TransitRadar

Thursday, 1 October 2026

89% of the 22,148 passenger trains whose arrival was recorded on Thursday, 1 October 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.

Of 26,001 recorded runs, 545 did not run at all. Among those whose arrival reached the archive, 19,609 were within five minutes, 2,464 between five and thirty minutes down, and 75 more than half an hour — the tail that people actually remember.

“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 638 services.

London Underground came closest to running to time, 99.2% of its 396 recorded arrivals; CrossCountry had the largest cancelled share at 11.4%.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

The day in numbers

Passenger trains recorded26,001
Cancelled5452.1%
Arrival time recorded22,14887.0% of those that ran
…arrived within 5 minutes19,60988.5%
…arrived 5 to 30 minutes late2,46411.1%
…arrived more than 30 minutes late750.3%
Average delay at destination1.5 min

Every percentage among the bands is of the 22,148 trains whose arrival reached the archive — not of all 26,001, and the bands are exclusive. 3,308 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

38 operators ran passenger services on this date, from ScotRail on 2,982 runs down to Caledonian Sleeper on 4. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR2,9821%2,214 90% 89% 1.4 min
Northern NT2,8544%2,674 89% 86% 1.3 min
Great Western Railway GW2,1291%1,683 84% 84% 2 min
Southeastern SE1,8071%1,773 86% 86% 2.1 min
South Western Railway SW1,7301%1,564 87% 86% 1.6 min
Southern SN1,7034%1,616 84% 80% 2.5 min
London Overground LO1,6071%1,590 98% 98% -0.4 min
Greater Anglia LE1,3112%1,241 88% 86% 1.4 min
West Midlands Railway LM1,3091%1,266 93% 92% 0.8 min
Transport for Wales AW1,2474%1,004 89% 85% 0.7 min
Thameslink TL9532%623 85% 83% 1.9 min
London Underground LT7300%396 99% 99% 0.7 min
TransPennine Express TP7113%332 91% 86% 0.4 min
Elizabeth line XR6961%689 97% 96% -0.8 min
East Midlands Railway EM6192%486 79% 76% 2.9 min
Merseyrail ME6024%575 98% 94% 0.4 min
Great Northern GN4403%371 76% 74% 3.8 min
c2c CC4162%356 93% 91% 1.8 min
Avanti West Coast VT4081%307 62% 61% 5.8 min
CrossCountry XC35011%243 63% 54% 6.1 min
Chiltern Railways CH3496%326 97% 91% 0.4 min
London North Eastern Railway GR3051%192 81% 80% 1.5 min
Tyne and Wear Metro TW1660%166 93% 93% 1.1 min
Heathrow Express HX1520%150 81% 81% 2.8 min
Sheffield Supertram SJ960%72 100% 100% -0.1 min
Gatwick Express GX724%69 68% 65% 4.8 min
Eurostar ES530%53 83% 83% 3.4 min
Island Line IL520%52 100% 100% -0.3 min
Charter/Other ZZ500%1 100% 100% 0 min
Grand Central GC239%20 60% 55% 5 min
West Coast Railway Co WR180%4 100% 100% -15.8 min
Hull Trains HT140%14 79% 79% 1.9 min
Lumo LD120%12 92% 92% 1.5 min
Lumo Stirling LF1020%8 75% 60% 14.8 min
LS LS90%2 100% 100% -8.5 min
North Yorkshire Moors Railway NY80%3 100% 100% 0 min
TY TY40%0 — — —
Caledonian Sleeper CS40%1 100% 100% 3 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 89% and 86% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

638 services

This service has been delayed by a speed restriction

627 services

This service has been delayed by a fault with the signalling system

439 services

This service has been delayed by a speed restriction over defective track

202 services

This service has been delayed by congestion

189 services

This service has been delayed by a problem currently under investigation

147 services

This service has been delayed by a speed restriction in a tunnel

113 services

This service has been delayed by a fault on a train

97 services

Why trains were cancelled

A reason reached the archive for 272 of the 545 cancellations (49.9%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a fault with the signalling system

88 services

This service has been cancelled because of a fault on this train

41 services

This service has been cancelled because of a points failure

33 services

This service has been cancelled because of a safety inspection of the track

29 services

This service has been cancelled because of a late running train being in front of this one

24 services

This service has been cancelled because of earlier engineering works not being finished on time

22 services

This service has been cancelled because of a member of train crew being unavailable

18 services

This service has been cancelled because of a speed restriction in a tunnel

17 services

The longest delays

The worst of them arrived 1h 35m behind schedule — Carlisle to Newcastle, booked away at 08:52, run by Northern. The ten longest range from 1h 35m down to 1h 02m, and they belong to 6 operators, Northern accounting for 4. What a delay on that scale usually means.

BookedServiceLate by
08:52Carlisle to Newcastle 1N68 · NT1h 35m
13:05Horsham to Bognor Regis 1B28 · SN1h 31m
05:50Middlesbrough to Carlisle 1N51 · NT1h 27m
10:19London Euston to Stirling 1S01 · LF1h 23m
20:36Leeds to York 2C58 · NT1h 23m
07:26Newcastle to Carlisle 2N05 · NT1h 21m
06:40Cardiff Central to Nottingham 1M00 · XC1h 05m
20:13London Euston to Manchester Piccadilly 1H42 · VT1h 05m
23:00Cardiff Central to Treherbert 2T66 · AW1h 03m
05:00Birmingham New Street to Cardiff Central 1V01 · XC1h 02m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 46% of 168 arrived within five minutes.

00 168
01 47
02 14
03 27
04 150
05 940
06 1,630
07 1,688
08 1,571
09 1,465
10 1,438
11 1,413
12 1,418
13 1,418
14 1,437
15 1,474
16 1,575
17 1,647
18 1,537
19 1,346
20 1,155
21 1,017
22 874
23 552

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 14.

What ran

Formations were recorded for 27,386 trains on this date, made up of 2,918 individual units and 12,834 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,353 of the day's recorded trains from a pool of 224 units.

The average train was 5.6 vehicles long. The longest formation recorded was 22 vehicles.

ClassTrainsUnits used
Class 3773,353224
Class 4651,663102
Class 4501,526120
Class 7201,521130
Class 1581,417131
Class 1501,40688
Class 3871,35096
Class 3451,25667
Class 1561,19993
Class 1651,19664
Class 7001,029107
Class 3751,028104

Of 26,001 runs, 27,386 had a formation published (105%) — these are allocations rather than observations.

Buses

17,369 buses from 185 operators were seen on this date, across 3,195,329 position reports.

138,475 bus journeys were followed to their destination on this date. 100,168 arrived on time, 8,170 late, and 30,137 — 22% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

The average arrival was 0.1 minutes late, and 790 journeys finished more than twenty minutes down.

Journeys followed to destination138,475
On time100,16872.3%
Early30,13721.8%
Late8,1705.9%
…more than 20 minutes late7900.6%
Average arrival0.1 min late

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO108,73075%22%
Go North East GNEL2,09273%9%
First South Yorkshire FSYO2,04859%25%
First Leeds FLDS1,68861%24%
Bee Network BNSM91679%16%
Arriva Yorkshire WRAY85560%25%
First Potteries FPOT84757%31%
National Express West Midlands TNXB83876%15%
National Express NATX76135%31%
First Leicester FLEI75062%33%
Bee Network BNML71976%16%
Preston Bus PBLT71764%26%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (87%), and National Express furthest from it (35%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 1 Oct 2026 itself. How these figures are measured · Sources and licences