TransitRadar

Lumo

Lumo appears on 49 archived days from 6 Aug 2026 to 23 Sept 2026, running 11 services a day. 63% of its recorded arrivals were within five minutes, which is below the network as a whole.

446 arrivals were recorded across the window, 283 of them within five minutes and 43 more than half an hour late. At this volume a single badly delayed working is worth a visible fraction of a percentage point.

Its week is strongly peaked: 12 services on Wednesday, 23 September 2026 against 6 on Sunday, 30 August 2026, a swing of 2.0 times.

The average delay at destination was 8.4 minutes. The worst single arrival recorded was 2h 38m behind schedule, Edinburgh to London Kings Cross on Monday, 24 August 2026.

12 services were cancelled, 2.2% of everything booked — close to the 2.4% the network cancelled over the same dates.

Counting those cancellations as failures, the way the industry's own measure does, takes the on-time share from 63% of recorded arrivals to 62% of everything booked whose outcome is known — 1.7 points.

Lumo in numbers

Archived days covered496 Aug 2026 to 23 Sept 2026
Passenger trains recorded558
Share of the national timetable0.0%of 1,203,226 over the same dates
Cancelled122.2% · network 2.4%
Arrival time recorded44681.7% of those that ran
…arrived within 5 minutes28363.5%
…arrived 5 to 30 minutes late12026.9%
…arrived more than 30 minutes late439.6%
Average delay at destination8.4 min
On time, counting cancellations61.8%of the 458 booked services whose outcome is known · network 84%
Network, same dates87%on time, against this operator's 63%

Every percentage among the bands is of the 446 services whose arrival reached the archive, not of all 558, and the bands are exclusive. 100 ran without an arrival being recorded, and nothing is claimed about those. The row counting cancellations is those same 283 on-time arrivals over a denominator that also holds the 12 trains that did not run at all. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it. The on-time share and the average delay answer different questions.

Day by day

49 archived days, 6 Aug 2026 to 23 Sept 2026, widest bar the busiest, filled to the share that arrived within five minutes. The same days across every operator.

DateRunsCancelledArrivalsOn time Incl. cancelled Avg delay
Wednesday, 23 September 2026120%1275% 75% 2.5 min
Tuesday, 22 September 2026120%1292% 92% 1.6 min
Monday, 21 September 2026119%1060% 55% 7.5 min
Sunday, 20 September 2026100%1090% 90% 1.5 min
Saturday, 19 September 2026100%838% 38% 6.1 min
Friday, 18 September 2026110%1173% 73% 4.5 min
Thursday, 17 September 2026110%978% 78% 2.7 min
Wednesday, 16 September 2026110%1182% 82% 1.1 min
Tuesday, 15 September 2026100%1060% 60% 10.2 min
Monday, 14 September 2026110%1182% 82% 0.2 min
Sunday, 13 September 2026110%1182% 82% 0.4 min early
Saturday, 12 September 2026120%11100% 100% 1.2 min
Friday, 11 September 2026120%1283% 83% 2.2 min
Thursday, 10 September 2026120%1267% 67% 3.6 min
Wednesday, 9 September 2026120%1173% 73% 2.4 min
Tuesday, 8 September 2026120%1267% 67% 3.2 min
Monday, 7 September 2026120%1283% 83% 0.8 min
Sunday, 6 September 2026110%1145% 45% 4.9 min
Saturday, 5 September 2026120%1250% 50% 10.3 min
Friday, 4 September 2026128%1118% 17% 52 min
Thursday, 3 September 2026120%1283% 83% 1.8 min
Wednesday, 2 September 2026110%1155% 55% 5.9 min
Tuesday, 1 September 2026120%1283% 83% 1.2 min
Monday, 31 August 2026120%1250% 50% 12.2 min
Sunday, 30 August 202660%6100% 100% 2.2 min early
Saturday, 29 August 2026110%1164% 64% 5.5 min
Friday, 28 August 20261217%933% 27% 32.8 min
Thursday, 27 August 2026120%128% 8% 18.8 min
Wednesday, 26 August 2026119%1050% 45% 20.2 min
Tuesday, 25 August 2026100%1060% 60% 2.5 min
Monday, 24 August 20261118%956% 45% 38.3 min
Sunday, 23 August 2026110%1127% 27% 5.7 min
Saturday, 22 August 2026120%1267% 67% 4.1 min
Friday, 21 August 2026120%1267% 67% 6.8 min
Thursday, 20 August 2026128%1050% 45% 14.1 min
Wednesday, 19 August 2026120%12100% 100% 1.2 min early
Tuesday, 18 August 2026120%1275% 75% 0.5 min early
Monday, 17 August 2026120%1145% 45% 21.3 min
Sunday, 16 August 2026119%838% 33% 27.5 min
Saturday, 15 August 2026120%1040% 40% 11.4 min
Friday, 14 August 2026120%0— — —
Thursday, 13 August 2026120%250% 50% 2.5 min
Wednesday, 12 August 2026120%10% 0% 41 min
Tuesday, 11 August 2026120%3100% 100% 1 min early
Monday, 10 August 20261217%333% 20% 30 min
Sunday, 9 August 2026100%0— — —
Saturday, 8 August 2026120%540% 40% 7.2 min
Friday, 7 August 2026128%10% 0% 42 min
Thursday, 6 August 2026110%0— — —

In the daily longest-delay league

Lumo appears 6 times across 49 archived days, on 4 separate dates in the ten shown. These are appearances in the daily league, not this operator's own worst delays.

DateServiceLate by
24 Aug 2026Edinburgh to London Kings Cross 06:26 · 1E802h 38m
4 Sept 2026Edinburgh to London Kings Cross 15:26 · 1E862h 19m
4 Sept 2026London Kings Cross to Edinburgh 10:15 · 1S931h 48m
17 Aug 2026Edinburgh to London Kings Cross 15:26 · 1E861h 21m
10 Aug 2026Edinburgh to London Kings Cross 15:26 · 1E861h 20m
17 Aug 2026London Kings Cross to Edinburgh 20:30 · 1S991h 17m

Recorded live from the Darwin and TRUST feeds on each of the 49 days above, and aggregated here. LD is this operator's ATOC code. How these figures are measured · All operators · Sources and licences