Wednesday, 9 September 2026
Wednesday, 9 September 2026 was a poor day on the railway: of the 19,882 passenger trains whose arrival was recorded, 86% were within five minutes, and a further 874 were cancelled outright.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
2,709 trains arrived more than five minutes late and 160 more than half an hour, against 17,013 that ran to time. The average delay across every train whose arrival was recorded was 2 minutes.
The reason attached most often to a late train was “This service has been delayed by a speed restriction” — 554 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.
The busiest hour was 07:00, with 1,659 booked departures and an average delay of 1.9 minutes.
The day in numbers
| Passenger trains recorded | 26,207 | |
|---|---|---|
| Cancelled | 874 | 3.3% |
| Arrival time recorded | 19,882 | 78.5% of those that ran |
| …arrived within 5 minutes | 17,013 | 85.6% |
| …arrived 5 to 30 minutes late | 2,709 | 13.6% |
| …arrived more than 30 minutes late | 160 | 0.8% |
| Average delay at destination | 2 min |
Every percentage among the bands is of the 19,882 trains whose arrival reached the archive — not of all 26,207, and the bands are exclusive. 5,451 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 3,138 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,138 | 1% | 2,129 | 97% | 96% | 0.6 min |
Northern NT | 2,831 | 1% | 2,530 | 88% | 87% | 1.2 min |
Great Western Railway GW | 2,184 | 6% | 1,438 | 83% | 76% | 2.7 min |
South Western Railway SW | 1,906 | 3% | 1,438 | 84% | 81% | 2.2 min |
Southeastern SE | 1,808 | 1% | 1,637 | 81% | 80% | 2.6 min |
Southern SN | 1,654 | 6% | 1,317 | 75% | 69% | 4.1 min |
London Overground LO | 1,612 | 7% | 1,329 | 93% | 86% | 0.4 min |
West Midlands Railway LM | 1,344 | 2% | 1,170 | 87% | 86% | 1.7 min |
Greater Anglia LE | 1,327 | 5% | 1,131 | 90% | 85% | 0.9 min |
Transport for Wales AW | 1,275 | 1% | 957 | 94% | 93% | -0.4 min |
Thameslink TL | 983 | 6% | 489 | 81% | 73% | 3.6 min |
London Underground LT | 790 | 0% | 305 | 94% | 94% | 1.4 min |
Elizabeth line XR | 697 | 6% | 593 | 93% | 86% | -0.1 min |
East Midlands Railway EM | 629 | 1% | 466 | 79% | 78% | 3.2 min |
Merseyrail ME | 622 | 0% | 563 | 98% | 98% | 0.3 min |
Great Northern GN | 445 | 5% | 337 | 79% | 74% | 2.8 min |
Avanti West Coast VT | 419 | 2% | 293 | 31% | 31% | 14.8 min |
c2c CC | 390 | 13% | 214 | 50% | 40% | 6.7 min |
Chiltern Railways CH | 366 | 6% | 326 | 94% | 88% | 0.6 min |
CrossCountry XC | 350 | 3% | 261 | 61% | 59% | 6.9 min |
TransPennine Express TP | 339 | 3% | 292 | 76% | 73% | 3.4 min |
London North Eastern Railway GR | 319 | 0% | 198 | 80% | 80% | 1.6 min |
Tyne and Wear Metro TW | 174 | 0% | 133 | 97% | 97% | 1.2 min |
Heathrow Express HX | 152 | 49% | 68 | 40% | 19% | 6.6 min |
Sheffield Supertram SJ | 98 | 0% | 58 | 95% | 95% | 0.3 min |
Gatwick Express GX | 72 | 6% | 24 | 58% | 50% | 5.4 min |
Charter/Other ZZ | 64 | 0% | 6 | 83% | 83% | -3.3 min |
Island Line IL | 52 | 0% | 46 | 100% | 100% | -0.5 min |
Eurostar ES | 52 | 0% | 46 | 74% | 74% | 6.5 min |
West Coast Railway Co WR | 22 | 0% | 9 | 78% | 78% | -7.3 min |
Grand Central GC | 21 | 5% | 19 | 58% | 55% | 6.4 min |
LS LS | 17 | 0% | 7 | 29% | 29% | 6.3 min |
Hull Trains HT | 15 | 0% | 15 | 73% | 73% | 3.3 min |
Lumo LD | 12 | 0% | 11 | 73% | 73% | 2.4 min |
Lumo Stirling LF | 10 | 0% | 10 | 40% | 40% | 19.2 min |
Caledonian Sleeper CS | 10 | 0% | 9 | 89% | 89% | -10.8 min |
North Yorkshire Moors Railway NY | 8 | 0% | 8 | 63% | 63% | -29.4 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 86% and 82% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a speed restriction
554 services
This service has been delayed by a late running train being in front of this one
520 services
This service has been delayed by a speed restriction over defective track
310 services
This service has been delayed by a safety inspection of the track
218 services
This service has been delayed by congestion
198 services
This service has been delayed by a fault with the signalling system
194 services
