Sunday, 16 August 2026
Sunday, 16 August 2026 was a poor day on the railway: of the 11,165 passenger trains whose arrival was recorded, 85% were within five minutes, and a further 606 were cancelled outright.
A weekend timetable, so the 16,353 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.
1,476 trains arrived more than five minutes late and 241 more than half an hour, against 9,448 that ran to time. The average delay across every train whose arrival was recorded was 2.5 minutes.
The reason attached most often to a late train was “This service has been delayed by a late running train being in front of this one” — 283 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.
The busiest hour was 16:00, with 1,125 booked departures and an average delay of 3.4 minutes.
The day in numbers
| Passenger trains recorded | 16,353 | |
|---|---|---|
| Cancelled | 606 | 3.7% |
| Arrival time recorded | 11,165 | 70.9% of those that ran |
| …arrived within 5 minutes | 9,448 | 84.6% |
| …arrived 5 to 30 minutes late | 1,476 | 13.2% |
| …arrived more than 30 minutes late | 241 | 2.2% |
| Average delay at destination | 2.5 min |
Every percentage among the bands is of the 11,165 trains whose arrival reached the archive — not of all 16,353, and the bands are exclusive. 4,582 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from ScotRail on 1,565 runs down to North Yorkshire Moors Railway on 4. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 1,565 | 1% | 913 | 92% | 91% | 0.9 min |
Northern NT | 1,403 | 1% | 1,023 | 89% | 88% | 1.2 min |
South Western Railway SW | 1,357 | 1% | 879 | 91% | 90% | 1.1 min |
London Overground LO | 1,282 | 3% | 1,168 | 99% | 96% | -0.4 min |
Great Western Railway GW | 1,176 | 6% | 748 | 76% | 69% | 4 min |
Southern SN | 1,172 | 9% | 823 | 69% | 61% | 6.3 min |
Southeastern SE | 1,072 | 3% | 842 | 76% | 74% | 3.6 min |
Greater Anglia LE | 959 | 11% | 774 | 95% | 83% | 0.4 min |
Transport for Wales AW | 786 | 2% | 577 | 87% | 84% | 0.8 min |
London Underground LT | 718 | 0% | 112 | 96% | 96% | -0.1 min |
West Midlands Railway LM | 663 | 7% | 427 | 78% | 70% | 3.5 min |
Thameslink TL | 608 | 9% | 325 | 74% | 63% | 4.1 min |
Elizabeth line XR | 510 | 1% | 468 | 96% | 95% | -0.6 min |
TransPennine Express TP | 428 | 1% | 288 | 87% | 86% | 1.2 min |
East Midlands Railway EM | 350 | 1% | 261 | 64% | 63% | 4.8 min |
Merseyrail ME | 339 | 1% | 212 | 97% | 96% | 0 min |
Avanti West Coast VT | 289 | 2% | 201 | 37% | 36% | 17.7 min |
Great Northern GN | 229 | 4% | 194 | 86% | 81% | 1.6 min |
London North Eastern Railway GR | 214 | 8% | 67 | 28% | 22% | 48.5 min |
CrossCountry XC | 212 | 7% | 131 | 58% | 52% | 8.2 min |
Chiltern Railways CH | 205 | 10% | 159 | 92% | 82% | 0.9 min |
c2c CC | 198 | 1% | 183 | 89% | 88% | 1.9 min |
Heathrow Express HX | 149 | 0% | 143 | 98% | 98% | -0.4 min |
Tyne and Wear Metro TW | 123 | 0% | 51 | 100% | 100% | -0.4 min |
Gatwick Express GX | 65 | 0% | 53 | 64% | 64% | 7.6 min |
Sheffield Supertram SJ | 51 | 0% | 22 | 100% | 100% | -0.5 min |
Eurostar ES | 49 | 0% | 23 | 57% | 57% | 10 min |
Island Line IL | 46 | 0% | 44 | 100% | 100% | -0.3 min |
Charter/Other ZZ | 33 | 0% | 0 | — | — | — |
Grand Central GC | 26 | 8% | 10 | 30% | 25% | 33.5 min |
West Coast Railway Co WR | 23 | 0% | 7 | 100% | 100% | -14.1 min |
Hull Trains HT | 12 | 0% | 9 | 11% | 11% | 19.1 min |
Lumo LD | 11 | 9% | 8 | 38% | 33% | 27.5 min |
Lumo Stirling LF | 8 | 0% | 7 | 43% | 43% | 13.4 min |
Caledonian Sleeper CS | 7 | 29% | 5 | 100% | 71% | -15 min |
TY TY | 6 | 0% | 3 | 100% | 100% | -9 min |
LS LS | 5 | 0% | 1 | 100% | 100% | -24 min |
North Yorkshire Moors Railway NY | 4 | 0% | 4 | 75% | 75% | -22.5 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 85% and 80% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
283 services
This service has been delayed by a safety inspection of the track
221 services
This service has been delayed by a fault with the signalling system
168 services
This service has been delayed by a problem currently under investigation
134 services
This service has been delayed by damage to the overhead electric wires
127 services
