88% of the 11,987 passenger trains whose arrival was recorded on Sunday, 27 September 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.

Of 17,712 recorded runs, 285 did not run at all. Among those whose arrival reached the archive, 10,595 were within five minutes, 1,297 between five and thirty minutes down, and 95 more than half an hour — the tail that people actually remember.

“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 388 services.

Merseyrail came closest to running to time, 99.6% of its 265 recorded arrivals; Elizabeth line had the largest cancelled share at 6.4%.

A weekend timetable, so the 17,712 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.

The day in numbers

Passenger trains recorded17,712
Cancelled2851.6%
Arrival time recorded11,98768.8% of those that ran
…arrived within 5 minutes10,59588.4%
…arrived 5 to 30 minutes late1,29710.8%
…arrived more than 30 minutes late950.8%
Average delay at destination1.5 min

Every percentage among the bands is of the 11,987 trains whose arrival reached the archive — not of all 17,712, and the bands are exclusive. 5,440 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

38 operators ran passenger services on this date, from South Western Railway on 1,864 runs down to Caledonian Sleeper on 3. Ordered by volume, not performance — any heading re-sorts it.

Operator
South Western Railway SW1,8642%1,006 84% 80% 2.7 min
ScotRail SR1,7231%1,076 94% 93% 0.9 min
Northern NT1,4520%1,189 92% 91% 0.7 min
London Overground LO1,3564%1,055 93% 89% 0.3 min
Southeastern SE1,3470%966 90% 90% 1.3 min
Southern SN1,2195%638 80% 73% 5.1 min
Great Western Railway GW1,1970%838 80% 79% 2.4 min
Greater Anglia LE8920%855 97% 97% -0.4 min
Transport for Wales AW8411%559 91% 90% -0.3 min
West Midlands Railway LM7062%534 87% 85% 1.7 min
London Underground LT6550%241 90% 90% 1.7 min
TransPennine Express TP5801%250 87% 86% 1.5 min
Thameslink TL5291%351 89% 88% 1.1 min
Elizabeth line XR5126%459 95% 89% -0.4 min
East Midlands Railway EM3541%239 79% 78% 3.1 min
CrossCountry XC3414%141 73% 66% 4 min
Merseyrail ME3240%265 100% 100% -0.1 min
Avanti West Coast VT2970%223 64% 64% 4.1 min
Great Northern GN2903%213 87% 83% 2.4 min
London North Eastern Railway GR2620%141 65% 65% 5.3 min
c2c CC2020%196 97% 96% 0.3 min
Chiltern Railways CH1968%177 93% 86% 1.4 min
Tyne and Wear Metro TW1280%75 89% 89% 1.4 min
Heathrow Express HX970%96 77% 77% 3 min
Island Line IL660%45 100% 100% -0.6 min
Gatwick Express GX660%27 78% 78% 2.4 min
Eurostar ES520%38 66% 66% 10.4 min
Sheffield Supertram SJ510%32 100% 100% -0.9 min
Charter/Other ZZ260%1 0% 0% 29 min
West Coast Railway Co WR200%8 75% 75% -3 min
Grand Central GC205%18 83% 79% 1.6 min
Hull Trains HT120%11 64% 64% 10.8 min
Lumo LD100%10 60% 60% 3.2 min
Lumo Stirling LF80%7 86% 86% 2.1 min
TY TY60%0 — — —
North Yorkshire Moors Railway NY40%4 75% 75% 5.8 min
LS LS40%0 — — —
Caledonian Sleeper CS30%3 100% 100% 2.7 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 88% and 86% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

388 services

This service has been delayed by a fault with the signalling system

206 services

This service has been delayed by a speed restriction

166 services

This service has been delayed by congestion

119 services

This service has been delayed by a fire next to the track

114 services

This service has been delayed by a speed restriction over defective track

102 services

This service has been delayed by a problem currently under investigation

91 services

This service has been delayed by a fault with the signalling system earlier today

52 services

Why trains were cancelled

A reason reached the archive for 177 of the 285 cancellations (62.1%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a fire next to the track

51 services

This service has been cancelled because of a fault with the signalling system

41 services

This service has been cancelled because of a fire on property near the railway

34 services

This service has been cancelled because of a shortage of train drivers

14 services

This service has been cancelled because of a late running train being in front of this one

11 services

This service has been cancelled because of a passenger being taken ill on a train earlier today

10 services

This service has been cancelled because of engineering works not being finished on time

9 services

This service has been cancelled because of a shortage of train crew

7 services

The longest delays

The worst of them arrived 3h 19m behind schedule — London St Pancras (Intl) to Brussels Midi, booked away at 17:04, run by Eurostar. The ten longest range from 3h 19m down to 1h 12m, and they belong to 5 operators, Southern accounting for 5. What a delay on that scale usually means.

BookedServiceLate by
17:04London St Pancras (Intl) to Brussels Midi 9I48 · ES3h 19m
12:54Arundel to London Victoria 1B33 · SN3h 08m
13:28London Bridge to London Victoria 2F31 · SN2h 54m
13:12Dorking to London Victoria 2I31 · SN2h 12m
10:15London Waterloo to Yeovil Junction 1L25 · SW1h 58m
18:46London Victoria to Ore 1F52 · SN1h 31m
22:31Manchester Airport to York 1P95 · TP1h 25m
15:15Lockwood to Lincoln Central 2P26 · NT1h 15m
19:38Epsom Downs to London Victoria 2B25 · SN1h 12m
15:32Portsmouth Harbour to London Waterloo 1P54 · SW1h 12m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 13:00, when 52% of 1,147 arrived within five minutes.

00 132
01 33
02 21
03 21
04 48
05 94
06 247
07 540
08 914
09 1,117
10 1,137
11 1,121
12 1,147
13 1,147
14 1,142
15 1,150
16 1,173
17 1,160
18 1,138
19 1,057
20 993
21 905
22 776
23 499

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 21.

What ran

Formations were recorded for 15,190 trains on this date, made up of 2,241 individual units and 10,033 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 1,528 of the day's recorded trains from a pool of 143 units.

The average train was 5.9 vehicles long. The longest formation recorded was 24 vehicles.

ClassTrainsUnits used
Class 3771,528143
Class 34596362
Class 158958118
Class 45093697
Class 72084277
Class 38779868
Class 15075166
Class 46567456
Class 16561154
Class 17057390
Class 37556362
Class 70155648

Of 17,712 runs, 15,190 had a formation published (86%) — these are allocations rather than observations.

Buses

11,096 buses from 120 operators were seen on this date, across 2,009,404 position reports.

94,821 bus journeys were followed to their destination on this date. 62,417 arrived on time, 7,243 late, and 25,161 — 27% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

The average arrival was 0 minutes late, and 500 journeys finished more than twenty minutes down.

Journeys followed to destination94,821
On time62,41765.8%
Early25,16126.5%
Late7,2437.6%
…more than 20 minutes late5000.5%
Average arrival0 min late

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO78,51366%27%
First Leeds FLDS1,21662%25%
Go North East GNEL1,20373%10%
First South Yorkshire FSYO1,07456%27%
First Bristol, Bath & the West FBRI99765%21%
National Express NATX86932%39%
Bee Network BNML56974%18%
Bee Network BNSM56478%16%
National Express West Midlands TNXB51481%10%
Arriva Yorkshire WRAY43460%30%
Preston Bus PBLT37965%27%
Brighton & Hove Bus and Coach Company BHBC35182%14%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (91%), and National Express furthest from it (32%).