TransitRadar

Grand Central

Grand Central appears on 93 archived days from 6 Aug 2026 to 7 Nov 2026, running 21 services a day. 53% of its recorded arrivals were within five minutes, which is below the network as a whole.

1,547 arrivals were recorded across the window, 821 of them within five minutes and 121 more than half an hour late. At this volume a single badly delayed working is worth a visible fraction of a percentage point.

Its week is strongly peaked: 29 services on Saturday, 8 August 2026 against 8 on Sunday, 1 November 2026, a swing of 3.6 times.

The average delay at destination was 9.6 minutes. The worst single arrival recorded was 2h 07m behind schedule, London Kings Cross to Bradford Interchange on Tuesday, 29 September 2026.

The day-to-day spread is wide — 65 points between its best day, Wednesday, 19 August 2026 at 85%, and its worst, Wednesday, 7 October 2026 at 20%.

58 services were cancelled, 3.0% of everything booked — above the 2.3% the network cancelled over the same dates. The worst single day was Friday, 6 November 2026, at 17% of that day's timetable.

Counting those cancellations as failures, the way the industry's own measure does, takes the on-time share from 53% of recorded arrivals to 51% of everything booked whose outcome is known — 1.9 points.

Ranked on on-time share of recorded arrivals against the 34 operators with enough of them to compare, Grand Central comes 33rd.

Grand Central in numbers

Archived days covered936 Aug 2026 to 7 Nov 2026
Passenger trains recorded1,909
Share of the national timetable0.1%of 2,316,422 over the same dates
Cancelled583.0% · network 2.3%
Arrival time recorded1,54783.6% of those that ran
…arrived within 5 minutes82153.1%
…arrived 5 to 30 minutes late60539.1%
…arrived more than 30 minutes late1217.8%
Average delay at destination9.6 min
On time, counting cancellations51.2%of the 1,605 booked services whose outcome is known · network 84%
Network, same dates87%on time, against this operator's 53%

Every percentage among the bands is of the 1,547 services whose arrival reached the archive, not of all 1,909, and the bands are exclusive. 304 ran without an arrival being recorded, and nothing is claimed about those. The row counting cancellations is those same 821 on-time arrivals over a denominator that also holds the 58 trains that did not run at all. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it. The on-time share and the average delay answer different questions.

Day by day

93 archived days, 6 Aug 2026 to 7 Nov 2026, widest bar the busiest, filled to the share that arrived within five minutes. The same days across every operator.

