Tuesday, 22 September 2026
90% of the 22,340 passenger trains whose arrival was recorded on Tuesday, 22 September 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 26,347 recorded runs, 409 did not run at all. Among those whose arrival reached the archive, 20,102 were within five minutes, 2,106 between five and thirty minutes down, and 132 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 559 services.
Tyne and Wear Metro came closest to running to time, 98.8% of its 171 recorded arrivals; CrossCountry had the largest cancelled share at 6.2%.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
The day in numbers
| Passenger trains recorded | 26,347 | |
|---|---|---|
| Cancelled | 409 | 1.6% |
| Arrival time recorded | 22,340 | 86.1% of those that ran |
| …arrived within 5 minutes | 20,102 | 90.0% |
| …arrived 5 to 30 minutes late | 2,106 | 9.4% |
| …arrived more than 30 minutes late | 132 | 0.6% |
| Average delay at destination | 1.3 min |
Every percentage among the bands is of the 22,340 trains whose arrival reached the archive — not of all 26,347, and the bands are exclusive. 3,598 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 3,019 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,019 | 0% | 2,249 | 96% | 95% | 0.7 min |
Northern NT | 2,849 | 1% | 2,730 | 87% | 86% | 1.8 min |
Great Western Railway GW | 2,169 | 2% | 1,661 | 89% | 87% | 1.5 min |
South Western Railway SW | 1,885 | 1% | 1,574 | 91% | 90% | 0.9 min |
Southeastern SE | 1,812 | 1% | 1,785 | 92% | 91% | 1.2 min |
Southern SN | 1,705 | 2% | 1,641 | 90% | 88% | 1.3 min |
London Overground LO | 1,610 | 2% | 1,565 | 97% | 95% | -0.2 min |
West Midlands Railway LM | 1,322 | 2% | 1,267 | 91% | 89% | 1.2 min |
Greater Anglia LE | 1,310 | 0% | 1,294 | 90% | 90% | 1.2 min |
Transport for Wales AW | 1,215 | 4% | 971 | 90% | 85% | 0.4 min |
Thameslink TL | 974 | 1% | 639 | 90% | 88% | 1.1 min |
London Underground LT | 777 | 0% | 368 | 95% | 95% | 1.6 min |
TransPennine Express TP | 725 | 1% | 349 | 84% | 83% | 3.2 min |
Elizabeth line XR | 695 | 4% | 669 | 92% | 88% | 0 min |
East Midlands Railway EM | 625 | 3% | 474 | 72% | 69% | 6 min |
Merseyrail ME | 609 | 0% | 609 | 98% | 98% | 0.3 min |
Great Northern GN | 434 | 2% | 381 | 86% | 84% | 2.5 min |
Avanti West Coast VT | 417 | 1% | 308 | 56% | 56% | 7.2 min |
c2c CC | 411 | 2% | 357 | 92% | 90% | 1.6 min |
CrossCountry XC | 356 | 6% | 264 | 54% | 50% | 8.3 min |
Chiltern Railways CH | 350 | 5% | 327 | 93% | 88% | 1.1 min |
London North Eastern Railway GR | 316 | 0% | 200 | 91% | 91% | -1.2 min |
Tyne and Wear Metro TW | 174 | 0% | 171 | 99% | 99% | 0.3 min |
Heathrow Express HX | 150 | 0% | 150 | 93% | 93% | 0.6 min |
Sheffield Supertram SJ | 98 | 0% | 74 | 100% | 100% | -0.2 min |
Gatwick Express GX | 72 | 4% | 69 | 84% | 81% | 2.8 min |
Island Line IL | 52 | 0% | 52 | 100% | 100% | -0.6 min |
Eurostar ES | 51 | 0% | 50 | 88% | 88% | 2.7 min |
Charter/Other ZZ | 49 | 0% | 2 | 50% | 50% | 41.5 min |
West Coast Railway Co WR | 24 | 0% | 13 | 92% | 92% | -5.8 min |
Grand Central GC | 22 | 9% | 20 | 65% | 59% | 5 min |
LS LS | 15 | 0% | 7 | 71% | 71% | 2.7 min |
Hull Trains HT | 15 | 0% | 15 | 80% | 80% | 3 min |
Lumo LD | 12 | 0% | 12 | 92% | 92% | 1.6 min |
Lumo Stirling LF | 10 | 30% | 7 | 86% | 60% | 3.1 min |
Caledonian Sleeper CS | 10 | 0% | 8 | 88% | 88% | -11 min |
North Yorkshire Moors Railway NY | 8 | 0% | 8 | 100% | 100% | -0.1 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 90% and 88% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
559 services
This service has been delayed by a speed restriction
499 services
This service has been delayed by a speed restriction over defective track
281 services
This service has been delayed by a passenger being taken ill on a train
260 services
This service has been delayed by a broken down train earlier today
230 services
This service has been delayed by a fault with the signalling system
173 services
This service has been delayed by a problem currently under investigation
