87% of the 21,680 passenger trains whose arrival was recorded on Friday, 6 November 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.

Of 26,104 recorded runs, 520 did not run at all. Among those whose arrival reached the archive, 18,909 were within five minutes, 2,672 between five and thirty minutes down, and 99 more than half an hour — the tail that people actually remember.

“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 282 services.

Heathrow Express came closest to running to time, 98.7% of its 152 recorded arrivals; Northern had the largest cancelled share at 9.8%.

Friday carries the heaviest long-distance loading of the week, and it is the day on which a late-afternoon problem has the fewest spare paths to recover into.

Buses on this date: 131,323 journeys followed to their destination, 71.0% on time.

The day in numbers

Passenger trains recorded26,104
Cancelled5202.0%
Arrival time recorded21,68084.7% of those that ran
…arrived within 5 minutes18,90987.2%
…arrived 5 to 30 minutes late2,67212.3%
…arrived more than 30 minutes late990.5%
Average delay at destination2.3 min

Every percentage among the bands is of the 21,680 trains whose arrival reached the archive — not of all 26,104, and the bands are exclusive. 3,904 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

37 operators ran passenger services on this date, from ScotRail on 3,028 runs down to TY on 4. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0280%2,229 90% 90% 2.1 min
Northern NT2,81310%2,431 83% 75% 2.8 min
Great Western Railway GW2,2194%1,587 82% 79% 2.8 min
South Western Railway SW1,8280%1,582 89% 88% 2 min
Southeastern SE1,8040%1,794 94% 94% 1.3 min
Southern SN1,6900%1,646 89% 89% 1.9 min
London Overground LO1,5371%1,488 95% 94% 1 min
West Midlands Railway LM1,3231%1,277 86% 85% 2.4 min
Greater Anglia LE1,3070%1,292 93% 93% 1.4 min
Transport for Wales AW1,2434%1,006 85% 81% 2.9 min
Thameslink TL9751%624 91% 89% 1.8 min
Merseyrail ME8330%632 96% 96% 1.2 min
London Underground LT7800%294 89% 89% 2.1 min
Elizabeth line XR6950%693 97% 96% 0.6 min
East Midlands Railway EM6320%500 78% 78% 3.6 min
Great Northern GN4301%389 81% 80% 2.8 min
Avanti West Coast VT4140%311 58% 58% 6.3 min
c2c CC3922%251 89% 86% 2.3 min
CrossCountry XC3533%266 52% 50% 8.4 min
Chiltern Railways CH3451%341 94% 94% 1.4 min
TransPennine Express TP3252%307 60% 59% 7.3 min
London North Eastern Railway GR3150%191 51% 51% 8.6 min
Tyne and Wear Metro TW1740%154 97% 97% 0.9 min
Heathrow Express HX1520%152 99% 99% 0.8 min
Island Line IL1380%0 — — —
Sheffield Supertram SJ980%69 96% 96% 1.3 min
Gatwick Express GX721%49 78% 76% 3.6 min
Eurostar ES550%52 77% 77% 4.2 min
Charter/Other ZZ500%9 78% 78% 2.9 min
Grand Central GC2417%20 30% 25% 10.8 min
Hull Trains HT140%14 29% 29% 10.9 min
Lumo LD110%11 64% 64% 7.7 min
Lumo Stirling LF100%10 70% 70% 5.1 min
Caledonian Sleeper CS100%8 88% 88% -5.8 min
LS LS70%0 — — —
West Coast Railway Co WR40%1 100% 100% -96 min
TY TY40%0 — — —

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 87% and 85% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

282 services

This service has been delayed by a speed restriction

221 services

This service has been delayed by a speed restriction over defective track

101 services

This service has been delayed by a fault with the signalling system

92 services

This service has been delayed by congestion

73 services

This service has been delayed by slippery rails

65 services

This service has been delayed by a late running freight train

64 services

This service has been delayed by a problem currently under investigation

51 services

Why trains were cancelled

A reason reached the archive for 403 of the 520 cancellations (77.5%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of forecasted slippery rails

260 services

This service has been cancelled because of damage to the overhead electric wires

72 services

This service has been cancelled because of a fault with the signalling system

17 services

This service has been cancelled because of a shortage of train crew

15 services

This service has been cancelled because of a safety inspection of the track

13 services

This service has been cancelled because of a shortage of train drivers

9 services

This service has been cancelled because of a late running train being in front of this one

9 services

This service has been cancelled because of more trains than usual needing repairs at the same time

8 services

The longest delays

The worst of them arrived 1h 34m behind schedule — Hereford to Cardiff Central, booked away at 05:30, run by Transport for Wales. The ten longest range from 1h 34m down to 1h 01m, and they belong to 7 operators, Transport for Wales accounting for 3. What a delay on that scale usually means.

BookedServiceLate by
05:30Hereford to Cardiff Central 2B07 · AW1h 34m
07:58Redcar Central to Manchester Airport 1P64 · TP1h 27m
10:50Penzance to Exeter St Davids 2E11 · GW1h 21m
06:01Carmarthen to Manchester Piccadilly 1W14 · AW1h 14m
06:44Manchester Airport to Redcar Central 1P63 · TP1h 14m
05:36Exeter St Davids to London Waterloo 1L24 · SW1h 09m
16:25Holyhead to Cardiff Central 1V98 · AW1h 05m
06:23Newcastle to Reading 1V83 · XC1h 03m
17:30Watford Junction to London Euston 2C49 · LO1h 01m
13:30London Kings Cross to Edinburgh 1S18 · GR1h 01m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 60% of 157 arrived within five minutes.

00 134
01 33
02 11
03 25
04 157
05 921
06 1,621
07 1,665
08 1,552
09 1,445
10 1,427
11 1,409
12 1,403
13 1,415
14 1,418
15 1,466
16 1,561
17 1,617
18 1,527
19 1,359
20 1,221
21 1,132
22 983
23 602

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 11.

What ran

Formations were recorded for 26,989 trains on this date, made up of 2,886 individual units and 12,713 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,255 of the day's recorded trains from a pool of 220 units.

The average train was 5.5 vehicles long. The longest formation recorded was 26 vehicles.

ClassTrainsUnits used
Class 3773,255220
Class 4651,601101
Class 7201,482125
Class 1581,422133
Class 1501,31889
Class 4501,311119
Class 3871,30788
Class 3451,25369
Class 1651,21062
Class 1561,12993
Class 7001,026106
Class 38599366

Of 26,104 runs, 26,989 had a formation published (103%) — these are allocations rather than observations.

Buses

17,904 buses from 187 operators were seen on this date, across 3,185,678 position reports.

131,323 bus journeys were followed to their destination on this date. 93,269 arrived on time, 7,447 late, and 30,607 — 23% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.1 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination131,323
On time93,26971.0%
Early30,60723.3%
Late7,4475.7%
…more than 15 minutes late7780.6%
Average arrival0.1 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO105,17273%24%
Nottingham City Transport NCTR2,35273%17%
Go North East GNEL1,85573%11%
West Midlands Bus WMBL95174%17%
Bee Network BNSM91279%17%
Arriva Yorkshire WRAY90154%30%
National Express NATX89534%32%
First Potteries FPOT79554%29%
Bee Network BNML78971%18%
Preston Bus PBLT71763%30%
trentbarton TBTN54359%29%
Brighton & Hove Bus and Coach Company BHBC52883%10%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (91%), and National Express furthest from it (34%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 6 Nov 2026 itself. How these figures are measured · Sources and licences