Saturday, 24 October 2026
Saturday, 24 October 2026 was a poor day on the railway: of the 19,030 passenger trains whose arrival was recorded, 80% were within five minutes, and a further 1,269 were cancelled outright.
A weekend timetable, so the 26,226 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.
3,381 trains arrived more than five minutes late and 454 more than half an hour, against 15,195 that ran to time. The average delay across every train whose arrival was recorded was 4 minutes.
The reason attached most often to a late train was “This service has been delayed by a late running train being in front of this one” — 518 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.
The busiest hour was 17:00, with 1,535 booked departures and an average delay of 5.7 minutes.
Buses on this date: 130,160 journeys followed to their destination, 69.5% on time.
The day in numbers
| Passenger trains recorded | 26,226 | |
|---|---|---|
| Cancelled | 1,269 | 4.8% |
| Arrival time recorded | 19,030 | 76.3% of those that ran |
| …arrived within 5 minutes | 15,195 | 79.8% |
| …arrived 5 to 30 minutes late | 3,381 | 17.8% |
| …arrived more than 30 minutes late | 454 | 2.4% |
| Average delay at destination | 4 min |
Every percentage among the bands is of the 19,030 trains whose arrival reached the archive — not of all 26,226, and the bands are exclusive. 5,927 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from ScotRail on 3,043 runs down to LS on 2. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,043 | 1% | 2,058 | 69% | 68% | 5.9 min |
Northern NT | 2,921 | 13% | 2,260 | 83% | 70% | 3.4 min |
South Western Railway SW | 2,347 | 2% | 1,523 | 74% | 72% | 5.9 min |
Great Western Railway GW | 2,051 | 4% | 1,389 | 69% | 66% | 6.2 min |
Southeastern SE | 1,701 | 2% | 1,439 | 88% | 86% | 3.3 min |
Southern SN | 1,642 | 3% | 1,406 | 84% | 81% | 3.6 min |
London Overground LO | 1,553 | 10% | 1,334 | 95% | 85% | 1.1 min |
Greater Anglia LE | 1,412 | 3% | 935 | 88% | 84% | 2.6 min |
West Midlands Railway LM | 1,269 | 2% | 1,182 | 80% | 79% | 3 min |
Transport for Wales AW | 1,108 | 12% | 736 | 73% | 62% | 5.3 min |
Thameslink TL | 865 | 1% | 542 | 83% | 81% | 2.8 min |
Merseyrail ME | 814 | 1% | 596 | 92% | 91% | 1.3 min |
Elizabeth line XR | 662 | 0% | 658 | 98% | 98% | -0.3 min |
East Midlands Railway EM | 640 | 2% | 484 | 67% | 65% | 5.4 min |
London Underground LT | 608 | 0% | 275 | 96% | 96% | 2 min |
TransPennine Express TP | 587 | 0% | 317 | 71% | 70% | 5.5 min |
CrossCountry XC | 468 | 16% | 223 | 45% | 34% | 11.9 min |
London North Eastern Railway GR | 460 | 0% | 204 | 74% | 73% | 4.4 min |
Avanti West Coast VT | 403 | 5% | 269 | 26% | 24% | 17.4 min |
c2c CC | 392 | 35% | 151 | 97% | 51% | 1 min |
Great Northern GN | 344 | 5% | 290 | 78% | 74% | 4.9 min |
Chiltern Railways CH | 260 | 2% | 220 | 85% | 84% | 2.3 min |
Tyne and Wear Metro TW | 166 | 0% | 164 | 99% | 99% | 0.7 min |
Heathrow Express HX | 152 | 0% | 150 | 93% | 93% | 1.4 min |
Sheffield Supertram SJ | 99 | 0% | 73 | 100% | 100% | 0.7 min |
Gatwick Express GX | 72 | 7% | 67 | 61% | 57% | 7.5 min |
Island Line IL | 52 | 0% | 0 | — | — | — |
Eurostar ES | 37 | 0% | 34 | 65% | 65% | 7.8 min |
Charter/Other ZZ | 29 | 0% | 7 | 29% | 29% | 6.1 min |
West Coast Railway Co WR | 12 | 0% | 0 | — | — | — |
Hull Trains HT | 12 | 0% | 12 | 58% | 58% | 3.9 min |
TY TY | 10 | 0% | 0 | — | — | — |
Lumo Stirling LF | 10 | 0% | 10 | 20% | 20% | 14.3 min |
North Yorkshire Moors Railway NY | 8 | 0% | 8 | 63% | 63% | 3.2 min |
Grand Central GC | 8 | 0% | 7 | 57% | 57% | 6 min |
Lumo LD | 4 | 0% | 4 | 75% | 75% | 4 min |
Caledonian Sleeper CS | 3 | 0% | 3 | 67% | 67% | 11.7 min |
LS LS | 2 | 0% | 0 | — | — | — |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 80% and 75% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
518 services
This service has been delayed by severe weather
375 services
This service has been delayed by a speed restriction
196 services
This service has been delayed by a tree blocking the railway
143 services
This service has been delayed by a speed restriction because of heavy rain
114 services
