TransitRadar

Tuesday, 22 September 2026

90% of the 22,340 passenger trains whose arrival was recorded on Tuesday, 22 September 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.

Of 26,347 recorded runs, 409 did not run at all. Among those whose arrival reached the archive, 20,102 were within five minutes, 2,106 between five and thirty minutes down, and 132 more than half an hour — the tail that people actually remember.

“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 559 services.

Tyne and Wear Metro came closest to running to time, 98.8% of its 171 recorded arrivals; CrossCountry had the largest cancelled share at 6.2%.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

The day in numbers

Passenger trains recorded26,347
Cancelled4091.6%
Arrival time recorded22,34086.1% of those that ran
…arrived within 5 minutes20,10290.0%
…arrived 5 to 30 minutes late2,1069.4%
…arrived more than 30 minutes late1320.6%
Average delay at destination1.3 min

Every percentage among the bands is of the 22,340 trains whose arrival reached the archive — not of all 26,347, and the bands are exclusive. 3,598 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

37 operators ran passenger services on this date, from ScotRail on 3,019 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0190%2,249 96% 95% 0.7 min
Northern NT2,8491%2,730 87% 86% 1.8 min
Great Western Railway GW2,1692%1,661 89% 87% 1.5 min
South Western Railway SW1,8851%1,574 91% 90% 0.9 min
Southeastern SE1,8121%1,785 92% 91% 1.2 min
Southern SN1,7052%1,641 90% 88% 1.3 min
London Overground LO1,6102%1,565 97% 95% -0.2 min
West Midlands Railway LM1,3222%1,267 91% 89% 1.2 min
Greater Anglia LE1,3100%1,294 90% 90% 1.2 min
Transport for Wales AW1,2154%971 90% 85% 0.4 min
Thameslink TL9741%639 90% 88% 1.1 min
London Underground LT7770%368 95% 95% 1.6 min
TransPennine Express TP7251%349 84% 83% 3.2 min
Elizabeth line XR6954%669 92% 88% 0 min
East Midlands Railway EM6253%474 72% 69% 6 min
Merseyrail ME6090%609 98% 98% 0.3 min
Great Northern GN4342%381 86% 84% 2.5 min
Avanti West Coast VT4171%308 56% 56% 7.2 min
c2c CC4112%357 92% 90% 1.6 min
CrossCountry XC3566%264 54% 50% 8.3 min
Chiltern Railways CH3505%327 93% 88% 1.1 min
London North Eastern Railway GR3160%200 91% 91% -1.2 min
Tyne and Wear Metro TW1740%171 99% 99% 0.3 min
Heathrow Express HX1500%150 93% 93% 0.6 min
Sheffield Supertram SJ980%74 100% 100% -0.2 min
Gatwick Express GX724%69 84% 81% 2.8 min
Island Line IL520%52 100% 100% -0.6 min
Eurostar ES510%50 88% 88% 2.7 min
Charter/Other ZZ490%2 50% 50% 41.5 min
West Coast Railway Co WR240%13 92% 92% -5.8 min
Grand Central GC229%20 65% 59% 5 min
LS LS150%7 71% 71% 2.7 min
Hull Trains HT150%15 80% 80% 3 min
Lumo LD120%12 92% 92% 1.6 min
Lumo Stirling LF1030%7 86% 60% 3.1 min
Caledonian Sleeper CS100%8 88% 88% -11 min
North Yorkshire Moors Railway NY80%8 100% 100% -0.1 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 90% and 88% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

559 services

This service has been delayed by a speed restriction

499 services

This service has been delayed by a speed restriction over defective track

281 services

This service has been delayed by a passenger being taken ill on a train

260 services

This service has been delayed by a broken down train earlier today

230 services

This service has been delayed by a fault with the signalling system

173 services

This service has been delayed by a problem currently under investigation

165 services

This service has been delayed by trespassers on the railway

120 services

Why trains were cancelled

A reason reached the archive for 215 of the 409 cancellations (52.6%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of more trains than usual needing repairs at the same time

42 services

This service has been cancelled because of a gas leak near the railway

41 services

This service has been cancelled because of a fault with the signalling system

35 services

This service has been cancelled because of a fault on this train

26 services

This service has been cancelled because of a speed restriction

24 services

This service has been cancelled because of a shortage of train drivers

16 services

This service has been cancelled because of a fault on a train

16 services

This service has been cancelled because of a points failure

15 services

The longest delays

The worst of them arrived 2h 10m behind schedule — London Paddington to Swansea, booked away at 17:18, run by Great Western Railway. The ten longest range from 2h 10m down to 1h 21m, and they belong to 7 operators, East Midlands Railway accounting for 3. What a delay on that scale usually means.

BookedServiceLate by
17:18London Paddington to Swansea 1B25 · GW2h 10m
15:13Skegness to Nottingham 2O20 · EM2h 05m
18:20Carmarthen to London Paddington 1L34 · GW1h 51m
04:52Glasgow Central to Manchester Airport 1M80 · TP1h 35m
10:30Swanage to TYSLSTM 5Z61 · ZZ1h 35m
05:33Glasgow Central to London Euston 1M06 · VT1h 29m
14:32London St Pancras (Intl) to Sheffield 1F47 · EM1h 23m
13:51Liverpool Lime Street to Norwich 1L13 · EM1h 23m
19:52Bletchley to Bedford 2S29 · LM1h 22m
07:17Tower Hill Underground to Upminster Underground 2O03 · LT1h 21m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 64% of 151 arrived within five minutes.

00 124
01 42
02 14
03 26
04 151
05 938
06 1,638
07 1,689
08 1,570
09 1,466
10 1,438
11 1,414
12 1,419
13 1,412
14 1,440
15 1,483
16 1,584
17 1,649
18 1,551
19 1,369
20 1,241
21 1,138
22 932
23 619

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 14.

What ran

Formations were recorded for 27,289 trains on this date, made up of 2,915 individual units and 12,818 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,311 of the day's recorded trains from a pool of 224 units.

The average train was 5.6 vehicles long. The longest formation recorded was 20 vehicles.

ClassTrainsUnits used
Class 3773,311224
Class 4651,636103
Class 7201,556129
Class 4501,555120
Class 1581,395131
Class 3871,35396
Class 1501,33085
Class 3451,27166
Class 1561,21195
Class 1651,19162
Class 3751,050106
Class 7001,037107

Of 26,347 runs, 27,289 had a formation published (104%) — these are allocations rather than observations.

Buses

17,310 buses from 185 operators were seen on this date, across 3,167,403 position reports.

136,203 bus journeys were followed to their destination on this date. 96,850 arrived on time, 7,710 late, and 31,643 — 23% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

The average arrival was 0 minutes late, and 787 journeys finished more than twenty minutes down.

Journeys followed to destination136,203
On time96,85071.1%
Early31,64323.2%
Late7,7105.7%
…more than 20 minutes late7870.6%
Average arrival0 min late

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO106,53874%24%
Go North East GNEL2,11773%11%
First South Yorkshire FSYO2,09457%25%
First Leeds FLDS1,69860%26%
Bee Network BNSM93478%16%
First Potteries FPOT85158%32%
Arriva Yorkshire WRAY85157%27%
National Express West Midlands TNXB82978%14%
National Express NATX81133%30%
First Leicester FLEI78759%37%
Preston Bus PBLT71864%30%
Bee Network BNML70874%18%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (92%), and National Express furthest from it (33%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 22 Sept 2026 itself. How these figures are measured · Sources and licences