Tuesday, 8 September 2026
Tuesday, 8 September 2026 was a poor day on the railway: of the 21,316 passenger trains whose arrival was recorded, 87% were within five minutes, and a further 932 were cancelled outright.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
2,609 trains arrived more than five minutes late and 106 more than half an hour, against 18,601 that ran to time. The average delay across every train whose arrival was recorded was 1.6 minutes.
The reason attached most often to a late train was “This service has been delayed by a speed restriction” — 635 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.
The busiest hour was 07:00, with 1,662 booked departures and an average delay of 1.9 minutes.
The day in numbers
| Passenger trains recorded | 25,698 | |
|---|---|---|
| Cancelled | 932 | 3.6% |
| Arrival time recorded | 21,316 | 86.1% of those that ran |
| …arrived within 5 minutes | 18,601 | 87.3% |
| …arrived 5 to 30 minutes late | 2,609 | 12.2% |
| …arrived more than 30 minutes late | 106 | 0.5% |
| Average delay at destination | 1.6 min |
Every percentage among the bands is of the 21,316 trains whose arrival reached the archive — not of all 25,698, and the bands are exclusive. 3,450 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 3,044 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,044 | 1% | 2,224 | 94% | 93% | 0.7 min |
Northern NT | 2,820 | 4% | 2,622 | 91% | 87% | 0.8 min |
Great Western Railway GW | 2,149 | 6% | 1,542 | 85% | 79% | 1.9 min |
South Western Railway SW | 1,847 | 1% | 1,530 | 91% | 90% | 1.1 min |
Southeastern SE | 1,789 | 2% | 1,732 | 80% | 78% | 2.8 min |
London Overground LO | 1,613 | 2% | 1,558 | 96% | 93% | 0 min |
Southern SN | 1,595 | 6% | 1,425 | 78% | 74% | 3.2 min |
Greater Anglia LE | 1,352 | 5% | 1,280 | 93% | 88% | 0.6 min |
West Midlands Railway LM | 1,296 | 2% | 1,220 | 88% | 86% | 1.4 min |
Transport for Wales AW | 1,230 | 3% | 972 | 92% | 89% | 0.1 min |
Thameslink TL | 959 | 4% | 578 | 83% | 78% | 2.6 min |
London Underground LT | 774 | 0% | 397 | 93% | 93% | 1.3 min |
Elizabeth line XR | 696 | 10% | 626 | 93% | 84% | 0.1 min |
East Midlands Railway EM | 616 | 1% | 489 | 83% | 82% | 2 min |
Merseyrail ME | 594 | 1% | 588 | 98% | 97% | 0.3 min |
Great Northern GN | 440 | 5% | 350 | 76% | 72% | 4.7 min |
Avanti West Coast VT | 407 | 2% | 296 | 45% | 44% | 8.3 min |
c2c CC | 382 | 17% | 225 | 57% | 44% | 7.5 min |
Chiltern Railways CH | 351 | 13% | 303 | 90% | 79% | 1.4 min |
CrossCountry XC | 344 | 4% | 265 | 74% | 70% | 5 min |
TransPennine Express TP | 330 | 2% | 311 | 83% | 81% | 1.9 min |
London North Eastern Railway GR | 310 | 0% | 199 | 77% | 77% | 2 min |
Tyne and Wear Metro TW | 174 | 0% | 174 | 100% | 100% | 0.1 min |
Heathrow Express HX | 152 | 49% | 77 | 42% | 21% | 6.9 min |
Sheffield Supertram SJ | 98 | 0% | 74 | 95% | 95% | 0.8 min |
Gatwick Express GX | 71 | 7% | 65 | 49% | 46% | 8.1 min |
Charter/Other ZZ | 52 | 0% | 4 | 50% | 50% | 2.2 min |
Island Line IL | 52 | 0% | 52 | 100% | 100% | -0.5 min |
Eurostar ES | 51 | 0% | 51 | 69% | 69% | 13.9 min |
West Coast Railway Co WR | 24 | 0% | 10 | 50% | 50% | 8.5 min |
Grand Central GC | 20 | 0% | 20 | 65% | 65% | 4.8 min |
Hull Trains HT | 15 | 0% | 15 | 87% | 87% | 2.7 min |
Lumo LD | 12 | 0% | 12 | 67% | 67% | 3.2 min |
LS LS | 11 | 0% | 3 | 100% | 100% | -5.3 min |
Lumo Stirling LF | 10 | 0% | 10 | 40% | 40% | 6.6 min |
Caledonian Sleeper CS | 10 | 10% | 9 | 78% | 70% | -2.6 min |
North Yorkshire Moors Railway NY | 8 | 0% | 8 | 50% | 50% | -18.6 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 87% and 84% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a speed restriction
635 services
This service has been delayed by a speed restriction over defective track
495 services
This service has been delayed by a late running train being in front of this one
432 services
This service has been delayed by a fault with the signalling system
199 services
This service has been delayed by congestion
179 services
This service has been delayed by a fault on a train
176 services
