TransitRadar

Sunday, 20 September 2026

90% of the 12,470 passenger trains whose arrival was recorded on Sunday, 20 September 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.

Of 17,288 recorded runs, 273 did not run at all. Among those whose arrival reached the archive, 11,172 were within five minutes, 1,179 between five and thirty minutes down, and 119 more than half an hour — the tail that people actually remember.

“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 298 services.

Tyne and Wear Metro came closest to running to time, 100.0% of its 122 recorded arrivals; CrossCountry had the largest cancelled share at 8.5%.

A weekend timetable, so the 17,288 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.

The day in numbers

Passenger trains recorded17,288
Cancelled2731.6%
Arrival time recorded12,47073.3% of those that ran
…arrived within 5 minutes11,17289.6%
…arrived 5 to 30 minutes late1,1799.5%
…arrived more than 30 minutes late1191.0%
Average delay at destination1.4 min

Every percentage among the bands is of the 12,470 trains whose arrival reached the archive — not of all 17,288, and the bands are exclusive. 4,545 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

38 operators ran passenger services on this date, from ScotRail on 1,695 runs down to North Yorkshire Moors Railway on 2. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR1,6951%1,114 94% 93% 0.5 min
Southern SN1,4641%1,076 87% 87% 1.6 min
Northern NT1,4531%1,197 92% 91% 0.5 min
London Overground LO1,3442%1,139 98% 95% -0.3 min
Great Western Railway GW1,2113%766 74% 71% 5.7 min
South Western Railway SW1,1755%686 84% 78% 3.3 min
Southeastern SE1,1540%918 91% 91% 1 min
Greater Anglia LE9810%860 93% 93% 0.4 min
Transport for Wales AW8183%647 90% 87% 0.5 min
West Midlands Railway LM7981%591 88% 87% 1.5 min
Thameslink TL6571%452 89% 88% 1.2 min
London Underground LT5670%239 97% 97% 0.7 min
Elizabeth line XR5061%500 98% 97% -1.1 min
TransPennine Express TP4591%258 88% 87% 0.7 min
East Midlands Railway EM3880%239 71% 70% 4.8 min
CrossCountry XC3558%142 53% 44% 15.1 min
Avanti West Coast VT3401%177 68% 67% 5.2 min
Merseyrail ME3104%297 97% 94% 0.6 min
London North Eastern Railway GR2530%147 88% 88% -1.7 min
Great Northern GN2412%220 89% 88% 1.1 min
Chiltern Railways CH2213%153 98% 94% 0.2 min
c2c CC2171%147 88% 87% 1.7 min
Heathrow Express HX1512%146 90% 89% 1 min
Island Line IL1310%0 — — —
Tyne and Wear Metro TW1270%122 100% 100% 0.3 min
Gatwick Express GX720%70 90% 90% 0.9 min
Eurostar ES520%50 88% 88% 4.1 min
Sheffield Supertram SJ510%51 100% 100% -0.1 min
West Coast Railway Co WR220%11 73% 73% 0.4 min
Grand Central GC180%18 94% 94% 0.6 min
Hull Trains HT120%12 92% 92% 1.5 min
Charter/Other ZZ110%0 — — —
Lumo LD100%10 90% 90% 1.5 min
Caledonian Sleeper CS714%6 83% 71% -8.5 min
TY TY60%0 — — —
Lumo Stirling LF50%5 80% 80% 2 min
LS LS40%2 0% 0% 13 min
North Yorkshire Moors Railway NY20%2 100% 100% 3 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 90% and 88% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

298 services

This service has been delayed by a speed restriction

210 services

This service has been delayed by a fault with the signalling system

110 services

This service has been delayed by congestion

86 services

This service has been delayed by a speed restriction over defective track

82 services

This service has been delayed by train crew being delayed

57 services

This service has been delayed by the train departing late to maintain customer connections

56 services

This service has been delayed by urgent repairs to the railway

51 services

Why trains were cancelled

A reason reached the archive for 145 of the 273 cancellations (53.1%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a shortage of train drivers

33 services

This service has been cancelled because of congestion

26 services

This service has been cancelled because of a points failure

19 services

This service has been cancelled because of a shortage of train crew

18 services

This service has been cancelled because of a member of train crew being unavailable

13 services

This service has been cancelled because of a late running train being in front of this one

13 services

This service has been cancelled because of the emergency services dealing with an incident

12 services

This service has been cancelled because of trespassers on the railway

11 services

The longest delays

The worst of them arrived 2h 45m behind schedule — Swansea to London Paddington, booked away at 11:43, run by Great Western Railway. The ten longest range from 2h 45m down to 1h 32m, and they belong to 4 operators, Great Western Railway accounting for 4. What a delay on that scale usually means.

BookedServiceLate by
11:43Swansea to London Paddington 1L60 · GW2h 45m
14:25Reading to Didcot Parkway 2N42 · GW2h 33m
13:40Bournemouth to Manchester Piccadilly 1M54 · XC2h 27m
11:27Worcester Park to Guildford 2G25 · SW2h 17m
14:00Cheltenham Spa to Swindon 2B09 · GW2h 07m
12:25Manchester Piccadilly to Bournemouth 1O18 · XC1h 55m
15:40Weymouth to London Waterloo 1W60 · SW1h 48m
14:00Bristol Temple Meads to London Paddington 1A20 · GW1h 35m
14:40Bournemouth to Manchester Piccadilly 1M58 · XC1h 34m
16:50Swansea to Pembroke Dock 2E22 · AW1h 32m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 06:00, when 47% of 246 arrived within five minutes.

00 143
01 46
02 26
03 18
04 47
05 98
06 246
07 521
08 907
09 1,117
10 1,153
11 1,133
12 1,135
13 1,149
14 1,142
15 1,146
16 1,157
17 1,135
18 1,124
19 1,040
20 983
21 857
22 636
23 329

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 03:00 with 18.

What ran

Formations were recorded for 14,741 trains on this date, made up of 2,174 individual units and 9,616 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 1,717 of the day's recorded trains from a pool of 149 units.

The average train was 5.8 vehicles long. The longest formation recorded was 16 vehicles.

ClassTrainsUnits used
Class 3771,717149
Class 34591556
Class 158899121
Class 72087189
Class 38783666
Class 46575259
Class 15073465
Class 70063481
Class 15657967
Class 17056479
Class 37556068
Class 16555558

Of 17,288 runs, 14,741 had a formation published (85%) — these are allocations rather than observations.

Buses

11,038 buses from 122 operators were seen on this date, across 2,008,299 position reports.

95,686 bus journeys were followed to their destination on this date. 62,489 arrived on time, 7,599 late, and 25,598 — 27% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

The average arrival was 0.1 minutes late, and 594 journeys finished more than twenty minutes down.

Journeys followed to destination95,686
On time62,48965.3%
Early25,59826.8%
Late7,5997.9%
…more than 20 minutes late5940.6%
Average arrival0.1 min late

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO79,07966%28%
Go North East GNEL1,25767%10%
First Leeds FLDS1,21257%27%
First South Yorkshire FSYO1,09759%24%
First Bristol, Bath & the West FBRI1,00659%20%
National Express NATX90532%38%
Bee Network BNSM56980%15%
Bee Network BNML56575%17%
National Express West Midlands TNXB50175%14%
Arriva Yorkshire WRAY43559%28%
Preston Bus PBLT40671%22%
Brighton & Hove Bus and Coach Company BHBC33984%11%

Of the operators with enough journeys to compare, Fastrack (operated by Go Ahead) ran closest to time (85%), and National Express furthest from it (32%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 20 Sept 2026 itself. How these figures are measured · Sources and licences