This service has been delayed by a person being hit by a train earlier today
144 services
This service has been delayed by a person being hit by a train
126 services
Why trains were cancelled
A reason reached the archive for 522 of the 874 cancellations (59.7%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of vandalism of railway equipment
213 services
This service has been cancelled because of a person being hit by a train
71 services
This service has been cancelled because of a fault with the signalling system
52 services
This service has been cancelled because of a safety inspection of the track
43 services
This service has been cancelled because of an operational incident
39 services
This service has been cancelled because of a speed restriction over defective track
38 services
This service has been cancelled because of a person being hit by a train earlier today
34 services
This service has been cancelled because of a shortage of train crew
32 services
The longest delays
The worst of them arrived 4h 11m behind schedule — Wick to Inverness, booked away at 12:34, run by ScotRail. The ten longest range from 4h 11m down to 1h 16m, and they belong to 7 operators, ScotRail accounting for 3. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
12:34 | Wick to Inverness 2H62 · SR | 4h 11m |
09:16 | Bedford to Brighton 9T21 · TL | 2h 37m |
08:53 | Peterborough to Horsham 9J19 · TL | 2h 25m |
05:03 | South Gosforth (T & W Metro) to Park Lane (Bus) 2I11 · TW | 2h 13m |
11:28 | Stansted Airport to London Liverpool Street 1B47 · LE | 1h 44m |
18:51 | Liverpool Lime Street to Nottingham 1L18 · EM | 1h 39m |
10:28 | London Bridge to London Victoria 2F19 · SN | 1h 30m |
16:00 | Wick to Inverness 2H64 · SR | 1h 20m |
22:03 | London Euston to Manchester Piccadilly 1H01 · VT | 1h 20m |
13:35 | Inverness to Kyle of Lochalsh 2H85 · SR | 1h 16m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 11% of 150 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 18.
What ran
Formations were recorded for 23,363 trains on this date, made up of 2,720 individual units and 12,093 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,092 of the day's recorded trains from a pool of 220 units.
The average train was 5.8 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,092 | 220 |
| Class 465 | 1,603 | 99 |
| Class 720 | 1,512 | 129 |
| Class 450 | 1,475 | 114 |
| Class 345 | 1,253 | 67 |
| Class 150 | 1,126 | 85 |
| Class 158 | 1,085 | 119 |
| Class 156 | 1,076 | 86 |
| Class 375 | 1,031 | 102 |
| Class 700 | 987 | 101 |
| Class 385 | 949 | 64 |
| Class 730 | 897 | 68 |
Of 26,207 runs, 23,363 had a formation published (89%) — these are allocations rather than observations.
Buses
17,175 buses from 193 operators were seen on this date, across 2,903,197 position reports.
125,593 bus journeys were followed to their destination on this date. 91,310 arrived on time, 7,003 late, and 27,280 — 22% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0.3 minutes late, and 774 journeys finished more than twenty minutes down.
| Journeys followed to destination | 125,593 | |
|---|---|---|
| On time | 91,310 | 72.7% |
| Early | 27,280 | 21.7% |
| Late | 7,003 | 5.6% |
| …more than 20 minutes late | 774 | 0.6% |
| Average arrival | 0.3 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 96,069 | 75% | 22% |
Nottingham City Transport NCTR | 2,325 | 77% | 17% |
First South Yorkshire FSYO | 1,982 | 62% | 24% |
Go North East GNEL | 1,979 | 78% | 9% |
First Leeds FLDS | 1,366 | 61% | 30% |
Bee Network BNML | 974 | 74% | 18% |
Bee Network BNSM | 923 | 77% | 17% |
National Express West Midlands TNXB | 832 | 78% | 14% |
Arriva Yorkshire WRAY | 829 | 60% | 25% |
First Potteries FPOT | 769 | 53% | 31% |
National Express NATX | 729 | 30% | 33% |
First Leicester FLEI | 707 | 58% | 38% |
Of the operators with enough journeys to compare, Fastrack (operated by Go Ahead) ran closest to time (90%), and National Express furthest from it (30%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 9 Sept 2026 itself. How these figures are measured · Sources and licences