Saturday, 7 November 2026
Saturday, 7 November 2026 was a poor day on the railway: of the 17,292 passenger trains whose arrival was recorded, 86% were within five minutes, and a further 839 were cancelled outright.
A weekend timetable, so the 24,534 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.
2,248 trains arrived more than five minutes late and 111 more than half an hour, against 14,933 that ran to time. The average delay across every train whose arrival was recorded was 1.8 minutes.
The reason attached most often to a late train was “This service has been delayed by a late running train being in front of this one” — 884 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.
The busiest hour was 16:00, with 1,461 booked departures and an average delay of 2.1 minutes.
Buses on this date: 126,860 journeys followed to their destination, 69.7% on time.
The day in numbers
| Passenger trains recorded | 24,534 | |
|---|---|---|
| Cancelled | 839 | 3.4% |
| Arrival time recorded | 17,292 | 73.0% of those that ran |
| …arrived within 5 minutes | 14,933 | 86.4% |
| …arrived 5 to 30 minutes late | 2,248 | 13.0% |
| …arrived more than 30 minutes late | 111 | 0.6% |
| Average delay at destination | 1.8 min |
Every percentage among the bands is of the 17,292 trains whose arrival reached the archive — not of all 24,534, and the bands are exclusive. 6,403 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 2,889 runs down to Caledonian Sleeper on 4. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 2,889 | 1% | 1,912 | 89% | 88% | 1.9 min |
Northern NT | 2,810 | 9% | 2,079 | 82% | 73% | 2.3 min |
Great Western Railway GW | 2,042 | 5% | 1,307 | 87% | 81% | 1.6 min |
South Western Railway SW | 1,935 | 2% | 1,280 | 73% | 71% | 4.3 min |
Southern SN | 1,785 | 1% | 1,279 | 91% | 91% | 0.9 min |
Southeastern SE | 1,445 | 0% | 1,261 | 91% | 90% | 1 min |
London Overground LO | 1,413 | 1% | 1,162 | 96% | 95% | 0.4 min |
Transport for Wales AW | 1,260 | 2% | 906 | 84% | 82% | 1.9 min |
Greater Anglia LE | 1,232 | 0% | 1,070 | 96% | 96% | 0.1 min |
West Midlands Railway LM | 1,170 | 2% | 917 | 88% | 85% | 1.6 min |
Thameslink TL | 880 | 4% | 488 | 93% | 87% | 0.4 min |
East Midlands Railway EM | 756 | 1% | 468 | 76% | 75% | 3.3 min |
London Underground LT | 669 | 1% | 268 | 84% | 81% | 3.4 min |
Elizabeth line XR | 664 | 25% | 417 | 99% | 71% | -1.4 min |
Merseyrail ME | 624 | 9% | 466 | 93% | 83% | 0.8 min |
TransPennine Express TP | 376 | 1% | 314 | 72% | 71% | 3.9 min |
Great Northern GN | 342 | 4% | 250 | 77% | 74% | 3.3 min |
c2c CC | 332 | 2% | 191 | 98% | 94% | -0.1 min |
CrossCountry XC | 325 | 6% | 214 | 59% | 54% | 7.5 min |
London North Eastern Railway GR | 295 | 0% | 176 | 72% | 72% | 3.1 min |
Avanti West Coast VT | 294 | 0% | 188 | 48% | 48% | 7.7 min |
Chiltern Railways CH | 223 | 4% | 191 | 93% | 89% | 0.6 min |
Tyne and Wear Metro TW | 166 | 0% | 132 | 95% | 95% | 2.1 min |
Heathrow Express HX | 152 | 0% | 129 | 98% | 98% | 0.2 min |
Island Line IL | 118 | 0% | 0 | — | — | — |
Sheffield Supertram SJ | 99 | 0% | 57 | 82% | 82% | 2.7 min |
Gatwick Express GX | 72 | 0% | 63 | 86% | 86% | 2.4 min |
Eurostar ES | 45 | 0% | 35 | 66% | 66% | 6.8 min |
Charter/Other ZZ | 23 | 0% | 5 | 80% | 80% | 4.6 min |
Grand Central GC | 20 | 0% | 20 | 40% | 40% | 9.2 min |
West Coast Railway Co WR | 18 | 0% | 5 | 60% | 60% | 4 min |
Hull Trains HT | 14 | 0% | 13 | 77% | 77% | 0.9 min |
Lumo LD | 12 | 0% | 12 | 58% | 58% | 5.2 min |
LS LS | 11 | 0% | 8 | 13% | 13% | 22.8 min |
TY TY | 10 | 0% | 0 | — | — | — |
Lumo Stirling LF | 9 | 0% | 8 | 100% | 100% | 1.1 min |
Caledonian Sleeper CS | 4 | 0% | 1 | 100% | 100% | -2 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 86% and 82% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
884 services
This service has been delayed by a speed restriction
476 services
This service has been delayed by congestion
306 services
This service has been delayed by a fault with the signalling system
238 services
This service has been delayed by a speed restriction over defective track
206 services