This service has been delayed by a speed restriction
114 services
This service has been delayed by a speed restriction over defective track
110 services
This service has been delayed by congestion
86 services
Why trains were cancelled
A reason reached the archive for 408 of the 606 cancellations (67.3%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a derailed train
98 services
This service has been cancelled because of a safety inspection of the track
82 services
This service has been cancelled because of a shortage of train crew
57 services
This service has been cancelled because of a shortage of train drivers
48 services
This service has been cancelled because of urgent repairs to the track
39 services
This service has been cancelled because of damage to the overhead electric wires
36 services
This service has been cancelled because of a member of train crew being unavailable
26 services
This service has been cancelled because of trespassers on the railway
22 services
The longest delays
The worst of them arrived 4h 09m behind schedule — Bradford Forster Square to London Kings Cross, booked away at 09:35, run by London North Eastern Railway. The ten longest range from 4h 09m down to 1h 41m, and all ten were London North Eastern Railway. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
09:35 | Bradford Forster Square to London Kings Cross 1A15 · GR | 4h 09m |
12:27 | York to London Kings Cross 1Y83 · GR | 2h 44m |
16:00 | London Kings Cross to Edinburgh 1S23 · GR | 2h 32m |
10:00 | Edinburgh to London Kings Cross 1E10 · GR | 2h 28m |
11:27 | Newcastle to London Kings Cross 1Y13 · GR | 2h 12m |
12:27 | Newcastle to London Kings Cross 1Y14 · GR | 1h 48m |
12:03 | London Kings Cross to Inverness 1S15 · GR | 1h 47m |
13:27 | Newcastle to London Kings Cross 1Y15 · GR | 1h 45m |
11:30 | Edinburgh to London Kings Cross 1E13 · GR | 1h 43m |
12:35 | Harrogate to London Kings Cross 1A21 · GR | 1h 41m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 10:00, when 47% of 1,086 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 03:00 with 18.
What ran
Formations were recorded for 14,353 trains on this date, made up of 2,012 individual units and 8,968 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 1,457 of the day's recorded trains from a pool of 116 units.
The average train was 5.9 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 1,457 | 116 |
| Class 158 | 904 | 117 |
| Class 345 | 897 | 53 |
| Class 387 | 862 | 69 |
| Class 450 | 809 | 72 |
| Class 720 | 721 | 57 |
| Class 150 | 715 | 60 |
| Class 165 | 630 | 53 |
| Class 700 | 618 | 68 |
| Class 385 | 563 | 53 |
| Class 375 | 556 | 74 |
| Class 465 | 547 | 41 |
Of 16,353 runs, 14,353 had a formation published (88%) — these are allocations rather than observations.
Buses
10,988 buses from 123 operators were seen on this date, across 1,975,388 position reports.
86,454 bus journeys were followed to their destination on this date. 54,670 arrived on time, 6,652 late, and 25,132 — 29% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.1 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 86,454 | |
|---|---|---|
| On time | 54,670 | 63.2% |
| Early | 25,132 | 29.1% |
| Late | 6,652 | 7.7% |
| …more than 20 minutes late | 530 | 0.6% |
| Average arrival | 0.1 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 70,370 | 63% | 30% |
Nottingham City Transport NCTR | 1,489 | 80% | 15% |
Go North East GNEL | 1,085 | 71% | 11% |
First Bristol, Bath & the West FBRI | 927 | 57% | 26% |
First Leeds FLDS | 916 | 59% | 28% |
National Express NATX | 899 | 32% | 38% |
First South Yorkshire FSYO | 859 | 58% | 24% |
Bee Network BNML | 655 | 67% | 25% |
National Express West Midlands TNXB | 469 | 77% | 13% |
Bee Network BNSM | 463 | 77% | 18% |
Arriva Yorkshire WRAY | 343 | 51% | 39% |
Brighton & Hove Bus and Coach Company BHBC | 266 | 81% | 14% |
Of the operators with enough journeys to compare, Brighton & Hove Bus and Coach Company ran closest to time (81%), and National Express furthest from it (32%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 16 Aug 2026 itself. How these figures are measured · Sources and licences