The railway ran close to plan on Monday, 5 October 2026: 91% of the 22,112 passenger trains whose arrival was recorded were within five minutes, and only 389 of 26,226 were cancelled.

20,090 of the 22,112 trains whose arrival was recorded were within five minutes, and the average delay was 1.2 minutes. Days like this rarely make the news, which is part of why they are worth recording.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

Even so, 138 trains were more than half an hour late. The worst was the 05:42 Newcastle to Carlisle, which arrived 2h 39m behind schedule.

Where a reason was given at all, the most frequent was “This service has been delayed by a late running train being in front of this one” (458 services).

The day in numbers

Passenger trains recorded26,226
Cancelled3891.5%
Arrival time recorded22,11285.6% of those that ran
…arrived within 5 minutes20,09090.9%
…arrived 5 to 30 minutes late1,8848.5%
…arrived more than 30 minutes late1380.6%
Average delay at destination1.2 min

Every percentage among the bands is of the 22,112 trains whose arrival reached the archive — not of all 26,226, and the bands are exclusive. 3,725 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

37 operators ran passenger services on this date, from ScotRail on 3,040 runs down to Caledonian Sleeper on 6. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0400%2,260 96% 95% 0.6 min
Northern NT2,8291%2,688 88% 87% 1.7 min
Great Western Railway GW2,1681%1,675 90% 89% 0.9 min
Southeastern SE1,7920%1,772 92% 92% 1.3 min
South Western Railway SW1,7671%1,564 91% 89% 1.7 min
Southern SN1,7082%1,621 87% 85% 1.8 min
London Overground LO1,6012%1,544 97% 95% -0.4 min
West Midlands Railway LM1,3281%1,174 90% 88% 1.4 min
Greater Anglia LE1,3071%1,293 97% 96% -0.2 min
Transport for Wales AW1,2786%969 93% 86% 0.5 min
Thameslink TL9742%619 92% 89% 0.8 min
c2c CC8130%356 97% 96% 0.9 min
London Underground LT7710%367 93% 93% 1.8 min
Elizabeth line XR6971%692 99% 99% -1.5 min
East Midlands Railway EM6200%491 81% 80% 2.5 min
Merseyrail ME6152%598 97% 94% 0.5 min
Great Northern GN4363%373 86% 83% 2 min
Avanti West Coast VT4201%315 62% 61% 7.9 min
CrossCountry XC3503%267 70% 67% 5.6 min
Chiltern Railways CH3465%330 97% 92% 0.2 min
London North Eastern Railway GR3171%197 75% 74% 4.4 min
TransPennine Express TP3154%298 74% 71% 4.1 min
Tyne and Wear Metro TW1740%174 97% 97% 0.8 min
Heathrow Express HX1521%151 93% 93% 0.9 min
Sheffield Supertram SJ970%73 100% 100% 0.1 min
Gatwick Express GX714%68 74% 70% 4 min
Eurostar ES550%55 60% 60% 8.8 min
Island Line IL520%52 100% 100% -0.9 min
Charter/Other ZZ420%5 60% 60% 2.4 min
Grand Central GC229%20 60% 55% 12 min
Hull Trains HT140%14 93% 93% 1.4 min
LS LS110%3 100% 100% -4 min
West Coast Railway Co WR100%3 100% 100% -6.3 min
Lumo Stirling LF1020%8 88% 70% 3.1 min
Lumo LD100%10 60% 60% 10.8 min
North Yorkshire Moors Railway NY80%8 88% 88% -18.4 min
Caledonian Sleeper CS617%5 80% 67% -4.2 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 91% and 89% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

458 services

This service has been delayed by a speed restriction

441 services

This service has been delayed by a speed restriction over defective track

256 services

This service has been delayed by congestion

219 services

This service has been delayed by a fault with the signalling system

142 services

This service has been delayed by the train departing late to maintain customer connections

85 services

This service has been delayed by a problem currently under investigation

83 services

This service has been delayed by a fault on this train

77 services

Why trains were cancelled

A reason reached the archive for 192 of the 389 cancellations (49.4%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a fault with the signalling system

75 services

This service has been cancelled because of congestion

20 services

This service has been cancelled because of a fault on this train

20 services

This service has been cancelled because of the emergency services dealing with an incident

18 services

This service has been cancelled because of engineering works not being finished on time

16 services

This service has been cancelled because of a speed restriction over defective track

15 services

This service has been cancelled because of a safety inspection of the track

15 services

This service has been cancelled because of a speed restriction

13 services

The longest delays

The worst of them arrived 2h 39m behind schedule — Newcastle to Carlisle, booked away at 05:42, run by Northern. The ten longest range from 2h 39m down to 1h 59m, and they belong to 4 operators, South Western Railway accounting for 6. What a delay on that scale usually means.

BookedServiceLate by
05:42Newcastle to Carlisle 1N55 · NT2h 39m
08:55Cardiff Central to Manchester Piccadilly 1W55 · AW2h 17m
08:54Poole to Bournemouth 2W52 · SW2h 11m
09:23Cardiff Central to Holyhead 1W93 · AW2h 09m
09:04Bournemouth to Weymouth 2W13 · SW2h 07m
08:49Poole to Winchester 2B32 · SW2h 07m
07:03London Waterloo to Poole 1B87 · SW2h 03m
06:30London Waterloo to Weymouth 1W93 · SW2h 02m
11:15Penzance to Edinburgh 1S53 · XC2h 02m
07:35London Waterloo to Weymouth 1W95 · SW1h 59m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 65% of 150 arrived within five minutes.

00 62
01 24
02 10
03 22
04 150
05 951
06 1,632
07 1,690
08 1,567
09 1,455
10 1,432
11 1,407
12 1,415
13 1,411
14 1,435
15 1,469
16 1,584
17 1,644
18 1,542
19 1,359
20 1,222
21 1,130
22 986
23 627

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 10.

What ran

Formations were recorded for 26,802 trains on this date, made up of 2,879 individual units and 12,652 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,281 of the day's recorded trains from a pool of 223 units.

The average train was 5.6 vehicles long. The longest formation recorded was 22 vehicles.

ClassTrainsUnits used
Class 3773,281223
Class 4651,60899
Class 7201,547124
Class 4501,517121
Class 1581,458138
Class 3871,33290
Class 1501,31486
Class 3451,19665
Class 1651,13463
Class 1561,09386
Class 3751,034102
Class 7001,013104

Of 26,226 runs, 26,802 had a formation published (102%) — these are allocations rather than observations.

Buses

17,342 buses from 186 operators were seen on this date, across 3,192,523 position reports.

137,918 bus journeys were followed to their destination on this date. 97,768 arrived on time, 6,606 late, and 33,544 — 24% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.2 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination137,918
On time97,76870.9%
Early33,54424.3%
Late6,6064.8%
…more than 20 minutes late6380.5%
Average arrival0.2 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO104,56073%25%
Nottingham City Transport NCTR2,49378%16%
Go North East GNEL2,07576%10%
First South Yorkshire FSYO2,05261%28%
First Leeds FLDS1,70260%30%
First Bristol, Bath & the West FBRI95964%25%
Bee Network BNSM93179%17%
Arriva Yorkshire WRAY88758%28%
First Potteries FPOT88362%28%
National Express West Midlands TNXB84179%15%
First Leicester FLEI77457%40%
National Express NATX77235%35%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (90%), and National Express furthest from it (35%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 5 Oct 2026 itself. How these figures are measured · Sources and licences