TransitRadar

Tuesday, 3 November 2026

Tuesday, 3 November 2026 was a poor day on the railway: of the 21,669 passenger trains whose arrival was recorded, 83% were within five minutes, and a further 732 were cancelled outright.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

3,397 trains arrived more than five minutes late and 245 more than half an hour, against 18,027 that ran to time. The average delay across every train whose arrival was recorded was 2.6 minutes.

The reason attached most often to a late train was “This service has been delayed by a late running train being in front of this one” — 796 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.

The busiest hour was 07:00, with 1,661 booked departures and an average delay of 2.2 minutes.

Buses on this date: 129,198 journeys followed to their destination, 70.7% on time.

The day in numbers

Passenger trains recorded26,108
Cancelled7322.8%
Arrival time recorded21,66985.4% of those that ran
…arrived within 5 minutes18,02783.2%
…arrived 5 to 30 minutes late3,39715.7%
…arrived more than 30 minutes late2451.1%
Average delay at destination2.6 min

Every percentage among the bands is of the 21,669 trains whose arrival reached the archive — not of all 26,108, and the bands are exclusive. 3,707 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

37 operators ran passenger services on this date, from ScotRail on 3,032 runs down to SO on 1. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0322%2,172 86% 84% 2.5 min
Northern NT2,8326%2,565 85% 80% 1.9 min
Great Western Railway GW2,1821%1,655 79% 78% 3.2 min
Southeastern SE1,8196%1,644 67% 63% 5.5 min
South Western Railway SW1,7602%1,569 86% 84% 1.8 min
Southern SN1,7031%1,666 86% 85% 2 min
London Overground LO1,5421%1,510 96% 94% 0.1 min
West Midlands Railway LM1,3352%1,256 79% 77% 3.5 min
Greater Anglia LE1,3090%1,304 94% 94% 0.5 min
Transport for Wales AW1,2501%1,043 86% 85% 1.1 min
Thameslink TL9833%621 81% 78% 2.4 min
Merseyrail ME8131%608 99% 97% -0.2 min
London Underground LT7770%414 94% 94% 1.3 min
Elizabeth line XR69716%567 84% 71% 1.7 min
East Midlands Railway EM6360%506 85% 85% 2.3 min
Great Northern GN4444%362 76% 72% 3.8 min
Avanti West Coast VT4244%291 34% 32% 15.9 min
c2c CC3969%232 87% 75% 2.7 min
CrossCountry XC3576%263 56% 52% 9.8 min
Chiltern Railways CH3525%333 82% 78% 2.4 min
TransPennine Express TP3414%306 73% 70% 3.9 min
London North Eastern Railway GR3180%197 61% 61% 7.2 min
Tyne and Wear Metro TW1740%171 95% 95% 1.2 min
Heathrow Express HX1520%150 85% 85% 2.5 min
Island Line IL1380%0 — — —
Sheffield Supertram SJ980%74 78% 78% 3.1 min
Gatwick Express GX721%71 68% 67% 5 min
Eurostar ES480%48 77% 77% 4.1 min
Charter/Other ZZ350%2 100% 100% -5.5 min
Grand Central GC210%21 38% 38% 13.4 min
Hull Trains HT150%15 67% 67% 6.2 min
West Coast Railway Co WR120%0 — — —
LS LS120%4 50% 50% 5.5 min
Lumo LD120%12 67% 67% 5.7 min
Lumo Stirling LF100%10 50% 50% 15.1 min
Caledonian Sleeper CS60%6 50% 50% 9.3 min
SO SO10%1 0% 0% 18 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 83% and 80% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

796 services

This service has been delayed by a speed restriction

702 services

This service has been delayed by a speed restriction over defective track

541 services

This service has been delayed by a fault with the signalling system

301 services

This service has been delayed by slippery rails

217 services

This service has been delayed by emergency services dealing with an incident near the railway

204 services

This service has been delayed by congestion

165 services

This service has been delayed by emergency services dealing with an incident near the railway earlier today

152 services

Why trains were cancelled

A reason reached the archive for 473 of the 732 cancellations (64.6%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of forecasted slippery rails

122 services

This service has been cancelled because of a speed restriction over defective track

105 services

This service has been cancelled because of a fault with the signalling system

80 services

This service has been cancelled because of emergency services dealing with an incident near the railway

51 services

This service has been cancelled because of a late running train being in front of this one

41 services

This service has been cancelled because of a speed restriction

26 services

This service has been cancelled because of emergency services dealing with an incident near the railway earlier today

25 services

This service has been cancelled because of a fault with the signalling system earlier today

23 services

The longest delays

The worst of them arrived 2h 17m behind schedule — Strood to Paddock Wood, booked away at 10:03, run by Southeastern. The ten longest range from 2h 17m down to 1h 34m, and they belong to 5 operators, Avanti West Coast accounting for 4. What a delay on that scale usually means.

BookedServiceLate by
10:03Strood to Paddock Wood 2T24 · SE2h 17m
16:52Edinburgh to London Euston 9M60 · VT2h 15m
21:09Birmingham International to Chester 1R98 · AW2h 13m
11:12Liverpool Lime Street to Birmingham New Street 1G50 · LM2h 12m
10:43London Euston to Liverpool Lime Street 1F18 · VT2h 05m
20:08Birmingham International to Shrewsbury 1J63 · AW1h 57m
11:07London Euston to Liverpool Lime Street 1F19 · VT1h 55m
19:25Manchester Piccadilly to Southampton Central 1O34 · XC1h 39m
19:16London Euston to Wolverhampton 9G41 · VT1h 38m
20:52Birmingham New Street to Shrewsbury 1J68 · LM1h 34m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 17:00, when 62% of 1,619 arrived within five minutes.

00 138
01 33
02 12
03 25
04 154
05 915
06 1,615
07 1,661
08 1,538
09 1,441
10 1,415
11 1,397
12 1,398
13 1,404
14 1,415
15 1,457
16 1,554
17 1,619
18 1,521
19 1,351
20 1,220
21 1,128
22 1,014
23 683

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 12.

What ran

Formations were recorded for 27,074 trains on this date, made up of 2,911 individual units and 12,822 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,351 of the day's recorded trains from a pool of 222 units.

The average train was 5.6 vehicles long. The longest formation recorded was 19 vehicles.

ClassTrainsUnits used
Class 3773,351222
Class 4651,626102
Class 7201,523128
Class 4501,474117
Class 3871,38696
Class 1581,283127
Class 3451,25768
Class 1501,23887
Class 1651,17264
Class 1561,10493
Class 3751,034101
Class 7001,026107

Of 26,108 runs, 27,074 had a formation published (104%) — these are allocations rather than observations.

Buses

17,797 buses from 183 operators were seen on this date, across 3,226,472 position reports.

129,198 bus journeys were followed to their destination on this date. 91,338 arrived on time, 6,813 late, and 31,047 — 24% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.1 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination129,198
On time91,33870.7%
Early31,04724.0%
Late6,8135.3%
…more than 15 minutes late7630.6%
Average arrival0.1 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO103,68372%25%
Go North East GNEL1,95074%10%
Nottingham City Transport NCTR1,76374%18%
West Midlands Bus WMBL96273%15%
Bee Network BNSM92376%18%
Arriva Yorkshire WRAY91556%28%
First Potteries FPOT81661%31%
National Express NATX79434%34%
Preston Bus PBLT72864%29%
Bee Network BNML69173%19%
trentbarton TBTN55459%26%
Brighton & Hove Bus and Coach Company BHBC49385%9%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (88%), and National Express furthest from it (34%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 3 Nov 2026 itself. How these figures are measured · Sources and licences