Sunday, 30 August 2026
89% of the 12,865 passenger trains whose arrival was recorded on Sunday, 30 August 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 17,220 recorded runs, 314 did not run at all. Among those whose arrival reached the archive, 11,478 were within five minutes, 1,297 between five and thirty minutes down, and 90 more than half an hour — the tail that people actually remember.
“This service has been delayed by a fault with the signalling system” was the most common explanation, given for 201 services.
Merseyrail came closest to running to time, 98.0% of its 355 recorded arrivals; CrossCountry had the largest cancelled share at 7.0%.
A weekend timetable, so the 17,220 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.
The day in numbers
| Passenger trains recorded | 17,220 | |
|---|---|---|
| Cancelled | 314 | 1.8% |
| Arrival time recorded | 12,865 | 76.1% of those that ran |
| …arrived within 5 minutes | 11,478 | 89.2% |
| …arrived 5 to 30 minutes late | 1,297 | 10.1% |
| …arrived more than 30 minutes late | 90 | 0.7% |
| Average delay at destination | 1.3 min |
Every percentage among the bands is of the 12,865 trains whose arrival reached the archive — not of all 17,220, and the bands are exclusive. 4,041 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 1,766 runs down to North Yorkshire Moors Railway on 4. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 1,766 | 0% | 1,118 | 96% | 95% | 0.3 min |
Northern NT | 1,505 | 4% | 1,153 | 89% | 85% | 1 min |
South Western Railway SW | 1,457 | 1% | 1,005 | 92% | 91% | 1.1 min |
London Overground LO | 1,287 | 3% | 1,154 | 92% | 89% | 0.6 min |
Great Western Railway GW | 1,185 | 3% | 877 | 81% | 78% | 3.3 min |
Southern SN | 1,135 | 4% | 911 | 78% | 74% | 3 min |
Greater Anglia LE | 944 | 0% | 896 | 93% | 93% | 0.5 min |
Southeastern SE | 897 | 4% | 792 | 86% | 82% | 2.7 min |
Transport for Wales AW | 843 | 1% | 651 | 89% | 88% | 0.8 min |
Great Northern GN | 809 | 0% | 282 | 87% | 86% | 1.4 min |
Thameslink TL | 791 | 2% | 408 | 87% | 84% | 1.2 min |
West Midlands Railway LM | 672 | 0% | 620 | 92% | 92% | 0.8 min |
London Underground LT | 657 | 0% | 330 | 94% | 94% | 1.4 min |
Elizabeth line XR | 507 | 2% | 492 | 98% | 95% | -0.9 min |
Merseyrail ME | 360 | 1% | 355 | 98% | 97% | 0.5 min |
TransPennine Express TP | 311 | 3% | 269 | 87% | 84% | 1.3 min |
CrossCountry XC | 301 | 7% | 126 | 87% | 74% | 3.1 min |
East Midlands Railway EM | 295 | 1% | 216 | 81% | 79% | 2.4 min |
Avanti West Coast VT | 283 | 0% | 182 | 74% | 74% | 3.6 min |
London North Eastern Railway GR | 229 | 0% | 118 | 92% | 91% | -1.9 min |
Chiltern Railways CH | 210 | 4% | 202 | 97% | 93% | 0 min |
c2c CC | 203 | 0% | 202 | 91% | 90% | 1.8 min |
Heathrow Express HX | 151 | 1% | 137 | 89% | 88% | 1.3 min |
Tyne and Wear Metro TW | 128 | 0% | 98 | 99% | 99% | 0.5 min |
Gatwick Express GX | 68 | 0% | 66 | 80% | 80% | 2.2 min |
Eurostar ES | 52 | 0% | 51 | 47% | 47% | 8.5 min |
Sheffield Supertram SJ | 51 | 0% | 51 | 100% | 100% | -0.4 min |
Island Line IL | 46 | 0% | 46 | 100% | 100% | -0.4 min |
West Coast Railway Co WR | 25 | 0% | 15 | 73% | 73% | 5.9 min |
Charter/Other ZZ | 10 | 0% | 6 | 83% | 83% | -0.7 min |
Lumo Stirling LF | 8 | 25% | 6 | 67% | 50% | 16.3 min |
Caledonian Sleeper CS | 7 | 0% | 7 | 86% | 86% | -13.3 min |
TY TY | 6 | 0% | 6 | 50% | 50% | 4 min |
Lumo LD | 6 | 0% | 6 | 100% | 100% | -2.2 min |
Hull Trains HT | 6 | 0% | 6 | 83% | 83% | 0.8 min |
LS LS | 5 | 0% | 1 | 100% | 100% | -79 min |
North Yorkshire Moors Railway NY | 4 | 0% | 4 | 100% | 100% | -19 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 89% and 87% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a fault with the signalling system
201 services
This service has been delayed by a late running train being in front of this one
189 services
This service has been delayed by a speed restriction
187 services
This service has been delayed by a problem currently under investigation
109 services
This service has been delayed by congestion
103 services
This service has been delayed by a fault with the signalling system earlier today
102 services