DateRunsCancelledArrivalsRecordedOn time Incl. cancelled Avg delay
Saturday, 7 November 2026200%20100%40% 40% 9.2 min
Friday, 6 November 20262417%20100%30% 25% 10.8 min
Thursday, 5 November 2026210%21100%38% 38% 14.2 min
Wednesday, 4 November 20262010%18100%44% 40% 10.1 min
Tuesday, 3 November 2026210%21100%38% 38% 13.4 min
Monday, 2 November 2026200%20100%45% 45% 8.3 min
Sunday, 1 November 202680%8100%88% 88% 1.9 min
Saturday, 31 October 202680%8100%63% 63% 4.9 min
Friday, 30 October 2026190%19100%37% 37% 9 min
Thursday, 29 October 2026200%20100%45% 45% 16 min
Wednesday, 28 October 2026258%23100%26% 24% 17.3 min
Tuesday, 27 October 2026200%20100%30% 30% 19.8 min
Monday, 26 October 20261911%1694%19% 17% 21 min
Sunday, 25 October 2026813%571%20% 17% 24.8 min
Saturday, 24 October 202680%788%57% 57% 6 min
Friday, 23 October 2026190%19100%47% 47% 11.7 min
Thursday, 22 October 2026200%1995%68% 68% 7.6 min
Wednesday, 21 October 2026200%20100%35% 35% 13 min
Tuesday, 20 October 2026200%20100%75% 75% 4 min
Monday, 19 October 2026205%1895%61% 58% 10.2 min
Sunday, 18 October 2026130%1292%42% 42% 11.6 min
Saturday, 17 October 20262110%1789%76% 68% 3.5 min
Friday, 16 October 2026200%20100%75% 75% 3 min
Thursday, 15 October 2026205%19100%79% 75% 4.2 min
Wednesday, 14 October 2026200%1995%68% 68% 4.7 min
Tuesday, 13 October 2026200%20100%35% 35% 16.2 min
Monday, 12 October 2026215%1995%53% 50% 5.4 min
Sunday, 11 October 2026180%18100%67% 67% 5.1 min
Saturday, 10 October 2026200%20100%65% 65% 5.7 min
Friday, 9 October 2026200%20100%30% 30% 15.6 min
Thursday, 8 October 2026200%20100%45% 45% 9.4 min
Wednesday, 7 October 2026210%2095%20% 20% 25.8 min
Tuesday, 6 October 2026215%20100%60% 57% 5.8 min
Monday, 5 October 2026229%20100%60% 55% 12 min
Sunday, 4 October 20261911%1482%71% 63% 7.8 min
Saturday, 3 October 2026200%20100%70% 70% 6.2 min
Friday, 2 October 20262110%19100%63% 57% 7 min
Thursday, 1 October 2026239%1990%58% 52% 5.1 min
Wednesday, 30 September 2026200%1890%56% 56% 9.6 min
Tuesday, 29 September 2026200%20100%40% 40% 16 min
Monday, 28 September 2026215%20100%50% 48% 7.4 min
Sunday, 27 September 2026205%1895%83% 79% 1.6 min
Saturday, 26 September 2026229%1890%67% 60% 3.7 min
Friday, 25 September 2026229%1995%63% 57% 6.4 min
Thursday, 24 September 2026200%20100%70% 70% 3.9 min
Wednesday, 23 September 2026200%1995%47% 47% 7.9 min
Tuesday, 22 September 2026229%20100%65% 59% 5 min
Monday, 21 September 2026200%20100%65% 65% 5.5 min
Sunday, 20 September 2026180%18100%94% 94% 0.6 min
Saturday, 19 September 20262010%18100%78% 70% 3.6 min
Friday, 18 September 20262110%19100%58% 52% 5.1 min
Thursday, 17 September 2026200%1470%71% 71% 4.4 min
Wednesday, 16 September 2026200%1890%56% 56% 4.1 min
Tuesday, 15 September 20262214%1579%53% 44% 10 min
Monday, 14 September 20262110%1895%67% 60% 3.5 min
Sunday, 13 September 2026244%1461%100% 93% 0.2 min
Saturday, 12 September 2026270%1763%71% 71% 3 min
Friday, 11 September 2026200%20100%60% 60% 6.2 min
Thursday, 10 September 2026210%1990%47% 47% 13.2 min
Wednesday, 9 September 2026215%1995%58% 55% 6.4 min
Tuesday, 8 September 2026200%20100%65% 65% 4.8 min
Monday, 7 September 2026200%20100%60% 60% 5.4 min
Sunday, 6 September 2026260%1869%67% 67% 4.2 min
Saturday, 5 September 2026280%2071%40% 40% 15.2 min
Friday, 4 September 20262417%20100%25% 21% 22.8 min
Thursday, 3 September 2026200%20100%45% 45% 6 min
Wednesday, 2 September 2026215%1995%63% 60% 6.7 min
Tuesday, 1 September 2026200%20100%55% 55% 8 min
Monday, 31 August 2026210%21100%33% 33% 22.8 min
Saturday, 29 August 2026190%19100%68% 68% 3.5 min
Friday, 28 August 2026200%20100%40% 40% 7.8 min
Thursday, 27 August 2026200%20100%20% 20% 15.2 min
Wednesday, 26 August 2026225%21100%24% 23% 17.7 min
Tuesday, 25 August 2026220%22100%59% 59% 4.5 min
Monday, 24 August 2026229%1890%11% 10% 44.8 min
Sunday, 23 August 2026240%1875%67% 67% 6.2 min
Saturday, 22 August 2026270%1970%58% 58% 5.5 min
Friday, 21 August 2026229%1995%32% 29% 12.7 min
Thursday, 20 August 2026200%1995%21% 21% 20.7 min
Wednesday, 19 August 2026200%20100%85% 85% 2.9 min
Tuesday, 18 August 2026190%1895%67% 67% 7.1 min
Monday, 17 August 2026229%1575%40% 35% 10.8 min
Sunday, 16 August 2026268%1042%30% 25% 33.5 min
Saturday, 15 August 2026270%1763%59% 59% 5.6 min
Friday, 14 August 2026200%00%— — —
Thursday, 13 August 2026200%15%0% 0% 34 min
Wednesday, 12 August 2026200%00%— — —
Tuesday, 11 August 2026200%210%100% 100% 0.5 min early
Monday, 10 August 2026200%420%25% 25% 8.5 min
Sunday, 9 August 2026260%00%— — —
Saturday, 8 August 2026290%828%50% 50% 15.5 min
Friday, 7 August 2026200%00%— — —
Thursday, 6 August 2026200%00%— — —

In the daily longest-delay league

Grand Central appears 7 times across 93 archived days, on 6 separate dates in the ten shown. These are appearances in the daily league, not this operator's own worst delays.

DateServiceLate by
29 Sept 2026London Kings Cross to Bradford Interchange 13:17 · 1D832h 07m
24 Aug 2026Bradford Interchange to London Kings Cross 08:56 · 1A701h 56m
29 Oct 2026Sunderland to London Kings Cross 17:32 · 1A691h 41m
31 Aug 2026London Kings Cross to Sunderland 17:00 · 1N951h 28m
31 Aug 2026Sunderland to London Kings Cross 12:32 · 1A651h 16m
10 Sept 2026London Kings Cross to Sunderland 13:00 · 1N931h 14m
4 Oct 2026London Kings Cross to Sunderland 13:00 · 1N9357 min

Recorded live from the Darwin and TRUST feeds on each of the 93 days above, and aggregated here. GC is this operator's ATOC code. How these figures are measured · All operators · Sources and licences