Monday, 2 November 2026
85% of the 21,949 passenger trains whose arrival was recorded on Monday, 2 November 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 26,067 recorded runs, 565 did not run at all. Among those whose arrival reached the archive, 18,700 were within five minutes, 3,100 between five and thirty minutes down, and 149 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 1,196 services.
Merseyrail came closest to running to time, 99.0% of its 617 recorded arrivals; Chiltern Railways had the largest cancelled share at 11.0%.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
Buses on this date: 129,198 journeys followed to their destination, 69.5% on time.
The day in numbers
| Passenger trains recorded | 26,067 | |
|---|---|---|
| Cancelled | 565 | 2.2% |
| Arrival time recorded | 21,949 | 86.1% of those that ran |
| …arrived within 5 minutes | 18,700 | 85.2% |
| …arrived 5 to 30 minutes late | 3,100 | 14.1% |
| …arrived more than 30 minutes late | 149 | 0.7% |
| Average delay at destination | 2.1 min |
Every percentage among the bands is of the 21,949 trains whose arrival reached the archive — not of all 26,067, and the bands are exclusive. 3,553 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 3,030 runs down to West Coast Railway Co on 4. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,030 | 0% | 2,256 | 91% | 91% | 1.4 min |
Northern NT | 2,831 | 6% | 2,529 | 84% | 78% | 2 min |
Great Western Railway GW | 2,176 | 1% | 1,693 | 86% | 85% | 1.9 min |
Southeastern SE | 1,802 | 1% | 1,776 | 83% | 82% | 2.4 min |
South Western Railway SW | 1,784 | 3% | 1,542 | 82% | 79% | 2.4 min |
Southern SN | 1,698 | 2% | 1,629 | 82% | 80% | 2.4 min |
London Overground LO | 1,538 | 2% | 1,502 | 97% | 96% | -0.3 min |
West Midlands Railway LM | 1,331 | 2% | 1,287 | 85% | 83% | 2.2 min |
Greater Anglia LE | 1,317 | 0% | 1,305 | 93% | 92% | 0.2 min |
Transport for Wales AW | 1,246 | 2% | 1,029 | 88% | 85% | 0.9 min |
Thameslink TL | 983 | 4% | 613 | 82% | 77% | 2.7 min |
Merseyrail ME | 818 | 0% | 617 | 99% | 99% | 0 min |
London Underground LT | 774 | 0% | 406 | 91% | 91% | 1.7 min |
Elizabeth line XR | 699 | 2% | 684 | 94% | 92% | -0.4 min |
East Midlands Railway EM | 633 | 1% | 503 | 80% | 79% | 3.6 min |
Great Northern GN | 441 | 7% | 349 | 66% | 60% | 7 min |
Avanti West Coast VT | 421 | 1% | 313 | 49% | 48% | 8.8 min |
c2c CC | 394 | 5% | 244 | 88% | 81% | 2.2 min |
CrossCountry XC | 350 | 2% | 266 | 48% | 47% | 8.9 min |
Chiltern Railways CH | 347 | 11% | 305 | 90% | 80% | 1.7 min |
TransPennine Express TP | 329 | 1% | 310 | 68% | 68% | 5 min |
London North Eastern Railway GR | 321 | 1% | 198 | 44% | 44% | 12.5 min |
Tyne and Wear Metro TW | 174 | 0% | 174 | 97% | 97% | 1 min |
Heathrow Express HX | 152 | 0% | 150 | 89% | 89% | 1.9 min |
Island Line IL | 138 | 0% | 0 | — | — | — |
Sheffield Supertram SJ | 97 | 0% | 73 | 95% | 95% | 1.6 min |
Gatwick Express GX | 72 | 3% | 68 | 66% | 64% | 4.9 min |
Eurostar ES | 54 | 0% | 54 | 72% | 72% | 5.3 min |
Charter/Other ZZ | 34 | 0% | 4 | 50% | 50% | 13 min |
Grand Central GC | 20 | 0% | 20 | 45% | 45% | 8.3 min |
Hull Trains HT | 14 | 0% | 14 | 43% | 43% | 8.9 min |
Lumo LD | 12 | 0% | 12 | 67% | 67% | 2.5 min |
Lumo Stirling LF | 10 | 10% | 9 | 67% | 60% | 3.2 min |
Caledonian Sleeper CS | 10 | 10% | 9 | 78% | 70% | 4.7 min |
LS LS | 8 | 0% | 0 | — | — | — |
TY TY | 5 | 0% | 5 | 80% | 80% | 5 min |
West Coast Railway Co WR | 4 | 0% | 1 | 100% | 100% | -127 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 85% and 83% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
1,196 services
This service has been delayed by a speed restriction
565 services
This service has been delayed by a speed restriction over defective track
388 services
This service has been delayed by a fault with the signalling system
358 services
This service has been delayed by slippery rails
340 services
This service has been delayed by a problem currently under investigation
287 services
This service has been delayed by a road vehicle colliding with a bridge