This service has been delayed by a speed restriction over defective track
100 services
This service has been delayed by the train departing late to maintain customer connections
57 services
Why trains were cancelled
A reason reached the archive for 199 of the 314 cancellations (63.4%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault with the signalling system
53 services
This service has been cancelled because of overcrowding because of an event
30 services
This service has been cancelled because of a shortage of train drivers
26 services
This service has been cancelled because of a member of train crew being unavailable
25 services
This service has been cancelled because of the emergency services dealing with an incident
21 services
This service has been cancelled because of a shortage of train crew
21 services
This service has been cancelled because of a problem with the station lighting
13 services
This service has been cancelled because of engineering works not being finished on time
10 services
The longest delays
The worst of them arrived 2h 30m behind schedule — Milford Haven to Manchester Piccadilly, booked away at 13:41, run by Transport for Wales. The ten longest range from 2h 30m down to 1h 11m, and they belong to 7 operators, Southeastern accounting for 4. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
13:41 | Milford Haven to Manchester Piccadilly 1W61 · AW | 2h 30m |
19:42 | Portsmouth & Southsea to Southampton Central 2E64 · SW | 2h 14m |
11:50 | Hastings to London Charing Cross 1H80 · SE | 2h 01m |
09:30 | Birmingham New Street to Penzance 1V46 · XC | 1h 56m |
12:50 | Hastings to London Charing Cross 1H84 · SE | 1h 36m |
13:50 | Hastings to London Charing Cross 1H88 · SE | 1h 22m |
19:25 | Liverpool Lime Street to Newcastle 9E19 · TP | 1h 19m |
08:30 | Bristol Parkway to London Paddington 1L32 · GW | 1h 16m |
13:30 | Hastings to London Charing Cross 1H86 · SE | 1h 13m |
16:34 | Stirling to London Euston 1M02 · LF | 1h 11m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 06:00, when 55% of 222 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 03:00 with 28.
What ran
Formations were recorded for 15,180 trains on this date, made up of 2,247 individual units and 9,742 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 1,569 of the day's recorded trains from a pool of 148 units.
The average train was 5.9 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 1,569 | 148 |
| Class 158 | 962 | 122 |
| Class 450 | 945 | 95 |
| Class 720 | 939 | 90 |
| Class 345 | 874 | 52 |
| Class 387 | 854 | 68 |
| Class 150 | 738 | 69 |
| Class 165 | 711 | 61 |
| Class 375 | 664 | 86 |
| Class 700 | 656 | 69 |
| Class 465 | 625 | 64 |
| Class 170 | 596 | 87 |
Of 17,220 runs, 15,180 had a formation published (88%) — these are allocations rather than observations.
Buses
11,059 buses from 117 operators were seen on this date, across 1,936,109 position reports.
89,429 bus journeys were followed to their destination on this date. 58,154 arrived on time, 6,655 late, and 24,620 — 28% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0 minutes late, and 529 journeys finished more than twenty minutes down.
| Journeys followed to destination | 89,429 | |
|---|---|---|
| On time | 58,154 | 65.0% |
| Early | 24,620 | 27.5% |
| Late | 6,655 | 7.4% |
| …more than 20 minutes late | 529 | 0.6% |
| Average arrival | 0 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 75,085 | 65% | 29% |
Nottingham City Transport NCTR | 1,789 | 80% | 17% |
Go North East GNEL | 1,299 | 76% | 8% |
National Express NATX | 941 | 32% | 38% |
Bee Network BNML | 793 | 68% | 21% |
Arriva Yorkshire WRAY | 467 | 58% | 26% |
Bee Network BNSM | 338 | 72% | 20% |
Brighton & Hove Bus and Coach Company BHBC | 333 | 80% | 17% |
Preston Bus PBLT | 304 | 68% | 25% |
Reading Buses RBUS | 287 | 77% | 18% |
Arriva North West AMSY | 286 | 68% | 23% |
First Potteries FPOT | 286 | 60% | 35% |
Of the operators with enough journeys to compare, Fastrack (operated by Go Ahead) ran closest to time (89%), and National Express furthest from it (32%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 30 Aug 2026 itself. How these figures are measured · Sources and licences