24,655 passenger trains were recorded on Saturday, 8 August 2026 and 226 of them were cancelled. Arrival times were not captured for most of this day, so it is a record of what ran rather than of how punctual it was.

24,655 passenger services were recorded as having been scheduled and settled on this date. Arrival times reached the archive for only 10,297 of them, so nothing is claimed here about how late the rest were — the figures below cover what ran and what did not.

A weekend timetable, so the 24,655 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.

226 services were cancelled, 0.9% of everything booked. The reason given most often was “This service has been cancelled because of a shortage of train crew”, on 95 of them. Cancellation reasons are close to complete even on days like this, and they are the operators' own wording, reproduced unedited.

Avanti West Coast lost the largest share of its own timetable, 19.1% of 393 booked runs.

The day in numbers

Passenger trains recorded24,655
Cancelled2260.9%
Arrival time recorded10,29742.2% of those that ran

Every percentage among the bands is of the 10,297 trains whose arrival reached the archive — not of all 24,655, and the bands are exclusive. 14,132 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

Punctuality is not reported for this date. Arrival times reached the archive for only 10,297 of the 24,429 trains that ran (42.2%), and a punctuality figure drawn from that would describe the sample rather than the railway. What ran, what was cancelled and why are recorded in full below.

By operator

39 operators ran passenger services on this date, from ScotRail on 2,840 runs down to Caledonian Sleeper on 3. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR2,8400%
Northern NT2,8300%
Great Western Railway GW2,0060%
South Western Railway SW1,9410%
Southern SN1,5880%
Transport for Wales AW1,5310%
London Overground LO1,4995%
Southeastern SE1,4940%
Greater Anglia LE1,3060%
West Midlands Railway LM1,2673%
Thameslink TL8710%
Elizabeth line XR6650%
Merseyrail ME6220%
TransPennine Express TP5611%
East Midlands Railway EM4950%
London Underground LT4210%
Avanti West Coast VT39319%
Great Northern GN3474%
c2c CC3440%
CrossCountry XC3390%
London North Eastern Railway GR3012%
Chiltern Railways CH2300%
Tyne and Wear Metro TW1650%
Heathrow Express HX1520%
Sheffield Supertram SJ980%
Gatwick Express GX730%
Island Line IL520%
Eurostar ES460%
Charter/Other ZZ350%
West Coast Railway Co WR350%
Grand Central GC290%
Lumo LD120%
Hull Trains HT120%
TY TY100%
Lumo Stirling LF100%
North Yorkshire Moors Railway NY80%
SO SO60%
LS LS40%
Caledonian Sleeper CS30%

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a fault with the signalling system

20 services

This service has been delayed by trespassers on the railway earlier today

14 services

This service has been delayed by a fault with the signalling system earlier today

12 services

This service has been delayed by trespassers on the railway

10 services

This service has been delayed by a late running train being in front of this one

9 services

This service has been delayed by train crew being delayed

5 services

This service has been delayed by a fire next to the track earlier today

5 services

This service has been delayed by the train departing late to maintain customer connections

3 services

Why trains were cancelled

A reason reached the archive for 216 of the 226 cancellations (95.6%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a shortage of train crew

95 services

This service has been cancelled because of a shortage of train drivers

73 services

This service has been cancelled because of forecasted severe weather

32 services

This service has been cancelled because of a shortage of train managers

5 services

This service has been cancelled because of a short-notice change to the timetable

4 services

This service has been cancelled because of a fault with the signalling system

3 services

This service has been cancelled because of urgent repairs to the railway

2 services

This service has been cancelled because of a fire on property near the railway

2 services

The longest delays

The worst of them arrived 2h 04m behind schedule — LARATMD to LARATMD, booked away at 01:55, run by an operator. The ten longest range from 2h 04m down to 1h 14m, and they belong to 6 operators, Southeastern accounting for 3. What a delay on that scale usually means.

BookedServiceLate by
01:55LARATMD to LARATMD · 2h 04m
15:25Exeter St Davids to London Waterloo 1L60 · SW1h 43m
19:18Dover Priory to Faversham 2U64 · SE1h 33m
14:53Ramsgate to London Victoria 1P46 · SE1h 25m
14:59Milford Haven to Manchester Piccadilly 1W24 · AW1h 24m
17:10London Victoria to Dover Priory 1S46 · SE1h 18m
18:22Cardiff Central to Holyhead 1W83 · AW1h 18m
20:50Eastbourne to Ashford International 2D66 · SN1h 16m
15:02Pembroke Dock to London Paddington 1L30 · GW1h 15m
18:10Cardiff Central to Cheltenham Spa 2G72 · AW1h 14m

Through the day

Booked departures by hour.

00 139
01 42
02 24
03 39
04 131
05 742
06 1,368
07 1,371
08 1,396
09 1,388
10 1,431
11 1,407
12 1,433
13 1,416
14 1,428
15 1,413
16 1,441
17 1,445
18 1,402
19 1,279
20 1,181
21 1,085
22 977
23 677

The quietest was 02:00 with 24.

Buses

15,431 buses from 153 operators were seen on this date, across 2,803,176 position reports.

Bus punctuality was not yet being archived on this date, so only vehicle activity is shown. Nothing before that can be recovered.

Recorded live from the Darwin and TRUST feeds on 8 Aug 2026 itself. How these figures are measured · Sources and licences