Monday, 21 September 2026
88% of the 22,005 passenger trains whose arrival was recorded on Monday, 21 September 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 26,302 recorded runs, 538 did not run at all. Among those whose arrival reached the archive, 19,406 were within five minutes, 2,459 between five and thirty minutes down, and 140 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 654 services.
Merseyrail came closest to running to time, 99.8% of its 604 recorded arrivals; Chiltern Railways had the largest cancelled share at 7.8%.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
The day in numbers
| Passenger trains recorded | 26,302 | |
|---|---|---|
| Cancelled | 538 | 2.0% |
| Arrival time recorded | 22,005 | 85.4% of those that ran |
| …arrived within 5 minutes | 19,406 | 88.2% |
| …arrived 5 to 30 minutes late | 2,459 | 11.2% |
| …arrived more than 30 minutes late | 140 | 0.6% |
| Average delay at destination | 1.6 min |
Every percentage among the bands is of the 22,005 trains whose arrival reached the archive — not of all 26,302, and the bands are exclusive. 3,759 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 3,026 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,026 | 1% | 2,239 | 93% | 92% | 1 min |
Northern NT | 2,850 | 1% | 2,706 | 89% | 88% | 1.3 min |
Great Western Railway GW | 2,162 | 1% | 1,667 | 88% | 88% | 1.4 min |
South Western Railway SW | 1,896 | 6% | 1,466 | 85% | 79% | 2.3 min |
Southeastern SE | 1,802 | 1% | 1,759 | 89% | 88% | 1.6 min |
Southern SN | 1,692 | 3% | 1,589 | 84% | 81% | 2.3 min |
London Overground LO | 1,628 | 2% | 1,544 | 97% | 95% | -0.1 min |
West Midlands Railway LM | 1,316 | 4% | 1,236 | 82% | 79% | 3 min |
Greater Anglia LE | 1,307 | 0% | 1,296 | 92% | 92% | 0.5 min |
Transport for Wales AW | 1,233 | 7% | 945 | 90% | 82% | 0.2 min |
Thameslink TL | 976 | 2% | 603 | 87% | 84% | 1.4 min |
London Underground LT | 764 | 0% | 368 | 96% | 96% | 1 min |
TransPennine Express TP | 710 | 1% | 341 | 83% | 82% | 2.7 min |
Elizabeth line XR | 696 | 0% | 692 | 97% | 96% | -0.8 min |
East Midlands Railway EM | 621 | 2% | 488 | 76% | 75% | 2.7 min |
Merseyrail ME | 608 | 0% | 604 | 100% | 100% | 0.1 min |
Great Northern GN | 428 | 1% | 377 | 85% | 84% | 2.2 min |
Avanti West Coast VT | 418 | 0% | 317 | 55% | 55% | 7 min |
c2c CC | 410 | 1% | 351 | 89% | 87% | 1.9 min |
CrossCountry XC | 348 | 6% | 255 | 49% | 45% | 11.4 min |
Chiltern Railways CH | 348 | 8% | 318 | 89% | 82% | 1.6 min |
London North Eastern Railway GR | 315 | 0% | 196 | 65% | 65% | 4.9 min |
Tyne and Wear Metro TW | 174 | 0% | 174 | 99% | 99% | 0.6 min |
Heathrow Express HX | 150 | 0% | 150 | 94% | 94% | 0.6 min |
Sheffield Supertram SJ | 97 | 0% | 73 | 99% | 99% | 0.3 min |
Gatwick Express GX | 72 | 1% | 71 | 63% | 63% | 4.5 min |
Eurostar ES | 55 | 0% | 55 | 78% | 78% | 4.5 min |
Island Line IL | 52 | 0% | 52 | 100% | 100% | -0.2 min |
Charter/Other ZZ | 50 | 0% | 3 | 100% | 100% | 3.3 min |
Grand Central GC | 20 | 0% | 20 | 65% | 65% | 5.5 min |
West Coast Railway Co WR | 16 | 0% | 10 | 90% | 90% | -5.6 min |
Hull Trains HT | 14 | 0% | 14 | 71% | 71% | 3.6 min |
Lumo LD | 11 | 9% | 10 | 60% | 55% | 7.5 min |
Lumo Stirling LF | 10 | 0% | 7 | 57% | 57% | 5 min |
Caledonian Sleeper CS | 10 | 20% | 8 | 88% | 70% | -7.2 min |
LS LS | 9 | 0% | 1 | 100% | 100% | -8 min |
North Yorkshire Moors Railway NY | 8 | 0% | 0 | — | — | — |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 88% and 86% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
654 services
This service has been delayed by a speed restriction
455 services
This service has been delayed by a speed restriction over defective track
281 services
This service has been delayed by a fault with the signalling system
280 services
This service has been delayed by congestion
129 services
This service has been delayed by a safety inspection of the track
116 services
This service has been delayed by a problem currently under investigation
111 services
