Lumo Stirling
Lumo Stirling appears on 49 archived days from 6 Aug 2026 to 23 Sept 2026, running 10 services a day. 56% of its recorded arrivals were within five minutes, which is below the network as a whole.
336 arrivals were recorded across the window, 187 of them within five minutes and 23 more than half an hour late. At this volume a single badly delayed working is worth a visible fraction of a percentage point.
Its week is strongly peaked: 10 services on Wednesday, 23 September 2026 against 5 on Sunday, 20 September 2026, a swing of 2.0 times.
The average delay at destination was 8.7 minutes. The worst single arrival recorded was 1h 52m behind schedule, London Euston to Stirling on Wednesday, 23 September 2026.
28 services were cancelled, 5.9% of everything booked — above the 2.4% the network cancelled over the same dates.
Counting those cancellations as failures, the way the industry's own measure does, takes the on-time share from 56% of recorded arrivals to 51% of everything booked whose outcome is known — 4.3 points.
Lumo Stirling in numbers
| Archived days covered | 49 | 6 Aug 2026 to 23 Sept 2026 |
|---|---|---|
| Passenger trains recorded | 472 | |
| Share of the national timetable | 0.0% | of 1,203,226 over the same dates |
| Cancelled | 28 | 5.9% · network 2.4% |
| Arrival time recorded | 336 | 75.7% of those that ran |
| …arrived within 5 minutes | 187 | 55.7% |
| …arrived 5 to 30 minutes late | 126 | 37.5% |
| …arrived more than 30 minutes late | 23 | 6.8% |
| Average delay at destination | 8.7 min | |
| On time, counting cancellations | 51.4% | of the 364 booked services whose outcome is known · network 84% |
| Network, same dates | 87% | on time, against this operator's 56% |
Every percentage among the bands is of the 336 services whose arrival reached the archive, not of all 472, and the bands are exclusive. 108 ran without an arrival being recorded, and nothing is claimed about those. The row counting cancellations is those same 187 on-time arrivals over a denominator that also holds the 28 trains that did not run at all. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it. The on-time share and the average delay answer different questions.
Day by day
49 archived days, 6 Aug 2026 to 23 Sept 2026, widest bar the busiest, filled to the share that arrived within five minutes. The same days across every operator.
In the daily longest-delay league
Lumo Stirling appears 4 times across 49 archived days, on 3 separate dates in the ten shown. These are appearances in the daily league, not this operator's own worst delays.
| Date | Service | Late by |
|---|---|---|
| 23 Sept 2026 | London Euston to Stirling 10:19 · 1S01 | 1h 52m |
| 23 Sept 2026 | Stirling to London Euston 17:09 · 1M03 | 1h 51m |
| 15 Sept 2026 | Stirling to London Euston 08:50 · 1M01 | 1h 13m |
| 30 Aug 2026 | Stirling to London Euston 16:34 · 1M02 | 1h 11m |
Recorded live from the Darwin and TRUST feeds on each of the 49 days above,
and aggregated here. LF is this operator's ATOC code. How these figures are measured · All operators · Sources and licences