 cancellations (51.1%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a person being hit by a train earlier today
48 services
This service has been cancelled because of a late running train being in front of this one
44 services
This service has been cancelled because of trespassers on the railway earlier today
28 services
This service has been cancelled because of congestion
25 services
This service has been cancelled because of trespassers on the railway
24 services
This service has been cancelled because of an obstruction on the track earlier today
22 services
This service has been cancelled because of police dealing with an incident near the railway earlier today
17 services
This service has been cancelled because of a fault on this train
17 services
The longest delays
The worst of them arrived 1h 55m behind schedule — Manchester Piccadilly to Nottingham, booked away at 21:41, run by East Midlands Railway. The ten longest range from 1h 55m down to 1h 12m, and they belong to 7 operators, East Midlands Railway accounting for 4. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
21:41 | Manchester Piccadilly to Nottingham 1L82 · EM | 1h 55m |
15:14 | Elephant & Castle Underground to Stonebridge Park 2I21 · LT | 1h 40m |
10:35 | Sheffield to London St Pancras (Intl) 1C38 · EM | 1h 21m |
21:14 | Sheffield to Manchester Piccadilly 2S79 · NT | 1h 21m |
11:00 | Sheffield to London St Pancras (Intl) 1C41 · EM | 1h 18m |
15:50 | Heathrow Airport T5 to Shenfield 9W32 · XR | 1h 18m |
15:27 | Heathrow Airport T5 to London Paddington 1Y63 · HX | 1h 15m |
10:50 | Nottingham to London St Pancras (Intl) 1B37 · EM | 1h 14m |
05:02 | Ashford International to London Victoria 2A06 · SE | 1h 12m |
10:56 | Three Bridges to Bedford 9R26 · TL | 1h 12m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 47% of 157 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 15.
What ran
Formations were recorded for 19,316 trains on this date, made up of 2,533 individual units and 11,132 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 2,305 of the day's recorded trains from a pool of 188 units.
The average train was 5.6 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 2,305 | 188 |
| Class 465 | 1,463 | 97 |
| Class 450 | 1,404 | 114 |
| Class 720 | 1,268 | 115 |
| Class 387 | 1,061 | 83 |
| Class 158 | 992 | 109 |
| Class 375 | 983 | 103 |
| Class 730 | 929 | 72 |
| Class 150 | 815 | 82 |
| Class 165 | 767 | 55 |
| Class 156 | 742 | 78 |
| Class 777 | 739 | 43 |
Of 26,063 runs, 19,316 had a formation published (74%) — these are allocations rather than observations.
Buses
17,765 buses from 187 operators were seen on this date, across 3,189,889 position reports.
134,759 bus journeys were followed to their destination on this date. 97,591 arrived on time, 7,846 late, and 29,322 — 22% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0.3 minutes late, and 819 journeys finished more than fifteen minutes down.
| Journeys followed to destination | 134,759 | |
|---|---|---|
| On time | 97,591 | 72.4% |
| Early | 29,322 | 21.8% |
| Late | 7,846 | 5.8% |
| …more than 15 minutes late | 819 | 0.6% |
| Average arrival | 0.3 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 101,803 | 75% | 22% |
Nottingham City Transport NCTR | 2,141 | 78% | 15% |
Go North East GNEL | 2,098 | 75% | 9% |
First South Yorkshire FSYO | 2,037 | 58% | 23% |
First Leeds FLDS | 1,659 | 61% | 24% |
First Bristol, Bath & the West FBRI | 1,446 | 61% | 25% |
Arriva Yorkshire WRAY | 899 | 54% | 27% |
Bee Network BNSM | 892 | 78% | 15% |
National Express West Midlands TNXB | 870 | 78% | 14% |
First Potteries FPOT | 869 | 56% | 29% |
Preston Bus PBLT | 742 | 65% | 29% |
First Leicester FLEI | 737 | 59% | 36% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (90%), and National Express furthest from it (32%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 14 Oct 2026 itself. How these figures are measured · Sources and licences