Sunday, 27 September 2026
88% of the 11,987 passenger trains whose arrival was recorded on Sunday, 27 September 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 17,712 recorded runs, 285 did not run at all. Among those whose arrival reached the archive, 10,595 were within five minutes, 1,297 between five and thirty minutes down, and 95 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 388 services.
Merseyrail came closest to running to time, 99.6% of its 265 recorded arrivals; Elizabeth line had the largest cancelled share at 6.4%.
A weekend timetable, so the 17,712 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.
The day in numbers
| Passenger trains recorded | 17,712 | |
|---|---|---|
| Cancelled | 285 | 1.6% |
| Arrival time recorded | 11,987 | 68.8% of those that ran |
| …arrived within 5 minutes | 10,595 | 88.4% |
| …arrived 5 to 30 minutes late | 1,297 | 10.8% |
| …arrived more than 30 minutes late | 95 | 0.8% |
| Average delay at destination | 1.5 min |
Every percentage among the bands is of the 11,987 trains whose arrival reached the archive — not of all 17,712, and the bands are exclusive. 5,440 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from South Western Railway on 1,864 runs down to Caledonian Sleeper on 3. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
South Western Railway SW | 1,864 | 2% | 1,006 | 84% | 80% | 2.7 min |
ScotRail SR | 1,723 | 1% | 1,076 | 94% | 93% | 0.9 min |
Northern NT | 1,452 | 0% | 1,189 | 92% | 91% | 0.7 min |
London Overground LO | 1,356 | 4% | 1,055 | 93% | 89% | 0.3 min |
Southeastern SE | 1,347 | 0% | 966 | 90% | 90% | 1.3 min |
Southern SN | 1,219 | 5% | 638 | 80% | 73% | 5.1 min |
Great Western Railway GW | 1,197 | 0% | 838 | 80% | 79% | 2.4 min |
Greater Anglia LE | 892 | 0% | 855 | 97% | 97% | -0.4 min |
Transport for Wales AW | 841 | 1% | 559 | 91% | 90% | -0.3 min |
West Midlands Railway LM | 706 | 2% | 534 | 87% | 85% | 1.7 min |
London Underground LT | 655 | 0% | 241 | 90% | 90% | 1.7 min |
TransPennine Express TP | 580 | 1% | 250 | 87% | 86% | 1.5 min |
Thameslink TL | 529 | 1% | 351 | 89% | 88% | 1.1 min |
Elizabeth line XR | 512 | 6% | 459 | 95% | 89% | -0.4 min |
East Midlands Railway EM | 354 | 1% | 239 | 79% | 78% | 3.1 min |
CrossCountry XC | 341 | 4% | 141 | 73% | 66% | 4 min |
Merseyrail ME | 324 | 0% | 265 | 100% | 100% | -0.1 min |
Avanti West Coast VT | 297 | 0% | 223 | 64% | 64% | 4.1 min |
Great Northern GN | 290 | 3% | 213 | 87% | 83% | 2.4 min |
London North Eastern Railway GR | 262 | 0% | 141 | 65% | 65% | 5.3 min |
c2c CC | 202 | 0% | 196 | 97% | 96% | 0.3 min |
Chiltern Railways CH | 196 | 8% | 177 | 93% | 86% | 1.4 min |
Tyne and Wear Metro TW | 128 | 0% | 75 | 89% | 89% | 1.4 min |
Heathrow Express HX | 97 | 0% | 96 | 77% | 77% | 3 min |
Island Line IL | 66 | 0% | 45 | 100% | 100% | -0.6 min |
Gatwick Express GX | 66 | 0% | 27 | 78% | 78% | 2.4 min |
Eurostar ES | 52 | 0% | 38 | 66% | 66% | 10.4 min |
Sheffield Supertram SJ | 51 | 0% | 32 | 100% | 100% | -0.9 min |
Charter/Other ZZ | 26 | 0% | 1 | 0% | 0% | 29 min |
West Coast Railway Co WR | 20 | 0% | 8 | 75% | 75% | -3 min |
Grand Central GC | 20 | 5% | 18 | 83% | 79% | 1.6 min |
Hull Trains HT | 12 | 0% | 11 | 64% | 64% | 10.8 min |
Lumo LD | 10 | 0% | 10 | 60% | 60% | 3.2 min |
Lumo Stirling LF | 8 | 0% | 7 | 86% | 86% | 2.1 min |
TY TY | 6 | 0% | 0 | — | — | — |
North Yorkshire Moors Railway NY | 4 | 0% | 4 | 75% | 75% | 5.8 min |
LS LS | 4 | 0% | 0 | — | — | — |
Caledonian Sleeper CS | 3 | 0% | 3 | 100% | 100% | 2.7 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 88% and 86% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
388 services
This service has been delayed by a fault with the signalling system
206 services
This service has been delayed by a speed restriction
166 services
This service has been delayed by congestion
119 services
This service has been delayed by a fire next to the track
114 services
This service has been delayed by a speed restriction over defective track
102 services
This service has been delayed by a problem currently under investigation
