The railway ran close to plan on Sunday, 1 November 2026: 89% of the 12,771 passenger trains whose arrival was recorded were within five minutes, and only 249 of 18,750 were cancelled.

11,398 of the 12,771 trains whose arrival was recorded were within five minutes, and the average delay was 1.1 minutes. Days like this rarely make the news, which is part of why they are worth recording.

A weekend timetable, so the 18,750 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.

Even so, 48 trains were more than half an hour late. The worst was the 08:21 Elephant & Castle Underground to Harrow & Wealdstone, which arrived 1h 43m behind schedule.

Where a reason was given at all, the most frequent was “This service has been delayed by a speed restriction” (478 services).

Buses on this date: 91,491 journeys followed to their destination, 63.9% on time.

The day in numbers

Passenger trains recorded18,750
Cancelled2491.3%
Arrival time recorded12,77169.0% of those that ran
…arrived within 5 minutes11,39889.2%
…arrived 5 to 30 minutes late1,32510.4%
…arrived more than 30 minutes late480.4%
Average delay at destination1.1 min

Every percentage among the bands is of the 12,771 trains whose arrival reached the archive — not of all 18,750, and the bands are exclusive. 5,730 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

37 operators ran passenger services on this date, from South Western Railway on 2,022 runs down to LS on 4. Ordered by volume, not performance — any heading re-sorts it.

Operator
South Western Railway SW2,0224%1,191 89% 84% 1.3 min
ScotRail SR1,6270%1,043 94% 94% 1.1 min
Northern NT1,6081%1,254 87% 86% 1.4 min
Southern SN1,2922%846 79% 77% 2.8 min
Southeastern SE1,2761%940 94% 93% 0.4 min
Great Western Railway GW1,2630%884 78% 78% 2.8 min
London Overground LO1,0382%1,010 99% 97% -0.7 min
Greater Anglia LE9990%923 98% 97% -0.5 min
Transport for Wales AW9271%545 90% 89% 0.2 min
Merseyrail ME9000%426 99% 99% -0.9 min
West Midlands Railway LM7943%629 87% 84% 1.6 min
London Underground LT6520%109 92% 92% 2.6 min
Thameslink TL6192%440 84% 82% 1.6 min
Elizabeth line XR5011%492 91% 91% 0.1 min
TransPennine Express TP4770%265 86% 86% 0.8 min
Great Northern GN3940%242 98% 98% -0.1 min
East Midlands Railway EM3781%278 79% 78% 2.7 min
London North Eastern Railway GR3530%175 91% 91% -0.3 min
CrossCountry XC3218%137 68% 57% 5.5 min
Avanti West Coast VT2863%178 60% 58% 5.3 min
c2c CC2082%139 95% 92% 0.5 min
Chiltern Railways CH1954%185 90% 87% 1 min
Island Line IL1350%0 — — —
Tyne and Wear Metro TW1280%124 98% 98% 0.7 min
Heathrow Express HX970%95 83% 83% 2.7 min
Gatwick Express GX720%72 88% 88% 1.3 min
Eurostar ES530%53 85% 85% 4.3 min
Sheffield Supertram SJ500%50 100% 100% 0 min
Charter/Other ZZ230%6 83% 83% -0.5 min
Hull Trains HT120%12 67% 67% 2.2 min
West Coast Railway Co WR100%0 — — —
Lumo Stirling LF80%8 88% 88% 1.1 min
Grand Central GC80%8 88% 88% 1.9 min
Caledonian Sleeper CS813%6 83% 71% -4.8 min
TY TY60%0 — — —
Lumo LD60%6 100% 100% -0.7 min
LS LS40%0 — — —

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 89% and 88% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a speed restriction

