TransitRadar

Monday, 7 September 2026

Monday, 7 September 2026 was a poor day on the railway: of the 20,158 passenger trains whose arrival was recorded, 89% were within five minutes, and a further 643 were cancelled outright.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

2,206 trains arrived more than five minutes late and 77 more than half an hour, against 17,875 that ran to time. The average delay across every train whose arrival was recorded was 1.3 minutes.

The reason attached most often to a late train was “This service has been delayed by a speed restriction” — 559 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.

The busiest hour was 07:00, with 1,662 booked departures and an average delay of 1.4 minutes.

The day in numbers

Passenger trains recorded25,491
Cancelled6432.5%
Arrival time recorded20,15881.1% of those that ran
…arrived within 5 minutes17,87588.7%
…arrived 5 to 30 minutes late2,20610.9%
…arrived more than 30 minutes late770.4%
Average delay at destination1.3 min

Every percentage among the bands is of the 20,158 trains whose arrival reached the archive — not of all 25,491, and the bands are exclusive. 4,690 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

37 operators ran passenger services on this date, from ScotRail on 3,034 runs down to LS on 8. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0340%2,176 97% 96% 0.3 min
Northern NT2,7851%2,591 93% 92% 0.6 min
Great Western Railway GW2,1266%1,444 82% 75% 2.7 min
South Western Railway SW1,8501%1,439 91% 90% 1 min
Southeastern SE1,7622%1,601 90% 88% 1.5 min
Southern SN1,6023%1,461 85% 82% 2.1 min
London Overground LO1,5992%1,557 98% 96% -0.3 min
Greater Anglia LE1,3284%1,231 94% 90% 0.4 min
West Midlands Railway LM1,2831%1,049 88% 87% 1.4 min
Transport for Wales AW1,2121%970 94% 93% -0.3 min
Thameslink TL9583%600 88% 84% 1.3 min
London Underground LT7560%161 94% 94% 1.4 min
Elizabeth line XR7269%584 76% 69% 2.3 min
East Midlands Railway EM6113%457 69% 66% 4.6 min
Merseyrail ME5920%405 100% 99% -0.6 min
Great Northern GN4376%306 73% 67% 3.8 min
Avanti West Coast VT4061%302 48% 47% 9 min
c2c CC3735%296 72% 67% 4.3 min
Chiltern Railways CH3477%314 95% 88% 0.6 min
CrossCountry XC3381%268 73% 71% 4.3 min
TransPennine Express TP3192%299 84% 82% 1.8 min
London North Eastern Railway GR3050%194 78% 78% 1.1 min
Tyne and Wear Metro TW1730%104 94% 94% 0.3 min
Heathrow Express HX15236%76 45% 26% 8.4 min
Sheffield Supertram SJ960%44 100% 100% -0.9 min
Gatwick Express GX711%68 68% 67% 4.4 min
Eurostar ES550%29 69% 69% 6.4 min
Island Line IL520%51 100% 100% -0.3 min
Charter/Other ZZ440%1 100% 100% 1 min
Grand Central GC200%20 60% 60% 5.4 min
West Coast Railway Co WR170%7 86% 86% -10.1 min
Hull Trains HT140%14 86% 86% 2.6 min
Lumo LD120%12 83% 83% 0.8 min
Lumo Stirling LF1010%9 67% 60% 7 min
Caledonian Sleeper CS100%10 80% 80% -8.6 min
North Yorkshire Moors Railway NY80%8 50% 50% -23.4 min
LS LS80%0 — — —

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 89% and 86% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a speed restriction

559 services

This service has been delayed by a late running train being in front of this one

497 services

This service has been delayed by a speed restriction over defective track

364 services

This service has been delayed by a fault with the signalling system

340 services

This service has been delayed by vandalism of railway equipment

253 services

This service has been delayed by congestion

194 services

This service has been delayed by a safety inspection of the track

182 services

This service has been delayed by a problem currently under investigation

180 services

Why trains were cancelled

A reason reached the archive for 435 of the 643 cancellations (67.7%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of vandalism of railway equipment

188 services

This service has been cancelled because of a fault with the signalling system

61 services

This service has been cancelled because of a speed restriction over defective track

56 services

This service has been cancelled because of a speed restriction

37 services

This service has been cancelled because of a fault on this train

25 services

This service has been cancelled because of a safety inspection of the track

24 services

This service has been cancelled because of a late running train being in front of this one

24 services

This service has been cancelled because of a shortage of train crew

20 services

The longest delays

The worst of them arrived 2h 02m behind schedule — Elephant & Castle Underground to Harrow & Wealdstone, booked away at 19:16, run by London Underground. The ten longest range from 2h 02m down to 59 min, and they belong to 7 operators, Transport for Wales accounting for 2. What a delay on that scale usually means.

BookedServiceLate by
19:16Elephant & Castle Underground to Harrow & Wealdstone 2J34 · LT2h 02m
20:30Manchester Piccadilly to Cardiff Central 1V66 · AW2h 00m
05:21Barnham to Portsmouth Harbour 1S02 · SN1h 37m
06:29Portsmouth Harbour to Barnham 1Z11 · SN1h 34m
12:03London Paddington to Penzance 1C79 · GW1h 22m
06:05Penzance to London Paddington 1A76 · GW1h 00m
19:35London Waterloo to Weymouth 1W81 · SW1h 00m
14:51Cardiff Central to Pembroke Dock 2B69 · AW59 min
12:40London Euston to Edinburgh 9S70 · VT59 min
23:20Matlock to Derby 2A83 · EM59 min

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 17:00, when 65% of 1,625 arrived within five minutes.

00 76
01 21
02 13
03 25
04 146
05 929
06 1,612
07 1,662
08 1,557
09 1,444
10 1,416
11 1,390
12 1,395
13 1,391
14 1,415
15 1,451
16 1,558
17 1,625
18 1,514
19 1,308
20 1,055
21 983
22 885
23 620

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 13.

What ran

Formations were recorded for 26,443 trains on this date, made up of 2,891 individual units and 12,711 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,119 of the day's recorded trains from a pool of 221 units.

The average train was 5.6 vehicles long. The longest formation recorded was 16 vehicles.

ClassTrainsUnits used
Class 3773,119221
Class 4651,60199
Class 7201,536129
Class 4501,475120
Class 1581,376133
Class 1501,31890
Class 3451,26268
Class 1561,19491
Class 1651,16963
Class 3871,13687
Class 3751,035103
Class 7001,006107

Of 25,491 runs, 26,443 had a formation published (104%) — these are allocations rather than observations.

Buses

17,176 buses from 188 operators were seen on this date, across 3,134,373 position reports.

135,303 bus journeys were followed to their destination on this date. 95,391 arrived on time, 6,324 late, and 33,588 — 25% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.2 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination135,303
On time95,39170.5%
Early33,58824.8%
Late6,3244.7%
…more than 20 minutes late6210.5%
Average arrival0.2 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO102,55372%25%
Nottingham City Transport NCTR2,56078%19%
Go North East GNEL2,10578%11%
First South Yorkshire FSYO2,03963%26%
First Leeds FLDS1,43859%33%
First Bristol, Bath & the West FBRI1,32567%28%
Bee Network BNML99477%19%
Bee Network BNSM89479%17%
National Express West Midlands TNXB84477%17%
Arriva Yorkshire WRAY84261%29%
National Express NATX82833%35%
First Potteries FPOT82158%33%

Of the operators with enough journeys to compare, Reading Buses ran closest to time (89%), and East Yorkshire furthest from it (32%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 7 Sept 2026 itself. How these figures are measured · Sources and licences