TransitRadar

Sunday, 4 October 2026

The railway ran close to plan on Sunday, 4 October 2026: 91% of the 12,814 passenger trains whose arrival was recorded were within five minutes, and only 255 of 18,102 were cancelled.

11,625 of the 12,814 trains whose arrival was recorded were within five minutes, and the average delay was 0.9 minutes. Days like this rarely make the news, which is part of why they are worth recording.

A weekend timetable, so the 18,102 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.

Even so, 42 trains were more than half an hour late. The worst was the 14:39 Paris Nord to London St Pancras (Intl), which arrived 1h 41m behind schedule.

Where a reason was given at all, the most frequent was “This service has been delayed by a late running train being in front of this one” (400 services).

The day in numbers

Passenger trains recorded18,102
Cancelled2551.4%
Arrival time recorded12,81471.8% of those that ran
…arrived within 5 minutes11,62590.7%
…arrived 5 to 30 minutes late1,1479.0%
…arrived more than 30 minutes late420.3%
Average delay at destination0.9 min

Every percentage among the bands is of the 12,814 trains whose arrival reached the archive — not of all 18,102, and the bands are exclusive. 5,033 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

39 operators ran passenger services on this date, from South Western Railway on 1,919 runs down to North Yorkshire Moors Railway on 2. Ordered by volume, not performance — any heading re-sorts it.

Operator
South Western Railway SW1,9192%1,031 94% 91% 0.9 min
ScotRail SR1,7071%1,071 94% 92% 1 min
Northern NT1,4560%1,212 94% 93% 0.3 min
London Overground LO1,2965%1,081 96% 91% -0.2 min
Great Western Railway GW1,2600%891 89% 88% 1.1 min
Southeastern SE1,1860%889 88% 88% 1.3 min
Southern SN1,1093%986 86% 84% 1.5 min
Greater Anglia LE1,0460%860 96% 96% 0 min
Transport for Wales AW8771%704 88% 87% 0.8 min
Thameslink TL6771%440 85% 84% 1.7 min
West Midlands Railway LM6753%547 88% 85% 1.3 min
London Underground LT6550%254 94% 94% 1.5 min
Elizabeth line XR5060%499 99% 99% -1.3 min
TransPennine Express TP4840%258 90% 90% 0.1 min
CrossCountry XC4041%156 72% 69% 4 min
c2c CC4041%175 97% 93% 0.3 min
Great Northern GN4001%209 91% 91% 0.9 min
East Midlands Railway EM3872%274 82% 80% 1.8 min
Merseyrail ME3180%269 99% 99% 0 min
Avanti West Coast VT2923%204 50% 48% 6.9 min
London North Eastern Railway GR2580%141 94% 94% -2.1 min
Chiltern Railways CH19412%163 90% 78% 1.5 min
Heathrow Express HX1510%149 96% 96% -0.2 min
Tyne and Wear Metro TW1280%107 99% 99% 0.5 min
Gatwick Express GX660%65 71% 71% 3 min
Sheffield Supertram SJ510%41 100% 100% -0.6 min
Island Line IL460%45 100% 100% -0.7 min
Eurostar ES460%33 55% 55% 17.9 min
Grand Central GC1911%14 71% 63% 7.8 min
Charter/Other ZZ170%4 100% 100% -2.2 min
West Coast Railway Co WR160%4 75% 75% -10 min
Hull Trains HT120%12 92% 92% 1.6 min
Lumo LD100%10 80% 80% 2.2 min
LS LS80%3 100% 100% -33.7 min
Lumo Stirling LF80%8 50% 50% 4.9 min
TY TY60%0 — — —
SO SO30%1 100% 100% 0 min
Caledonian Sleeper CS30%3 100% 100% -2 min
North Yorkshire Moors Railway NY20%1 100% 100% 0 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 91% and 89% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

400 services

This service has been delayed by a speed restriction

216 services

This service has been delayed by a problem currently under investigation

150 services

This service has been delayed by a speed restriction over defective track

112 services

This service has been delayed by the train departing late to maintain customer connections

