89% of the 22,406 passenger trains whose arrival was recorded on Thursday, 1 October 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.

Of 26,586 recorded runs, 413 did not run at all. Among those whose arrival reached the archive, 19,855 were within five minutes, 2,462 between five and thirty minutes down, and 89 more than half an hour — the tail that people actually remember.

“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 633 services.

London Underground came closest to running to time, 98.1% of its 415 recorded arrivals; CrossCountry had the largest cancelled share at 8.1%.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

Buses on this date: 138,475 journeys followed to their destination, 72.3% on time.

The day in numbers

Passenger trains recorded26,586
Cancelled4131.6%
Arrival time recorded22,40685.6% of those that ran
…arrived within 5 minutes19,85588.6%
…arrived 5 to 30 minutes late2,46211.0%
…arrived more than 30 minutes late890.4%
Average delay at destination1.5 min

Every percentage among the bands is of the 22,406 trains whose arrival reached the archive — not of all 26,586, and the bands are exclusive. 3,767 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

38 operators ran passenger services on this date, from ScotRail on 3,069 runs down to TY on 4. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0691%2,230 91% 90% 1.3 min
Northern NT2,8832%2,697 89% 88% 1.4 min
Great Western Railway GW2,1810%1,699 85% 84% 2 min
Southeastern SE1,8231%1,787 87% 86% 2 min
South Western Railway SW1,7681%1,582 88% 86% 1.6 min
Southern SN1,7183%1,609 84% 82% 2.5 min
London Overground LO1,6151%1,584 98% 97% -0.4 min
West Midlands Railway LM1,3411%1,289 93% 92% 0.7 min
Greater Anglia LE1,3212%1,262 87% 86% 1.4 min
Transport for Wales AW1,2904%1,021 89% 85% 0.9 min
Thameslink TL9882%632 84% 82% 2 min
London Underground LT7840%415 98% 98% 0.9 min
TransPennine Express TP7751%339 90% 87% 0.9 min
Elizabeth line XR6961%689 97% 96% -0.9 min
East Midlands Railway EM6301%492 78% 77% 3.1 min
Merseyrail ME6231%607 97% 96% 0.6 min
Great Northern GN4493%380 77% 74% 3.7 min
Avanti West Coast VT4251%314 62% 62% 5.8 min
c2c CC4172%357 94% 92% 1.8 min
CrossCountry XC3578%259 66% 59% 5.5 min
Chiltern Railways CH3516%328 97% 91% 0.4 min
London North Eastern Railway GR3181%194 79% 78% 1.8 min
Tyne and Wear Metro TW1740%170 92% 92% 1.2 min
Heathrow Express HX1520%150 81% 81% 2.8 min
Sheffield Supertram SJ980%74 100% 100% -0.1 min
Gatwick Express GX724%69 68% 65% 4.8 min
Eurostar ES550%55 82% 82% 3.4 min
Charter/Other ZZ530%2 100% 100% 1.5 min
Island Line IL520%52 100% 100% -0.3 min
Grand Central GC239%19 58% 52% 5.1 min
West Coast Railway Co WR180%5 100% 100% -12.6 min
Hull Trains HT140%14 79% 79% 1.9 min
Lumo LD120%12 92% 92% 1.5 min
Lumo Stirling LF1020%8 75% 60% 14.8 min
Caledonian Sleeper CS100%8 75% 75% 4.5 min
LS LS90%2 100% 100% -8.5 min
North Yorkshire Moors Railway NY80%0 — — —
TY TY40%0 — — —

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 89% and 87% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

633 services

This service has been delayed by a speed restriction

625 services

This service has been delayed by a fault with the signalling system

432 services

This service has been delayed by a speed restriction over defective track

202 services

This service has been delayed by congestion

183 services

This service has been delayed by a problem currently under investigation

147 services

This service has been delayed by a speed restriction in a tunnel

113 services

This service has been delayed by a fault on a train

96 services

Why trains were cancelled

A reason reached the archive for 209 of the 413 cancellations (50.6%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a fault with the signalling system

69 services

This service has been cancelled because of a points failure

24 services

This service has been cancelled because of earlier engineering works not being finished on time

22 services

This service has been cancelled because of a late running train being in front of this one

22 services

This service has been cancelled because of a fault on this train

21 services

This service has been cancelled because of a safety inspection of the track

20 services

This service has been cancelled because of a speed restriction in a tunnel

17 services

This service has been cancelled because of congestion

14 services

The longest delays

The worst of them arrived 1h 52m behind schedule — York to Leeds, booked away at 22:11, run by Northern. The ten longest range from 1h 52m down to 1h 05m, and they belong to 5 operators, Northern accounting for 6. What a delay on that scale usually means.

BookedServiceLate by
22:11York to Leeds 2C67 · NT1h 52m
08:52Carlisle to Newcastle 1N68 · NT1h 35m
13:05Horsham to Bognor Regis 1B28 · SN1h 31m
05:50Middlesbrough to Carlisle 1N51 · NT1h 27m
10:19London Euston to Stirling 1S01 · LF1h 23m
20:36Leeds to York 2C58 · NT1h 23m
07:26Newcastle to Carlisle 2N05 · NT1h 21m
08:33Carlisle to Middlesbrough 1J70 · NT1h 17m
15:48Norwich to Liverpool Lime Street 1R80 · EM1h 15m
20:13London Euston to Manchester Piccadilly 1H42 · VT1h 05m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 47% of 168 arrived within five minutes.

00 168
01 47
02 14
03 27
04 150
05 940
06 1,630
07 1,688
08 1,571
09 1,465
10 1,438
11 1,413
12 1,418
13 1,419
14 1,438
15 1,474
16 1,575
17 1,649
18 1,543
19 1,369
20 1,240
21 1,143
22 1,038
23 729

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 14.

What ran

Formations were recorded for 27,391 trains on this date, made up of 2,918 individual units and 12,834 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,353 of the day's recorded trains from a pool of 224 units.

The average train was 5.6 vehicles long. The longest formation recorded was 22 vehicles.

ClassTrainsUnits used
Class 3773,353224
Class 4651,663102
Class 4501,526120
Class 7201,521130
Class 1581,417131
Class 1501,40688
Class 3871,35096
Class 3451,25667
Class 1561,19993
Class 1651,19664
Class 7001,034107
Class 3751,028104

Of 26,586 runs, 27,391 had a formation published (103%) — these are allocations rather than observations.

Buses

17,369 buses from 185 operators were seen on this date, across 3,195,329 position reports.

138,475 bus journeys were followed to their destination on this date. 100,168 arrived on time, 8,170 late, and 30,137 — 22% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

The average arrival was 0.1 minutes late, and 790 journeys finished more than fifteen minutes down.

Journeys followed to destination138,475
On time100,16872.3%
Early30,13721.8%
Late8,1705.9%
…more than 15 minutes late7900.6%
Average arrival0.1 min late

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO108,73075%22%
Go North East GNEL2,09273%9%
First South Yorkshire FSYO2,04859%25%
First Leeds FLDS1,68861%24%
Bee Network BNSM91679%16%
Arriva Yorkshire WRAY85560%25%
First Potteries FPOT84757%31%
National Express West Midlands TNXB83876%15%
National Express NATX76135%31%
First Leicester FLEI75062%33%
Bee Network BNML71976%16%
Preston Bus PBLT71764%26%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (87%), and National Express furthest from it (35%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 1 Oct 2026 itself. How these figures are measured · Sources and licences