Wednesday, 16 September 2026
The railway ran close to plan on Wednesday, 16 September 2026: 88% of the 19,631 passenger trains whose arrival was recorded were within five minutes, and only 358 of 26,192 were cancelled.
17,334 of the 19,631 trains whose arrival was recorded were within five minutes, and the average delay was 1.4 minutes. Days like this rarely make the news, which is part of why they are worth recording.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
Even so, 59 trains were more than half an hour late. The worst was the 21:59 Elephant & Castle Underground to Stonebridge Park, which arrived 1h 42m behind schedule.
Where a reason was given at all, the most frequent was “This service has been delayed by a speed restriction” (774 services).
The day in numbers
| Passenger trains recorded | 26,192 | |
|---|---|---|
| Cancelled | 358 | 1.4% |
| Arrival time recorded | 19,631 | 76.0% of those that ran |
| …arrived within 5 minutes | 17,334 | 88.3% |
| …arrived 5 to 30 minutes late | 2,238 | 11.4% |
| …arrived more than 30 minutes late | 59 | 0.3% |
| Average delay at destination | 1.4 min |
Every percentage among the bands is of the 19,631 trains whose arrival reached the archive — not of all 26,192, and the bands are exclusive. 6,203 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from ScotRail on 3,020 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,020 | 0% | 2,062 | 95% | 94% | 0.6 min |
Northern NT | 2,841 | 1% | 2,564 | 92% | 90% | 0.8 min |
Great Western Railway GW | 2,182 | 0% | 1,504 | 86% | 85% | 2 min |
South Western Railway SW | 1,906 | 1% | 1,349 | 91% | 90% | 0.9 min |
Southeastern SE | 1,817 | 0% | 1,569 | 91% | 91% | 1.2 min |
Southern SN | 1,779 | 3% | 1,532 | 85% | 83% | 1.9 min |
London Overground LO | 1,605 | 2% | 1,455 | 97% | 95% | 0.1 min |
West Midlands Railway LM | 1,336 | 2% | 979 | 81% | 79% | 2.4 min |
Greater Anglia LE | 1,310 | 1% | 1,162 | 87% | 86% | 1.8 min |
Transport for Wales AW | 1,250 | 2% | 847 | 93% | 89% | -0.1 min |
Thameslink TL | 978 | 3% | 561 | 85% | 81% | 1.6 min |
London Underground LT | 805 | 0% | 150 | 93% | 93% | 1.9 min |
Elizabeth line XR | 693 | 1% | 638 | 95% | 95% | -0.4 min |
Merseyrail ME | 629 | 0% | 414 | 95% | 94% | 0.4 min |
East Midlands Railway EM | 629 | 1% | 435 | 78% | 76% | 2.9 min |
Great Northern GN | 439 | 2% | 335 | 69% | 68% | 4.1 min |
Avanti West Coast VT | 419 | 1% | 279 | 27% | 26% | 12.9 min |
c2c CC | 418 | 8% | 303 | 86% | 78% | 2.2 min |
Chiltern Railways CH | 349 | 6% | 305 | 99% | 93% | 0.2 min |
CrossCountry XC | 348 | 4% | 237 | 64% | 60% | 5.3 min |
TransPennine Express TP | 325 | 0% | 290 | 89% | 89% | 1.3 min |
London North Eastern Railway GR | 318 | 0% | 186 | 77% | 77% | 1.6 min |
Tyne and Wear Metro TW | 178 | 0% | 90 | 98% | 98% | -0.2 min |
Heathrow Express HX | 152 | 0% | 122 | 79% | 79% | 3.9 min |
Sheffield Supertram SJ | 98 | 0% | 39 | 97% | 97% | -0.3 min |
Gatwick Express GX | 71 | 1% | 67 | 85% | 84% | 2.4 min |
Charter/Other ZZ | 59 | 0% | 0 | — | — | — |
Island Line IL | 57 | 0% | 44 | 100% | 100% | 0.1 min |
Eurostar ES | 53 | 0% | 23 | 48% | 48% | 12.6 min |
West Coast Railway Co WR | 29 | 0% | 11 | 64% | 64% | -1 min |
Grand Central GC | 20 | 0% | 18 | 56% | 56% | 4.1 min |
Hull Trains HT | 15 | 0% | 15 | 60% | 60% | 4.3 min |
LS LS | 14 | 0% | 5 | 100% | 100% | -7.2 min |
TY TY | 11 | 0% | 8 | 63% | 63% | 7.4 min |
Lumo LD | 11 | 0% | 11 | 82% | 82% | 1.1 min |
Lumo Stirling LF | 10 | 10% | 6 | 33% | 29% | 8 min |
Caledonian Sleeper CS | 10 | 0% | 9 | 100% | 100% | -11.1 min |
North Yorkshire Moors Railway NY | 8 | 0% | 7 | 100% | 100% | -33.7 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 88% and 87% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a speed restriction
774 services
This service has been delayed by a late running train being in front of this one
456 services
This service has been delayed by a speed restriction over defective track
363 services
This service has been delayed by a fault with the signalling system
227 services
This service has been delayed by congestion
191 services
This service has been delayed by a problem currently under investigation
157 services