478 services

This service has been delayed by a late running train being in front of this one

339 services

This service has been delayed by congestion

160 services

This service has been delayed by a speed restriction over defective track

77 services

This service has been delayed by a problem currently under investigation

59 services

This service has been delayed by slippery rails

51 services

This service has been delayed by a fault with the signalling system

45 services

This service has been delayed by train crew being delayed

44 services

Why trains were cancelled

A reason reached the archive for 113 of the 249 cancellations (45.4%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a shortage of train drivers

23 services

This service has been cancelled because of the emergency services dealing with an incident

22 services

This service has been cancelled because of a fault on this train

15 services

This service has been cancelled because of a fault with the signalling system

14 services

This service has been cancelled because of a speed restriction

12 services

This service has been cancelled because of trespassers on the railway

11 services

This service has been cancelled because of a late running train being in front of this one

10 services

This service has been cancelled because of a points failure

6 services

The longest delays

The worst of them arrived 1h 43m behind schedule — Elephant & Castle Underground to Harrow & Wealdstone, booked away at 08:21, run by London Underground. The ten longest range from 1h 43m down to 47 min, and they belong to 7 operators, Great Western Railway accounting for 3. What a delay on that scale usually means.

BookedServiceLate by
08:21Elephant & Castle Underground to Harrow & Wealdstone 2J01 · LT1h 43m
11:47Aberdeen to Northallerton 1E19 · GR56 min
10:34London St Pancras (Intl) to Sheffield 1F07 · EM55 min
10:55Blackpool North to Manchester Airport 1Y59 · NT54 min
10:58Great Malvern to London Paddington 1P46 · GW51 min
14:00London Euston to Liverpool Lime Street 1F25 · VT50 min
14:00London Paddington to Penzance 1C84 · GW50 min
15:35London Victoria to Portsmouth Harbour 1C42 · SN49 min
19:20Carmarthen to London Paddington 1L96 · GW49 min
10:05London St Pancras (Intl) to Nottingham 1D06 · EM47 min

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 05:00, when 36% of 103 arrived within five minutes.

00 128
01 49
02 25
03 20
04 53
05 103
06 265
07 573
08 958
09 1,164
10 1,202
11 1,192
12 1,221
13 1,212
14 1,207
15 1,223
16 1,235
17 1,221
18 1,217
19 1,120
20 1,076
21 976
22 833
23 477

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 03:00 with 20.

What ran

Formations were recorded for 15,366 trains on this date, made up of 2,114 individual units and 9,545 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 1,466 of the day's recorded trains from a pool of 138 units.

The average train was 5.9 vehicles long. The longest formation recorded was 20 vehicles.

ClassTrainsUnits used
Class 3771,466138
Class 34593557
Class 158921109
Class 38785668
Class 45082864
Class 77778526
Class 72075771
Class 46570366
Class 70066886
Class 16565055
Class 37563370
Class 15662368

Of 18,750 runs, 15,366 had a formation published (82%) — these are allocations rather than observations.

Buses

10,923 buses from 117 operators were seen on this date, across 1,964,684 position reports.

91,491 bus journeys were followed to their destination on this date. 58,438 arrived on time, 6,797 late, and 26,256 — 29% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.1 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination91,491
On time58,43863.9%
Early26,25628.7%
Late6,7977.4%
…more than 15 minutes late5380.6%
Average arrival0.1 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO77,25464%30%
Nottingham City Transport NCTR1,75877%16%
Go North East GNEL1,16064%11%
National Express NATX88433%38%
Bee Network BNML63569%18%
Bee Network BNSM61077%16%
West Midlands Bus WMBL48268%17%
Arriva Yorkshire WRAY41356%32%
Preston Bus PBLT38367%30%
Brighton & Hove Bus and Coach Company BHBC33268%22%
First Potteries FPOT32261%29%
Stagecoach North East SCNE26151%28%

Of the operators with enough journeys to compare, Fastrack (operated by Go Ahead) ran closest to time (88%), and National Express furthest from it (33%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 1 Nov 2026 itself. How these figures are measured · Sources and licences