Saturday, 3 October 2026
91% of the 18,223 passenger trains whose arrival was recorded on Saturday, 3 October 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 26,138 recorded runs, 396 did not run at all. Among those whose arrival reached the archive, 16,541 were within five minutes, 1,574 between five and thirty minutes down, and 108 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 585 services.
c2c came closest to running to time, 99.3% of its 268 recorded arrivals; Great Northern had the largest cancelled share at 9.3%.
A weekend timetable, so the 26,138 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.
Buses on this date: 126,426 journeys followed to their destination, 69.7% on time.
The day in numbers
| Passenger trains recorded | 26,138 | |
|---|---|---|
| Cancelled | 396 | 1.5% |
| Arrival time recorded | 18,223 | 70.8% of those that ran |
| …arrived within 5 minutes | 16,541 | 90.8% |
| …arrived 5 to 30 minutes late | 1,574 | 8.6% |
| …arrived more than 30 minutes late | 108 | 0.6% |
| Average delay at destination | 1 min |
Every percentage among the bands is of the 18,223 trains whose arrival reached the archive — not of all 26,138, and the bands are exclusive. 7,519 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
39 operators ran passenger services on this date, from ScotRail on 2,962 runs down to Caledonian Sleeper on 3. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 2,962 | 1% | 2,059 | 95% | 94% | 0.8 min |
Northern NT | 2,813 | 1% | 2,360 | 89% | 88% | 1.2 min |
South Western Railway SW | 2,434 | 2% | 1,275 | 87% | 85% | 2.2 min |
Great Western Railway GW | 2,099 | 1% | 1,394 | 91% | 90% | 1 min |
Southern SN | 1,636 | 3% | 1,340 | 89% | 86% | 1.3 min |
London Overground LO | 1,569 | 3% | 1,352 | 97% | 95% | -0.4 min |
Southeastern SE | 1,444 | 1% | 1,287 | 94% | 93% | 0.8 min |
Greater Anglia LE | 1,291 | 0% | 1,142 | 98% | 98% | -0.1 min |
Transport for Wales AW | 1,285 | 2% | 891 | 90% | 88% | 0.4 min |
West Midlands Railway LM | 1,266 | 2% | 900 | 88% | 86% | 1.4 min |
Thameslink TL | 908 | 4% | 516 | 90% | 85% | 0.9 min |
London Underground LT | 710 | 0% | 127 | 96% | 96% | 0.6 min |
East Midlands Railway EM | 688 | 1% | 460 | 79% | 78% | 3.2 min |
Elizabeth line XR | 665 | 1% | 615 | 98% | 97% | -1.3 min |
c2c CC | 623 | 0% | 268 | 99% | 99% | -0.2 min |
Merseyrail ME | 615 | 0% | 385 | 97% | 97% | 0.2 min |
TransPennine Express TP | 584 | 1% | 274 | 80% | 78% | 2.5 min |
CrossCountry XC | 520 | 0% | 287 | 71% | 70% | 5.4 min |
Avanti West Coast VT | 391 | 6% | 240 | 44% | 40% | 8.5 min |
London North Eastern Railway GR | 347 | 0% | 164 | 87% | 87% | -0.3 min |
Great Northern GN | 345 | 9% | 240 | 85% | 75% | 1.8 min |
Chiltern Railways CH | 229 | 8% | 197 | 98% | 90% | 0 min |
Tyne and Wear Metro TW | 165 | 0% | 71 | 90% | 90% | 2.7 min |
Heathrow Express HX | 152 | 0% | 136 | 98% | 98% | 0 min |
Sheffield Supertram SJ | 99 | 0% | 34 | 100% | 100% | -0.6 min |
Gatwick Express GX | 72 | 3% | 65 | 78% | 76% | 3.2 min |
Island Line IL | 52 | 0% | 47 | 100% | 100% | -0.2 min |
Eurostar ES | 41 | 0% | 20 | 50% | 50% | 17 min |
Charter/Other ZZ | 28 | 0% | 5 | 100% | 100% | -3.8 min |
West Coast Railway Co WR | 23 | 0% | 9 | 78% | 78% | -3.3 min |
Grand Central GC | 20 | 0% | 20 | 70% | 70% | 6.2 min |
Hull Trains HT | 12 | 0% | 12 | 100% | 100% | -0.2 min |
TY TY | 10 | 0% | 0 | — | — | — |
Lumo Stirling LF | 10 | 0% | 8 | 75% | 75% | 5 min |
Lumo LD | 10 | 0% | 8 | 63% | 63% | 3.1 min |
North Yorkshire Moors Railway NY | 8 | 0% | 7 | 57% | 57% | 0.6 min |
LS LS | 5 | 0% | 2 | 100% | 100% | -11.5 min |
SO SO | 4 | 0% | 3 | 33% | 33% | 13 min |
Caledonian Sleeper CS | 3 | 0% | 3 | 100% | 100% | -13.7 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 91% and 89% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
585 services
This service has been delayed by a speed restriction
280 services
This service has been delayed by a fault with the signalling system
187 services
This service has been delayed by congestion
160 services
This service has been delayed by a speed restriction over defective track
151 services
This service has been delayed by the train departing late to maintain customer connections