This service has been delayed by the train departing late to maintain customer connections
126 services
This service has been delayed by a safety inspection of the track
104 services
Why trains were cancelled
A reason reached the archive for 159 of the 358 cancellations (44.4%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a late running train being in front of this one
35 services
This service has been cancelled because of a shortage of train crew
25 services
This service has been cancelled because of a speed restriction
20 services
This service has been cancelled because of a fault with the signalling system
19 services
This service has been cancelled because of a broken down train earlier today
17 services
This service has been cancelled because of emergency services dealing with an incident near the railway
16 services
This service has been cancelled because of a fault on this train
14 services
This service has been cancelled because of a safety inspection of the track
13 services
The longest delays
The worst of them arrived 1h 42m behind schedule — Elephant & Castle Underground to Stonebridge Park, booked away at 21:59, run by London Underground. The ten longest range from 1h 42m down to 49 min, and they belong to 4 operators, Avanti West Coast accounting for 5. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
21:59 | Elephant & Castle Underground to Stonebridge Park 2I27 · LT | 1h 42m |
14:22 | Aberdare to Merthyr Tydfil 1M40 · AW | 1h 35m |
21:37 | Hertford East to London Liverpool Street 2O15 · LE | 1h 29m |
21:10 | Cambridge North to London Liverpool Street 2H67 · LE | 1h 25m |
22:06 | Hertford East to London Liverpool Street 2O17 · LE | 1h 19m |
14:33 | London Euston to Manchester Piccadilly 1H69 · VT | 1h 01m |
13:40 | London Euston to Glasgow Central 9S77 · VT | 55 min |
09:08 | Liverpool Lime Street to London Euston 1A19 · VT | 52 min |
13:53 | London Euston to Manchester Piccadilly 1H24 · VT | 51 min |
17:14 | Manchester Piccadilly to London Euston 1A66 · VT | 49 min |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 25% of 153 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 17.
What ran
Formations were recorded for 23,656 trains on this date, made up of 2,747 individual units and 12,003 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,209 of the day's recorded trains from a pool of 225 units.
The average train was 5.6 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,209 | 225 |
| Class 465 | 1,659 | 101 |
| Class 720 | 1,566 | 131 |
| Class 450 | 1,518 | 121 |
| Class 387 | 1,313 | 89 |
| Class 150 | 1,132 | 88 |
| Class 158 | 1,074 | 116 |
| Class 375 | 1,047 | 103 |
| Class 385 | 1,000 | 65 |
| Class 730 | 926 | 69 |
| Class 156 | 910 | 79 |
| Class 170 | 880 | 97 |
Of 26,192 runs, 23,656 had a formation published (90%) — these are allocations rather than observations.
Buses
17,298 buses from 188 operators were seen on this date, across 3,029,693 position reports.
125,615 bus journeys were followed to their destination on this date. 89,857 arrived on time, 7,376 late, and 28,382 — 23% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0.2 minutes late, and 826 journeys finished more than twenty minutes down.
| Journeys followed to destination | 125,615 | |
|---|---|---|
| On time | 89,857 | 71.5% |
| Early | 28,382 | 22.6% |
| Late | 7,376 | 5.9% |
| …more than 20 minutes late | 826 | 0.7% |
| Average arrival | 0.2 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 98,051 | 74% | 23% |
Go North East GNEL | 1,904 | 73% | 10% |
First South Yorkshire FSYO | 1,837 | 55% | 25% |
First Leeds FLDS | 1,268 | 63% | 26% |
Bee Network BNML | 942 | 71% | 19% |
Bee Network BNSM | 856 | 78% | 16% |
National Express West Midlands TNXB | 845 | 75% | 15% |
Arriva Yorkshire WRAY | 821 | 58% | 25% |
National Express NATX | 753 | 30% | 35% |
First Potteries FPOT | 732 | 54% | 29% |
First Leicester FLEI | 682 | 60% | 36% |
Preston Bus PBLT | 656 | 61% | 33% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (93%), and National Express furthest from it (30%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 16 Sept 2026 itself. How these figures are measured · Sources and licences