TransitRadar

Wednesday, 2 September 2026

The railway ran close to plan on Wednesday, 2 September 2026: 89% of the 19,984 passenger trains whose arrival was recorded were within five minutes, and only 381 of 25,766 were cancelled.

17,792 of the 19,984 trains whose arrival was recorded were within five minutes, and the average delay was 1.2 minutes. Days like this rarely make the news, which is part of why they are worth recording.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

Even so, 69 trains were more than half an hour late. The worst was the 22:49 Sutton (London) to Bedford, which arrived 9h 14m behind schedule.

Where a reason was given at all, the most frequent was “This service has been delayed by a speed restriction” (658 services).

The day in numbers

Passenger trains recorded25,766
Cancelled3811.5%
Arrival time recorded19,98478.7% of those that ran
…arrived within 5 minutes17,79289.0%
…arrived 5 to 30 minutes late2,12310.6%
…arrived more than 30 minutes late690.3%
Average delay at destination1.2 min

Every percentage among the bands is of the 19,984 trains whose arrival reached the archive — not of all 25,766, and the bands are exclusive. 5,401 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

37 operators ran passenger services on this date, from ScotRail on 3,083 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0830%2,132 97% 97% 0.1 min
Northern NT2,8001%2,593 95% 94% 0.3 min
Great Western Railway GW2,1661%1,529 86% 85% 1.7 min
South Western Railway SW1,8471%1,390 93% 92% 0.5 min
Southeastern SE1,7951%1,664 87% 86% 1.7 min
Southern SN1,5924%1,418 78% 74% 3.2 min
London Overground LO1,5674%1,352 95% 91% 0 min
West Midlands Railway LM1,3171%1,014 86% 84% 1.7 min
Greater Anglia LE1,3050%1,214 91% 90% 0.6 min
Transport for Wales AW1,2412%952 94% 91% -0.3 min
Thameslink TL9513%562 82% 78% 3.5 min
London Underground LT7770%138 98% 98% -0.5 min
Elizabeth line XR6903%661 91% 89% 0 min
East Midlands Railway EM6191%474 79% 79% 2.4 min
Merseyrail ME6031%395 98% 97% -0.1 min
c2c CC4702%339 74% 72% 3.3 min
Great Northern GN4314%296 81% 76% 2.8 min
Avanti West Coast VT4201%303 46% 45% 8.4 min
CrossCountry XC3471%262 72% 71% 5.4 min
Chiltern Railways CH3434%319 97% 92% 0.4 min
TransPennine Express TP3302%298 88% 86% 1.9 min
London North Eastern Railway GR3150%191 85% 85% 0.3 min
Tyne and Wear Metro TW1690%80 99% 99% 1.1 min
Heathrow Express HX1500%148 96% 96% 0.3 min
Sheffield Supertram SJ970%35 100% 100% 0.2 min
Gatwick Express GX724%64 56% 54% 6 min
Island Line IL520%51 100% 100% -0.8 min
Eurostar ES500%25 84% 84% 2.8 min
Charter/Other ZZ480%3 67% 67% 11.3 min
West Coast Railway Co WR320%10 100% 100% -3.6 min
Grand Central GC215%19 63% 60% 6.7 min
Hull Trains HT140%14 100% 100% 1.4 min
LS LS130%4 100% 100% -2.8 min
Lumo LD110%11 55% 55% 5.9 min
Lumo Stirling LF100%10 80% 80% 0.1 min
Caledonian Sleeper CS1010%7 86% 75% -3.7 min
North Yorkshire Moors Railway NY80%7 43% 43% 5.3 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 89% and 87% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a speed restriction

658 services

This service has been delayed by a late running train being in front of this one

563 services

This service has been delayed by a speed restriction over defective track

420 services

This service has been delayed by a points failure

289 services

This service has been delayed by congestion

200 services

This service has been delayed by a problem currently under investigation

155 services

This service has been delayed by a fault with the signalling system

137 services

This service has been delayed by a fault on a train earlier

101 services

Why trains were cancelled

A reason reached the archive for 208 of the 381 cancellations (54.6%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a points failure

71 services

This service has been cancelled because of a late running train being in front of this one

30 services

This service has been cancelled because of a speed restriction

23 services

This service has been cancelled because of a fault on this train

22 services

This service has been cancelled because of a safety inspection of the track

19 services

This service has been cancelled because of trespassers on the railway

16 services

This service has been cancelled because of a shortage of train crew

14 services

This service has been cancelled because of congestion

13 services

The longest delays

The worst of them arrived 9h 14m behind schedule — Sutton (London) to Bedford, booked away at 22:49, run by Thameslink. The ten longest range from 9h 14m down to 58 min, and they belong to 6 operators, Thameslink accounting for 4. What a delay on that scale usually means.

BookedServiceLate by
22:49Sutton (London) to Bedford 9O96 · TL9h 14m
06:02Regent Centre (Bus) to South Hylton (T & W Metro) 2I05 · TW2h 21m
23:18Sutton (London) to Bedford 9V96 · TL1h 51m
22:19Sutton (London) to Bedford 9O94 · TL1h 47m
15:52East Croydon to London Bridge 2J42 · SN1h 46m
18:33Uckfield to London Bridge 1E44 · SN1h 20m
23:30Rainham (Kent) to Dartford 9A96 · TL1h 13m
13:30Manchester Piccadilly to Pembroke Dock 1V44 · AW1h 03m
16:14Manchester Piccadilly to London Euston 1A60 · VT59 min
18:40Hereford to Birmingham New Street 1M86 · LM58 min

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 56% of 146 arrived within five minutes.

00 146
01 39
02 17
03 24
04 153
05 935
06 1,624
07 1,673
08 1,551
09 1,447
10 1,419
11 1,402
12 1,401
13 1,404
14 1,426
15 1,461
16 1,561
17 1,633
18 1,530
19 1,351
20 1,224
21 1,114
22 901
23 330

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 17.

What ran

Formations were recorded for 27,093 trains on this date, made up of 2,896 individual units and 12,700 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,163 of the day's recorded trains from a pool of 223 units.

The average train was 5.6 vehicles long. The longest formation recorded was 16 vehicles.

ClassTrainsUnits used
Class 3773,163223
Class 4651,648102
Class 7201,589128
Class 4501,540120
Class 1581,452135
Class 1501,38290
Class 3871,33289
Class 3451,25468
Class 1651,15760
Class 1561,13889
Class 3751,044103
Class 7001,026105

Of 25,766 runs, 27,093 had a formation published (105%) — these are allocations rather than observations.

Buses

16,837 buses from 176 operators were seen on this date, across 3,122,789 position reports.

128,444 bus journeys were followed to their destination on this date. 90,282 arrived on time, 5,984 late, and 32,178 — 25% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.3 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination128,444
On time90,28270.3%
Early32,17825.1%
Late5,9844.7%
…more than 20 minutes late6000.5%
Average arrival0.3 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO102,85072%25%
Go North East GNEL2,08077%10%
Bee Network BNML1,00967%24%
Bee Network BNSM95681%15%
Arriva Yorkshire WRAY89456%29%
National Express NATX84132%34%
First Potteries FPOT81855%38%
First Bristol, Bath & the West FBRI79370%26%
First Leicester FLEI76757%38%
Preston Bus PBLT70962%31%
Brighton & Hove Bus and Coach Company BHBC55783%10%
trentbarton TBTN54459%32%

Of the operators with enough journeys to compare, Fastrack (operated by Go Ahead) ran closest to time (87%), and National Express furthest from it (32%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 2 Sept 2026 itself. How these figures are measured · Sources and licences