124 services
This service has been delayed by a problem currently under investigation
109 services
This service has been delayed by a fault on a train
102 services
Why trains were cancelled
A reason reached the archive for 214 of the 396 cancellations (54.0%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a shortage of train crew
57 services
This service has been cancelled because of the emergency services dealing with an incident
39 services
This service has been cancelled because of a fault on a train
39 services
This service has been cancelled because of a late running train being in front of this one
17 services
This service has been cancelled because of a fault with the signalling system
17 services
This service has been cancelled because of a fault on this train
17 services
This service has been cancelled because of a speed restriction over defective track
14 services
This service has been cancelled because of a short-notice change to the timetable
14 services
The longest delays
The worst of them arrived 2h 51m behind schedule — London Liverpool Street to Norwich, booked away at 23:30, run by Greater Anglia. The ten longest range from 2h 51m down to 1h 14m, and they belong to 8 operators, Greater Anglia accounting for 2. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
23:30 | London Liverpool Street to Norwich 1P72 · LE | 2h 51m |
10:14 | Newcastle Airport to South Hylton (T & W Metro) 2I03 · TW | 2h 23m |
22:48 | Cambridge to Ipswich 2W37 · LE | 1h 57m |
20:20 | Crianlarich to Mallaig 1Y47 · SR | 1h 42m |
20:45 | Bristol Temple Meads to Weymouth 2O98 · GW | 1h 41m |
15:02 | Holyhead to Manchester Airport 1H91 · AW | 1h 29m |
23:29 | London Charing Cross to Ashford International 1U20 · SE | 1h 26m |
17:00 | Liverpool Lime Street to Manchester Airport 2A21 · NT | 1h 24m |
20:54 | London Victoria to Hastings 1F60 · SN | 1h 19m |
21:30 | Taunton to London Paddington 1A40 · GW | 1h 14m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 14% of 152 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 17.
What ran
Formations were recorded for 24,460 trains on this date, made up of 2,588 individual units and 11,381 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 2,606 of the day's recorded trains from a pool of 184 units.
The average train was 5.5 vehicles long. The longest formation recorded was 19 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 2,606 | 184 |
| Class 158 | 1,555 | 135 |
| Class 150 | 1,328 | 84 |
| Class 387 | 1,305 | 88 |
| Class 450 | 1,250 | 84 |
| Class 345 | 1,170 | 62 |
| Class 720 | 1,160 | 89 |
| Class 156 | 1,061 | 85 |
| Class 465 | 1,061 | 77 |
| Class 385 | 1,031 | 67 |
| Class 170 | 946 | 96 |
| Class 165 | 929 | 60 |
Of 26,138 runs, 24,460 had a formation published (94%) — these are allocations rather than observations.
Buses
15,589 buses from 152 operators were seen on this date, across 2,840,530 position reports.
126,426 bus journeys were followed to their destination on this date. 88,157 arrived on time, 8,009 late, and 30,260 — 24% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0.1 minutes late, and 699 journeys finished more than fifteen minutes down.
| Journeys followed to destination | 126,426 | |
|---|---|---|
| On time | 88,157 | 69.7% |
| Early | 30,260 | 23.9% |
| Late | 8,009 | 6.3% |
| …more than 15 minutes late | 699 | 0.6% |
| Average arrival | 0.1 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 96,373 | 72% | 24% |
Nottingham City Transport NCTR | 1,986 | 73% | 19% |
Go North East GNEL | 1,904 | 71% | 11% |
First South Yorkshire FSYO | 1,654 | 56% | 28% |
First Leeds FLDS | 1,499 | 56% | 30% |
First Bristol, Bath & the West FBRI | 1,498 | 51% | 26% |
National Express NATX | 892 | 33% | 37% |
Bee Network BNSM | 839 | 77% | 19% |
Arriva Yorkshire WRAY | 795 | 61% | 27% |
National Express West Midlands TNXB | 735 | 74% | 15% |
First Potteries FPOT | 730 | 57% | 34% |
Bee Network BNML | 707 | 73% | 18% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (88%), and National Express furthest from it (33%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 3 Oct 2026 itself. How these figures are measured · Sources and licences