165 services
This service has been delayed by trespassers on the railway
120 services
Why trains were cancelled
A reason reached the archive for 215 of the 409 cancellations (52.6%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of more trains than usual needing repairs at the same time
42 services
This service has been cancelled because of a gas leak near the railway
41 services
This service has been cancelled because of a fault with the signalling system
35 services
This service has been cancelled because of a fault on this train
26 services
This service has been cancelled because of a speed restriction
24 services
This service has been cancelled because of a shortage of train drivers
16 services
This service has been cancelled because of a fault on a train
16 services
This service has been cancelled because of a points failure
15 services
The longest delays
The worst of them arrived 2h 10m behind schedule — London Paddington to Swansea, booked away at 17:18, run by Great Western Railway. The ten longest range from 2h 10m down to 1h 21m, and they belong to 7 operators, East Midlands Railway accounting for 3. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
17:18 | London Paddington to Swansea 1B25 · GW | 2h 10m |
15:13 | Skegness to Nottingham 2O20 · EM | 2h 05m |
18:20 | Carmarthen to London Paddington 1L34 · GW | 1h 51m |
04:52 | Glasgow Central to Manchester Airport 1M80 · TP | 1h 35m |
10:30 | Swanage to TYSLSTM 5Z61 · ZZ | 1h 35m |
05:33 | Glasgow Central to London Euston 1M06 · VT | 1h 29m |
14:32 | London St Pancras (Intl) to Sheffield 1F47 · EM | 1h 23m |
13:51 | Liverpool Lime Street to Norwich 1L13 · EM | 1h 23m |
19:52 | Bletchley to Bedford 2S29 · LM | 1h 22m |
07:17 | Tower Hill Underground to Upminster Underground 2O03 · LT | 1h 21m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 64% of 151 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 14.
What ran
Formations were recorded for 27,289 trains on this date, made up of 2,915 individual units and 12,818 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,311 of the day's recorded trains from a pool of 224 units.
The average train was 5.6 vehicles long. The longest formation recorded was 20 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,311 | 224 |
| Class 465 | 1,636 | 103 |
| Class 720 | 1,556 | 129 |
| Class 450 | 1,555 | 120 |
| Class 158 | 1,395 | 131 |
| Class 387 | 1,353 | 96 |
| Class 150 | 1,330 | 85 |
| Class 345 | 1,271 | 66 |
| Class 156 | 1,211 | 95 |
| Class 165 | 1,191 | 62 |
| Class 375 | 1,050 | 106 |
| Class 700 | 1,037 | 107 |
Of 26,347 runs, 27,289 had a formation published (104%) — these are allocations rather than observations.
Buses
17,310 buses from 185 operators were seen on this date, across 3,167,403 position reports.
136,203 bus journeys were followed to their destination on this date. 96,850 arrived on time, 7,710 late, and 31,643 — 23% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0 minutes late, and 787 journeys finished more than twenty minutes down.
| Journeys followed to destination | 136,203 | |
|---|---|---|
| On time | 96,850 | 71.1% |
| Early | 31,643 | 23.2% |
| Late | 7,710 | 5.7% |
| …more than 20 minutes late | 787 | 0.6% |
| Average arrival | 0 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 106,538 | 74% | 24% |
Go North East GNEL | 2,117 | 73% | 11% |
First South Yorkshire FSYO | 2,094 | 57% | 25% |
First Leeds FLDS | 1,698 | 60% | 26% |
Bee Network BNSM | 934 | 78% | 16% |
First Potteries FPOT | 851 | 58% | 32% |
Arriva Yorkshire WRAY | 851 | 57% | 27% |
National Express West Midlands TNXB | 829 | 78% | 14% |
National Express NATX | 811 | 33% | 30% |
First Leicester FLEI | 787 | 59% | 37% |
Preston Bus PBLT | 718 | 64% | 30% |
Bee Network BNML | 708 | 74% | 18% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (92%), and National Express furthest from it (33%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 22 Sept 2026 itself. How these figures are measured · Sources and licences