Saturday, 8 August 2026
24,655 passenger trains were recorded on Saturday, 8 August 2026 and 226 of them were cancelled. Arrival times were not captured for most of this day, so it is a record of what ran rather than of how punctual it was.
24,655 passenger services were recorded as having been scheduled and settled on this date. Arrival times reached the archive for only 10,297 of them, so nothing is claimed here about how late the rest were — the figures below cover what ran and what did not.
A weekend timetable, so the 24,655 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.
226 services were cancelled, 0.9% of everything booked. The reason given most often was “This service has been cancelled because of a shortage of train crew”, on 95 of them. Cancellation reasons are close to complete even on days like this, and they are the operators' own wording, reproduced unedited.
Avanti West Coast lost the largest share of its own timetable, 19.1% of 393 booked runs.
The day in numbers
| Passenger trains recorded | 24,655 | |
|---|---|---|
| Cancelled | 226 | 0.9% |
| Arrival time recorded | 10,297 | 42.2% of those that ran |
Every percentage among the bands is of the 10,297 trains whose arrival reached the archive — not of all 24,655, and the bands are exclusive. 14,132 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
39 operators ran passenger services on this date, from ScotRail on 2,840 runs down to Caledonian Sleeper on 3. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||
|---|---|---|
ScotRail SR | 2,840 | 0% |
Northern NT | 2,830 | 0% |
Great Western Railway GW | 2,006 | 0% |
South Western Railway SW | 1,941 | 0% |
Southern SN | 1,588 | 0% |
Transport for Wales AW | 1,531 | 0% |
London Overground LO | 1,499 | 5% |
Southeastern SE | 1,494 | 0% |
Greater Anglia LE | 1,306 | 0% |
West Midlands Railway LM | 1,267 | 3% |
Thameslink TL | 871 | 0% |
Elizabeth line XR | 665 | 0% |
Merseyrail ME | 622 | 0% |
TransPennine Express TP | 561 | 1% |
East Midlands Railway EM | 495 | 0% |
London Underground LT | 421 | 0% |
Avanti West Coast VT | 393 | 19% |
Great Northern GN | 347 | 4% |
c2c CC | 344 | 0% |
CrossCountry XC | 339 | 0% |
London North Eastern Railway GR | 301 | 2% |
Chiltern Railways CH | 230 | 0% |
Tyne and Wear Metro TW | 165 | 0% |
Heathrow Express HX | 152 | 0% |
Sheffield Supertram SJ | 98 | 0% |
Gatwick Express GX | 73 | 0% |
Island Line IL | 52 | 0% |
Eurostar ES | 46 | 0% |
Charter/Other ZZ | 35 | 0% |
West Coast Railway Co WR | 35 | 0% |
Grand Central GC | 29 | 0% |
Lumo LD | 12 | 0% |
Hull Trains HT | 12 | 0% |
TY TY | 10 | 0% |
Lumo Stirling LF | 10 | 0% |
North Yorkshire Moors Railway NY | 8 | 0% |
SO SO | 6 | 0% |
LS LS | 4 | 0% |
Caledonian Sleeper CS | 3 | 0% |
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a fault with the signalling system
20 services
This service has been delayed by trespassers on the railway earlier today
14 services
This service has been delayed by a fault with the signalling system earlier today
12 services
This service has been delayed by trespassers on the railway
10 services
This service has been delayed by a late running train being in front of this one
9 services
This service has been delayed by train crew being delayed
5 services
This service has been delayed by a fire next to the track earlier today
5 services
This service has been delayed by the train departing late to maintain customer connections
3 services
Why trains were cancelled
A reason reached the archive for 216 of the 226 cancellations (95.6%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a shortage of train crew
95 services
This service has been cancelled because of a shortage of train drivers
73 services
This service has been cancelled because of forecasted severe weather
32 services
This service has been cancelled because of a shortage of train managers
5 services
This service has been cancelled because of a short-notice change to the timetable
4 services
This service has been cancelled because of a fault with the signalling system
3 services
This service has been cancelled because of urgent repairs to the railway
2 services
This service has been cancelled because of a fire on property near the railway
2 services
The longest delays
The worst of them arrived 2h 04m behind schedule — LARATMD to LARATMD, booked away at 01:55, run by an operator. The ten longest range from 2h 04m down to 1h 14m, and they belong to 6 operators, Southeastern accounting for 3. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
01:55 | LARATMD to LARATMD · | 2h 04m |
15:25 | Exeter St Davids to London Waterloo 1L60 · SW | 1h 43m |
19:18 | Dover Priory to Faversham 2U64 · SE | 1h 33m |
14:53 | Ramsgate to London Victoria 1P46 · SE | 1h 25m |
14:59 | Milford Haven to Manchester Piccadilly 1W24 · AW | 1h 24m |
17:10 | London Victoria to Dover Priory 1S46 · SE | 1h 18m |
18:22 | Cardiff Central to Holyhead 1W83 · AW | 1h 18m |
20:50 | Eastbourne to Ashford International 2D66 · SN | 1h 16m |
15:02 | Pembroke Dock to London Paddington 1L30 · GW | 1h 15m |
18:10 | Cardiff Central to Cheltenham Spa 2G72 · AW | 1h 14m |
Through the day
Booked departures by hour.
The quietest was 02:00 with 24.
Buses
15,431 buses from 153 operators were seen on this date, across 2,803,176 position reports.
Bus punctuality was not yet being archived on this date, so only vehicle activity is shown. Nothing before that can be recovered.
Recorded live from the Darwin and TRUST feeds on 8 Aug 2026 itself. How these figures are measured · Sources and licences