This service has been delayed by vandalism of railway equipment
161 services
This service has been delayed by a fault on a train earlier
152 services
Why trains were cancelled
A reason reached the archive for 557 of the 932 cancellations (59.8%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of damage to the overhead electric wires
172 services
This service has been cancelled because of a fault with the signalling system
82 services
This service has been cancelled because of vandalism of railway equipment
61 services
This service has been cancelled because of a speed restriction over defective track
59 services
This service has been cancelled because of a fault on this train
59 services
This service has been cancelled because of a fault on a train
49 services
This service has been cancelled because of a speed restriction
42 services
This service has been cancelled because of a late running train being in front of this one
33 services
The longest delays
The worst of them arrived 2h 46m behind schedule — London Kings Cross to Ely, booked away at 11:24, run by Great Northern. The ten longest range from 2h 46m down to 1h 28m, and they belong to 6 operators, Eurostar accounting for 4. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
11:24 | London Kings Cross to Ely 1T24 · GN | 2h 46m |
09:44 | Brighton to Cambridge 9S18 · TL | 2h 30m |
10:05 | Edinburgh to Plymouth 1V58 · XC | 2h 23m |
07:48 | Glasgow Central to Plymouth 1V56 · XC | 2h 18m |
07:06 | Paris Nord to London St Pancras (Intl) 9O07 · ES | 1h 55m |
12:37 | Southend Central to London Fenchurch Street 2D47 · CC | 1h 42m |
13:46 | Aberdeen to Glasgow Queen Street 1T42 · SR | 1h 35m |
08:58 | Paris Nord to London St Pancras (Intl) 9O15 · ES | 1h 33m |
07:35 | Paris Nord to London St Pancras (Intl) 9O09 · ES | 1h 29m |
08:36 | Paris Nord to London St Pancras (Intl) 9O13 · ES | 1h 28m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 64% of 149 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 15.
What ran
Formations were recorded for 26,892 trains on this date, made up of 2,901 individual units and 12,762 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,089 of the day's recorded trains from a pool of 217 units.
The average train was 5.6 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,089 | 217 |
| Class 465 | 1,625 | 98 |
| Class 720 | 1,517 | 134 |
| Class 450 | 1,483 | 120 |
| Class 150 | 1,371 | 92 |
| Class 158 | 1,284 | 126 |
| Class 345 | 1,279 | 68 |
| Class 156 | 1,257 | 94 |
| Class 387 | 1,161 | 92 |
| Class 165 | 1,155 | 62 |
| Class 375 | 1,038 | 104 |
| Class 700 | 1,028 | 106 |
Of 25,698 runs, 26,892 had a formation published (105%) — these are allocations rather than observations.
Buses
17,267 buses from 190 operators were seen on this date, across 3,142,275 position reports.
139,017 bus journeys were followed to their destination on this date. 100,136 arrived on time, 7,714 late, and 31,167 — 22% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0 minutes late, and 890 journeys finished more than twenty minutes down.
| Journeys followed to destination | 139,017 | |
|---|---|---|
| On time | 100,136 | 72.0% |
| Early | 31,167 | 22.4% |
| Late | 7,714 | 5.5% |
| …more than 20 minutes late | 890 | 0.6% |
| Average arrival | 0 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 108,648 | 74% | 23% |
Nottingham City Transport NCTR | 2,552 | 80% | 15% |
Go North East GNEL | 2,057 | 73% | 10% |
First South Yorkshire FSYO | 1,949 | 62% | 24% |
First Leeds FLDS | 1,391 | 59% | 31% |
Bee Network BNML | 964 | 73% | 20% |
Bee Network BNSM | 899 | 79% | 15% |
Arriva Yorkshire WRAY | 870 | 63% | 23% |
National Express West Midlands TNXB | 844 | 76% | 15% |
First Potteries FPOT | 807 | 55% | 33% |
National Express NATX | 800 | 32% | 33% |
Preston Bus PBLT | 691 | 62% | 29% |
Of the operators with enough journeys to compare, Brighton & Hove Bus and Coach Company ran closest to time (82%), and National Express furthest from it (32%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 8 Sept 2026 itself. How these figures are measured · Sources and licences