91 services
This service has been delayed by a fault with the signalling system earlier today
52 services
Why trains were cancelled
A reason reached the archive for 177 of the 285 cancellations (62.1%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fire next to the track
51 services
This service has been cancelled because of a fault with the signalling system
41 services
This service has been cancelled because of a fire on property near the railway
34 services
This service has been cancelled because of a shortage of train drivers
14 services
This service has been cancelled because of a late running train being in front of this one
11 services
This service has been cancelled because of a passenger being taken ill on a train earlier today
10 services
This service has been cancelled because of engineering works not being finished on time
9 services
This service has been cancelled because of a shortage of train crew
7 services
The longest delays
The worst of them arrived 3h 19m behind schedule — London St Pancras (Intl) to Brussels Midi, booked away at 17:04, run by Eurostar. The ten longest range from 3h 19m down to 1h 12m, and they belong to 5 operators, Southern accounting for 5. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
17:04 | London St Pancras (Intl) to Brussels Midi 9I48 · ES | 3h 19m |
12:54 | Arundel to London Victoria 1B33 · SN | 3h 08m |
13:28 | London Bridge to London Victoria 2F31 · SN | 2h 54m |
13:12 | Dorking to London Victoria 2I31 · SN | 2h 12m |
10:15 | London Waterloo to Yeovil Junction 1L25 · SW | 1h 58m |
18:46 | London Victoria to Ore 1F52 · SN | 1h 31m |
22:31 | Manchester Airport to York 1P95 · TP | 1h 25m |
15:15 | Lockwood to Lincoln Central 2P26 · NT | 1h 15m |
19:38 | Epsom Downs to London Victoria 2B25 · SN | 1h 12m |
15:32 | Portsmouth Harbour to London Waterloo 1P54 · SW | 1h 12m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 13:00, when 52% of 1,147 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 21.
What ran
Formations were recorded for 15,190 trains on this date, made up of 2,241 individual units and 10,033 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 1,528 of the day's recorded trains from a pool of 143 units.
The average train was 5.9 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 1,528 | 143 |
| Class 345 | 963 | 62 |
| Class 158 | 958 | 118 |
| Class 450 | 936 | 97 |
| Class 720 | 842 | 77 |
| Class 387 | 798 | 68 |
| Class 150 | 751 | 66 |
| Class 465 | 674 | 56 |
| Class 165 | 611 | 54 |
| Class 170 | 573 | 90 |
| Class 375 | 563 | 62 |
| Class 701 | 556 | 48 |
Of 17,712 runs, 15,190 had a formation published (86%) — these are allocations rather than observations.
Buses
11,096 buses from 120 operators were seen on this date, across 2,009,404 position reports.
94,821 bus journeys were followed to their destination on this date. 62,417 arrived on time, 7,243 late, and 25,161 — 27% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0 minutes late, and 500 journeys finished more than twenty minutes down.
| Journeys followed to destination | 94,821 | |
|---|---|---|
| On time | 62,417 | 65.8% |
| Early | 25,161 | 26.5% |
| Late | 7,243 | 7.6% |
| …more than 20 minutes late | 500 | 0.5% |
| Average arrival | 0 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 78,513 | 66% | 27% |
First Leeds FLDS | 1,216 | 62% | 25% |
Go North East GNEL | 1,203 | 73% | 10% |
First South Yorkshire FSYO | 1,074 | 56% | 27% |
First Bristol, Bath & the West FBRI | 997 | 65% | 21% |
National Express NATX | 869 | 32% | 39% |
Bee Network BNML | 569 | 74% | 18% |
Bee Network BNSM | 564 | 78% | 16% |
National Express West Midlands TNXB | 514 | 81% | 10% |
Arriva Yorkshire WRAY | 434 | 60% | 30% |
Preston Bus PBLT | 379 | 65% | 27% |
Brighton & Hove Bus and Coach Company BHBC | 351 | 82% | 14% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (91%), and National Express furthest from it (32%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 27 Sept 2026 itself. How these figures are measured · Sources and licences