This service has been delayed by the train departing late to maintain customer connections
105 services
Why trains were cancelled
A reason reached the archive for 336 of the 538 cancellations (62.5%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault with the signalling system
114 services
This service has been cancelled because of more trains than usual needing repairs at the same time
78 services
This service has been cancelled because of a late running train being in front of this one
27 services
This service has been cancelled because of a fault on this train
26 services
This service has been cancelled because of a broken down train
26 services
This service has been cancelled because of the fire alarm sounding in the signalling centre earlier today
24 services
This service has been cancelled because of a person being hit by a train earlier today
21 services
This service has been cancelled because of a shortage of train drivers
20 services
The longest delays
The worst of them arrived 2h 56m behind schedule — Nottingham to Cardiff Central, booked away at 11:07, run by CrossCountry. The ten longest range from 2h 56m down to 1h 17m, and they belong to 4 operators, South Western Railway accounting for 5. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
11:07 | Nottingham to Cardiff Central 1V08 · XC | 2h 56m |
17:00 | Redhill to Tonbridge 2A48 · SN | 2h 16m |
16:09 | London Waterloo to Portsmouth Harbour 1T49 · SW | 1h 42m |
11:30 | London Waterloo to Portsmouth Harbour 1P31 · SW | 1h 33m |
12:30 | London Waterloo to Portsmouth Harbour 1P35 · SW | 1h 32m |
05:35 | Inverness to Glasgow Queen Street 1T80 · SR | 1h 31m |
10:27 | Plymouth to Edinburgh 1S47 · XC | 1h 31m |
12:00 | London Waterloo to Portsmouth Harbour 1P33 · SW | 1h 29m |
12:09 | London Waterloo to Portsmouth Harbour 1T33 · SW | 1h 23m |
12:20 | Southampton Central to Brighton 1N29 · SN | 1h 17m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 69% of 144 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 12.
What ran
Formations were recorded for 26,927 trains on this date, made up of 2,915 individual units and 12,826 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,272 of the day's recorded trains from a pool of 220 units.
The average train was 5.6 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,272 | 220 |
| Class 465 | 1,631 | 103 |
| Class 720 | 1,552 | 127 |
| Class 158 | 1,470 | 136 |
| Class 450 | 1,444 | 115 |
| Class 387 | 1,334 | 92 |
| Class 150 | 1,295 | 85 |
| Class 345 | 1,233 | 68 |
| Class 165 | 1,178 | 64 |
| Class 156 | 1,176 | 95 |
| Class 375 | 1,038 | 105 |
| Class 700 | 1,009 | 106 |
Of 26,302 runs, 26,927 had a formation published (102%) — these are allocations rather than observations.
Buses
17,305 buses from 190 operators were seen on this date, across 3,166,557 position reports.
135,572 bus journeys were followed to their destination on this date. 95,307 arrived on time, 6,851 late, and 33,414 — 25% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.2 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 135,572 | |
|---|---|---|
| On time | 95,307 | 70.3% |
| Early | 33,414 | 24.6% |
| Late | 6,851 | 5.1% |
| …more than 20 minutes late | 727 | 0.5% |
| Average arrival | 0.2 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 105,100 | 72% | 25% |
Go North East GNEL | 2,147 | 76% | 9% |
First South Yorkshire FSYO | 2,054 | 56% | 25% |
First Leeds FLDS | 1,696 | 56% | 33% |
First Bristol, Bath & the West FBRI | 932 | 65% | 25% |
Bee Network BNSM | 929 | 79% | 16% |
First Potteries FPOT | 868 | 57% | 34% |
Arriva Yorkshire WRAY | 846 | 58% | 30% |
National Express West Midlands TNXB | 843 | 82% | 12% |
National Express NATX | 827 | 33% | 34% |
First Leicester FLEI | 766 | 57% | 40% |
Preston Bus PBLT | 720 | 62% | 32% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (88%), and National Express furthest from it (33%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 21 Sept 2026 itself. How these figures are measured · Sources and licences