Friday, 7 August 2026
26,163 passenger trains were recorded on Friday, 7 August 2026 and 426 of them were cancelled. Arrival times were not captured for most of this day, so it is a record of what ran rather than of how punctual it was.
26,163 passenger services were recorded as having been scheduled and settled on this date. Arrival times reached the archive for only 1,080 of them, so nothing is claimed here about how late the rest were — the figures below cover what ran and what did not.
Friday carries the heaviest long-distance loading of the week, and it is the day on which a late-afternoon problem has the fewest spare paths to recover into.
426 services were cancelled, 1.6% of everything booked. The reason given most often was “This service has been cancelled because of a fire next to the track”, on 140 of them. Cancellation reasons are close to complete even on days like this, and they are the operators' own wording, reproduced unedited.
Avanti West Coast lost the largest share of its own timetable, 11.7% of 383 booked runs.
The day in numbers
| Passenger trains recorded | 26,163 | |
|---|---|---|
| Cancelled | 426 | 1.6% |
| Arrival time recorded | 1,080 | 4.2% of those that ran |
Every percentage among the bands is of the 1,080 trains whose arrival reached the archive — not of all 26,163, and the bands are exclusive. 24,657 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from ScotRail on 3,091 runs down to TY on 4. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||
|---|---|---|
ScotRail SR | 3,091 | 0% |
Northern NT | 2,820 | 1% |
Great Western Railway GW | 2,167 | 3% |
South Western Railway SW | 1,897 | 1% |
Southern SN | 1,679 | 0% |
Southeastern SE | 1,657 | 0% |
London Overground LO | 1,614 | 6% |
Transport for Wales AW | 1,586 | 5% |
West Midlands Railway LM | 1,327 | 0% |
Greater Anglia LE | 1,318 | 0% |
Thameslink TL | 943 | 1% |
London Underground LT | 776 | 0% |
Elizabeth line XR | 699 | 1% |
East Midlands Railway EM | 616 | 0% |
Merseyrail ME | 615 | 0% |
Great Northern GN | 440 | 0% |
c2c CC | 417 | 1% |
Avanti West Coast VT | 383 | 12% |
Chiltern Railways CH | 348 | 0% |
CrossCountry XC | 347 | 3% |
TransPennine Express TP | 321 | 8% |
London North Eastern Railway GR | 319 | 1% |
Tyne and Wear Metro TW | 174 | 0% |
Heathrow Express HX | 151 | 0% |
Sheffield Supertram SJ | 98 | 0% |
Gatwick Express GX | 71 | 0% |
Eurostar ES | 54 | 0% |
Charter/Other ZZ | 52 | 0% |
Island Line IL | 52 | 15% |
Grand Central GC | 20 | 0% |
West Coast Railway Co WR | 16 | 0% |
Hull Trains HT | 14 | 0% |
Lumo LD | 12 | 8% |
Lumo Stirling LF | 10 | 0% |
Caledonian Sleeper CS | 10 | 0% |
LS LS | 9 | 0% |
North Yorkshire Moors Railway NY | 8 | 0% |
TY TY | 4 | 0% |
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
40 services
This service has been delayed by congestion
35 services
This service has been delayed by a fire next to the track earlier today
28 services
This service has been delayed by a fault with the signalling system
14 services
This service has been delayed by a road vehicle colliding with a bridge earlier today
13 services
This service has been delayed by a fault with the signalling system earlier today
11 services
This service has been delayed by train crew being delayed by service disruption
7 services
This service has been delayed by a fire on property near the railway earlier today
6 services
Why trains were cancelled
A reason reached the archive for 396 of the 426 cancellations (93.0%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fire next to the track
140 services
This service has been cancelled because of a shortage of train drivers
108 services
This service has been cancelled because of a shortage of train crew
64 services
This service has been cancelled because of failure of the electricity supply
32 services
This service has been cancelled because of a fault with the signalling system
17 services
This service has been cancelled because of more trains than usual needing repairs at the same time
14 services
This service has been cancelled because of a fire next to the track earlier today
14 services
This service has been cancelled because of a fault on a train
7 services
The longest delays
The worst of them arrived 3h 05m behind schedule — Liverpool Lime Street to Norwich, booked away at 15:51, run by East Midlands Railway. The ten longest range from 3h 05m down to 45 min, and they belong to 6 operators, Great Western Railway accounting for 4. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
15:51 | Liverpool Lime Street to Norwich 1L15 · EM | 3h 05m |
20:23 | Swansea to London Paddington 1L36 · GW | 1h 31m |
17:03 | London Paddington to Penzance 1C90 · GW | 1h 11m |
20:25 | Manchester Piccadilly to Reading 1V94 · XC | 1h 07m |
20:52 | London Paddington to Great Malvern 1W41 · GW | 1h 03m |
19:00 | London Kings Cross to Edinburgh 1S30 · GR | 1h 03m |
20:59 | FRATCSD to FRATCSD · | 1h 01m |
14:04 | Edinburgh to Plymouth 1V66 · XC | 53 min |
22:30 | London Waterloo to Portsmouth Harbour 1P75 · SW | 50 min |
17:50 | Penzance to London Paddington 1A39 · GW | 45 min |
Through the day
Booked departures by hour.
The quietest was 02:00 with 13.
Buses
7,668 buses from 102 operators were seen on this date, across 298,141 position reports.
Bus punctuality was not yet being archived on this date, so only vehicle activity is shown. Nothing before that can be recovered.
Recorded live from the Darwin and TRUST feeds on 7 Aug 2026 itself. How these figures are measured · Sources and licences