This service has been delayed by a problem currently under investigation
151 services
This service has been delayed by the train departing late to maintain customer connections
122 services
This service has been delayed by damage to the overhead electric wires
117 services
Why trains were cancelled
A reason reached the archive for 570 of the 839 cancellations (67.9%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of forecasted slippery rails
215 services
This service has been cancelled because of a problem with platform equipment
162 services
This service has been cancelled because of damage to the overhead electric wires
71 services
This service has been cancelled because of a fault on this train
40 services
This service has been cancelled because of a shortage of train crew
27 services
This service has been cancelled because of overcrowding because of a sporting event
20 services
This service has been cancelled because of train crew being delayed
18 services
This service has been cancelled because of more trains than usual needing repairs at the same time
17 services
The longest delays
The worst of them arrived 2h 51m behind schedule — Edinburgh to Dundee, booked away at 15:59, run by ScotRail. The ten longest range from 2h 51m down to 1h 13m, and they belong to 7 operators, South Western Railway accounting for 3. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
15:59 | Edinburgh to Dundee 1L21 · SR | 2h 51m |
06:37 | Newcastle Airport to South Hylton (T & W Metro) 2I10 · TW | 2h 35m |
18:48 | Basingstoke to Weymouth 1W77 · SW | 1h 44m |
20:36 | London Waterloo to Weymouth 1W83 · SW | 1h 44m |
22:14 | Great Yarmouth to Norwich 2P67 · LE | 1h 27m |
17:36 | London Waterloo to Weymouth 1W35 · SW | 1h 25m |
22:26 | Leeds to Hull 1K37 · TP | 1h 25m |
22:01 | Sheringham to Norwich 2S33 · LE | 1h 22m |
23:45 | London Charing Cross to Hastings 1H30 · SE | 1h 22m |
18:45 | Bournemouth to Manchester Piccadilly 1M74 · XC | 1h 13m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 07:00, when 11% of 1,396 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 20.
What ran
Formations were recorded for 24,231 trains on this date, made up of 2,608 individual units and 11,434 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 2,483 of the day's recorded trains from a pool of 173 units.
The average train was 5.5 vehicles long. The longest formation recorded was 26 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 2,483 | 173 |
| Class 158 | 1,351 | 127 |
| Class 387 | 1,264 | 84 |
| Class 150 | 1,254 | 85 |
| Class 720 | 1,175 | 92 |
| Class 345 | 1,167 | 63 |
| Class 156 | 1,129 | 88 |
| Class 465 | 1,089 | 80 |
| Class 385 | 1,062 | 66 |
| Class 450 | 1,023 | 93 |
| Class 165 | 977 | 60 |
| Class 170 | 965 | 99 |
Of 24,534 runs, 24,231 had a formation published (99%) — these are allocations rather than observations.
Buses
15,643 buses from 149 operators were seen on this date, across 2,795,492 position reports.
126,860 bus journeys were followed to their destination on this date. 88,454 arrived on time, 7,183 late, and 31,223 — 25% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.1 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 126,860 | |
|---|---|---|
| On time | 88,454 | 69.7% |
| Early | 31,223 | 24.6% |
| Late | 7,183 | 5.7% |
| …more than 15 minutes late | 624 | 0.5% |
| Average arrival | 0.1 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 97,607 | 72% | 25% |
Nottingham City Transport NCTR | 2,124 | 75% | 18% |
Go North East GNEL | 1,946 | 75% | 11% |
First South Yorkshire FSYO | 1,579 | 60% | 26% |
First Leeds FLDS | 1,441 | 59% | 27% |
First Bristol, Bath & the West FBRI | 1,422 | 58% | 25% |
National Express NATX | 902 | 34% | 37% |
Bee Network BNSM | 843 | 78% | 19% |
Arriva Yorkshire WRAY | 773 | 58% | 33% |
Bee Network BNML | 742 | 76% | 18% |
First Potteries FPOT | 702 | 56% | 34% |
First Leicester FLEI | 601 | 54% | 38% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (87%), and National Express furthest from it (34%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 7 Nov 2026 itself. How these figures are measured · Sources and licences