This service has been delayed by a speed restriction because of severe weather
109 services
This service has been delayed by a fault with the signalling system
99 services
This service has been delayed by a problem currently under investigation
79 services
Why trains were cancelled
A reason reached the archive for 1,074 of the 1,269 cancellations (84.6%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of forecasted severe weather
533 services
This service has been cancelled because of an operational incident
278 services
This service has been cancelled because of a tree blocking the railway
83 services
This service has been cancelled because of severe weather
60 services
This service has been cancelled because of damage to the overhead electric wires
48 services
This service has been cancelled because of a late running train being in front of this one
27 services
This service has been cancelled because of a speed restriction because of severe weather
24 services
This service has been cancelled because of a fault with the signalling system
21 services
The longest delays
The worst of them arrived 3h 55m behind schedule — London Waterloo to Portsmouth Harbour, booked away at 18:30, run by South Western Railway. The ten longest range from 3h 55m down to 2h 29m, and they belong to 6 operators, Southern accounting for 4. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
18:30 | London Waterloo to Portsmouth Harbour 1P59 · SW | 3h 55m |
17:00 | Scarborough to Sheffield 1J52 · NT | 3h 03m |
17:53 | Ramsgate to London Victoria 1P58 · SE | 3h 01m |
15:04 | Portsmouth Harbour to Horsham 1C45 · SN | 2h 52m |
18:42 | Ramsgate to London Charing Cross 2W64 · SE | 2h 50m |
18:46 | Stansted Airport to Norwich 1K84 · LE | 2h 50m |
19:08 | Ebbw Vale Town to Maesteg 2O42 · AW | 2h 42m |
14:46 | London Victoria to Littlehampton 1H36 · SN | 2h 37m |
15:28 | Portsmouth Harbour to Horsham 1C47 · SN | 2h 35m |
15:58 | Brighton to Chichester 2Y46 · SN | 2h 29m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 20:00, when 48% of 1,279 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 20.
What ran
Formations were recorded for 24,208 trains on this date, made up of 2,591 individual units and 11,358 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 2,711 of the day's recorded trains from a pool of 188 units.
The average train was 5.6 vehicles long. The longest formation recorded was 18 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 2,711 | 188 |
| Class 158 | 1,463 | 133 |
| Class 720 | 1,357 | 99 |
| Class 450 | 1,327 | 98 |
| Class 387 | 1,278 | 85 |
| Class 150 | 1,222 | 83 |
| Class 345 | 1,166 | 62 |
| Class 156 | 1,149 | 91 |
| Class 385 | 1,055 | 66 |
| Class 465 | 1,044 | 77 |
| Class 170 | 932 | 99 |
| Class 165 | 904 | 60 |
Of 26,226 runs, 24,208 had a formation published (92%) — these are allocations rather than observations.
Buses
15,773 buses from 153 operators were seen on this date, across 2,791,486 position reports.
130,160 bus journeys were followed to their destination on this date. 90,502 arrived on time, 7,100 late, and 32,558 — 25% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.1 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 130,160 | |
|---|---|---|
| On time | 90,502 | 69.5% |
| Early | 32,558 | 25.0% |
| Late | 7,100 | 5.5% |
| …more than 15 minutes late | 818 | 0.6% |
| Average arrival | 0.1 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 99,761 | 72% | 25% |
Nottingham City Transport NCTR | 2,380 | 77% | 18% |
Go North East GNEL | 1,921 | 68% | 11% |
First South Yorkshire FSYO | 1,557 | 54% | 31% |
First Leeds FLDS | 1,469 | 59% | 31% |
First Bristol, Bath & the West FBRI | 1,379 | 60% | 25% |
Bee Network BNSM | 886 | 77% | 20% |
National Express NATX | 878 | 35% | 34% |
Bee Network BNML | 869 | 74% | 20% |
Arriva Yorkshire WRAY | 758 | 59% | 34% |
National Express West Midlands TNXB | 722 | 78% | 12% |
First Potteries FPOT | 719 | 52% | 41% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (91%), and National Express furthest from it (35%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 24 Oct 2026 itself. How these figures are measured · Sources and licences