96 services

This service has been delayed by congestion

87 services

This service has been delayed by a fault with the signalling system

75 services

This service has been delayed by a late running freight train

50 services

Why trains were cancelled

A reason reached the archive for 135 of the 255 cancellations (52.9%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a late running train being in front of this one

41 services

This service has been cancelled because of a fault on a train

26 services

This service has been cancelled because of a late running freight train

20 services

This service has been cancelled because of a fault on this train

14 services

This service has been cancelled because of a shortage of train crew

9 services

This service has been cancelled because of a fault with the signalling system

9 services

This service has been cancelled because of congestion

8 services

This service has been cancelled because of a member of train crew being unavailable

8 services

The longest delays

The worst of them arrived 1h 41m behind schedule — Paris Nord to London St Pancras (Intl), booked away at 14:39, run by Eurostar. The ten longest range from 1h 41m down to 54 min, and they belong to 7 operators, Eurostar accounting for 4. What a delay on that scale usually means.

BookedServiceLate by
14:39Paris Nord to London St Pancras (Intl) 9O37 · ES1h 41m
21:09London Waterloo to Hounslow 2Z69 · SW1h 26m
16:10Paris Nord to London St Pancras (Intl) 9O43 · ES1h 08m
14:34Glasgow Central to London Euston 1M15 · VT1h 06m
13:40Paris Nord to London St Pancras (Intl) 9O33 · ES1h 04m
16:40Amsterdam CS to London St Pancras (Intl) 9I57 · ES1h 04m
01:24Dartford to Gravesend 9A97 · TL1h 01m
13:00London Kings Cross to Sunderland 1N93 · GC57 min
21:42Birmingham Moor Street to Worcester Foregate Street 2V30 · LM55 min
00:15London Charing Cross to Tunbridge Wells 2H32 · SE54 min

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 05:00, when 29% of 101 arrived within five minutes.

00 129
01 40
02 24
03 21
04 53
05 101
06 274
07 577
08 928
09 1,136
10 1,175
11 1,159
12 1,188
13 1,178
14 1,181
15 1,189
16 1,213
17 1,195
18 1,171
19 1,086
20 1,027
21 912
22 773
23 372

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 03:00 with 21.

What ran

Formations were recorded for 15,654 trains on this date, made up of 2,274 individual units and 10,117 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 1,687 of the day's recorded trains from a pool of 164 units.

The average train was 5.9 vehicles long. The longest formation recorded was 18 vehicles.

ClassTrainsUnits used
Class 3771,687164
Class 158980123
Class 45096478
Class 34591556
Class 38788578
Class 72083278
Class 15077767
Class 37569872
Class 70067986
Class 16565054
Class 46559968
Class 38555960

Of 18,102 runs, 15,654 had a formation published (86%) — these are allocations rather than observations.

Buses

11,044 buses from 117 operators were seen on this date, across 2,013,966 position reports.

97,121 bus journeys were followed to their destination on this date. 63,888 arrived on time, 7,558 late, and 25,675 — 26% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

The average arrival was 0.1 minutes late, and 533 journeys finished more than twenty minutes down.

Journeys followed to destination97,121
On time63,88865.8%
Early25,67526.4%
Late7,5587.8%
…more than 20 minutes late5330.5%
Average arrival0.1 min late

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO78,34866%27%
Nottingham City Transport NCTR1,64576%15%
Go North East GNEL1,25077%9%
First Leeds FLDS1,24261%27%
First South Yorkshire FSYO1,08158%31%
First Bristol, Bath & the West FBRI1,03165%20%
National Express NATX88731%39%
Bee Network BNSM58778%17%
Bee Network BNML54970%23%
National Express West Midlands TNXB50577%12%
Arriva Yorkshire WRAY43559%30%
Preston Bus PBLT38363%31%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (90%), and National Express furthest from it (31%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 4 Oct 2026 itself. How these figures are measured · Sources and licences