274 services
This service has been delayed by congestion
212 services
Why trains were cancelled
A reason reached the archive for 325 of the 565 cancellations (57.5%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of forecasted slippery rails
125 services
This service has been cancelled because of a late running train being in front of this one
53 services
This service has been cancelled because of a fault with the signalling system
34 services
This service has been cancelled because of a safety inspection of the track
24 services
This service has been cancelled because of a fault on this train
24 services
This service has been cancelled because of a safety inspection of the track earlier today
23 services
This service has been cancelled because of damage to the overhead electric wires
22 services
This service has been cancelled because of a speed restriction
20 services
The longest delays
The worst of them arrived 1h 50m behind schedule — London Kings Cross to Aberdeen, booked away at 05:48, run by London North Eastern Railway. The ten longest range from 1h 50m down to 1h 01m, and they belong to 5 operators, London North Eastern Railway accounting for 5. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
05:48 | London Kings Cross to Aberdeen 1S03 · GR | 1h 50m |
05:54 | London Kings Cross to Kings Lynn 1T02 · GN | 1h 31m |
06:00 | London Kings Cross to Leeds 1D02 · GR | 1h 27m |
05:47 | London Kings Cross to Peterborough 1P04 · TL | 1h 26m |
17:45 | Bournemouth to Manchester Piccadilly 1M70 · XC | 1h 11m |
13:30 | London Waterloo to Portsmouth Harbour 1P39 · SW | 1h 10m |
07:24 | London Kings Cross to Kings Lynn 1T08 · GN | 1h 07m |
06:33 | London Kings Cross to Newcastle 1N01 · GR | 1h 07m |
14:52 | Aberdeen to London Kings Cross 1E25 · GR | 1h 06m |
07:03 | London Kings Cross to Edinburgh 1S05 · GR | 1h 01m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 63% of 148 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 13.
What ran
Formations were recorded for 26,784 trains on this date, made up of 2,905 individual units and 12,761 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,272 of the day's recorded trains from a pool of 222 units.
The average train was 5.6 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,272 | 222 |
| Class 465 | 1,616 | 102 |
| Class 720 | 1,522 | 122 |
| Class 450 | 1,482 | 119 |
| Class 387 | 1,341 | 95 |
| Class 158 | 1,337 | 132 |
| Class 150 | 1,247 | 86 |
| Class 345 | 1,236 | 68 |
| Class 165 | 1,176 | 61 |
| Class 156 | 1,084 | 91 |
| Class 375 | 1,032 | 102 |
| Class 700 | 1,018 | 108 |
Of 26,067 runs, 26,784 had a formation published (103%) — these are allocations rather than observations.
Buses
17,698 buses from 183 operators were seen on this date, across 3,193,475 position reports.
129,198 bus journeys were followed to their destination on this date. 89,807 arrived on time, 5,873 late, and 33,518 — 26% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.3 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 129,198 | |
|---|---|---|
| On time | 89,807 | 69.5% |
| Early | 33,518 | 25.9% |
| Late | 5,873 | 4.5% |
| …more than 15 minutes late | 644 | 0.5% |
| Average arrival | 0.3 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 102,878 | 71% | 27% |
Nottingham City Transport NCTR | 2,454 | 76% | 18% |
Go North East GNEL | 1,953 | 74% | 10% |
West Midlands Bus WMBL | 969 | 74% | 16% |
Bee Network BNSM | 921 | 79% | 17% |
Arriva Yorkshire WRAY | 867 | 57% | 33% |
First Potteries FPOT | 828 | 56% | 36% |
National Express NATX | 799 | 34% | 35% |
Preston Bus PBLT | 732 | 64% | 31% |
Bee Network BNML | 728 | 71% | 22% |
Brighton & Hove Bus and Coach Company BHBC | 527 | 83% | 11% |
trentbarton TBTN | 523 | 56% | 30% |
Of the operators with enough journeys to compare, Reading Buses ran closest to time (89%), and National Express furthest from it (34%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 2 Nov 2026 itself. How these figures are measured · Sources and licences