TransitRadar

Friday, 4 September 2026

86% of the 21,862 passenger trains whose arrival was recorded on Friday, 4 September 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.

Of 26,211 recorded runs, 603 did not run at all. Among those whose arrival reached the archive, 18,711 were within five minutes, 2,852 between five and thirty minutes down, and 299 more than half an hour — the tail that people actually remember.

“This service has been delayed by a speed restriction” was the most common explanation, given for 622 services.

Tyne and Wear Metro came closest to running to time, 97.1% of its 174 recorded arrivals; Great Northern had the largest cancelled share at 13.0%.

Friday carries the heaviest long-distance loading of the week, and it is the day on which a late-afternoon problem has the fewest spare paths to recover into.

The day in numbers

Passenger trains recorded26,211
Cancelled6032.3%
Arrival time recorded21,86285.4% of those that ran
…arrived within 5 minutes18,71185.6%
…arrived 5 to 30 minutes late2,85213.0%
…arrived more than 30 minutes late2991.4%
Average delay at destination2.2 min

Every percentage among the bands is of the 21,862 trains whose arrival reached the archive — not of all 26,211, and the bands are exclusive. 3,746 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

38 operators ran passenger services on this date, from ScotRail on 3,144 runs down to TY on 4. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,1440%2,256 95% 95% 0.6 min
Northern NT2,8362%2,649 87% 85% 1.9 min
Great Western Railway GW2,1841%1,702 83% 82% 2.3 min
South Western Railway SW1,9111%1,586 94% 93% 0.7 min
Southeastern SE1,8154%1,693 73% 70% 5.4 min
Southern SN1,6234%1,473 81% 77% 2.8 min
London Overground LO1,6102%1,570 95% 93% 0.1 min
West Midlands Railway LM1,3241%1,287 90% 89% 1.2 min
Greater Anglia LE1,3151%1,296 88% 87% 1.4 min
Transport for Wales AW1,2542%1,047 91% 90% 0.5 min
Thameslink TL9845%575 79% 73% 4.2 min
London Underground LT7880%366 92% 92% 1.4 min
Elizabeth line XR6963%676 96% 93% -0.7 min
East Midlands Railway EM6231%470 73% 72% 4.3 min
Merseyrail ME6160%605 93% 92% 0.6 min
c2c CC4724%345 72% 68% 4.3 min
Great Northern GN47013%246 70% 56% 5 min
Avanti West Coast VT4241%310 49% 49% 8.2 min
Chiltern Railways CH36210%326 94% 84% 0.5 min
CrossCountry XC3481%277 62% 61% 7 min
TransPennine Express TP3325%304 74% 71% 4 min
London North Eastern Railway GR3171%182 34% 33% 23.9 min
Tyne and Wear Metro TW1740%174 97% 97% 0.4 min
Heathrow Express HX1520%150 95% 95% 0.6 min
Sheffield Supertram SJ980%74 99% 99% 0.1 min
Gatwick Express GX720%72 60% 60% 6 min
Charter/Other ZZ530%13 77% 77% 8.6 min
Island Line IL5294%2 50% 2% 3.5 min
Eurostar ES520%52 83% 83% 5.7 min
Grand Central GC2417%20 25% 21% 22.8 min
West Coast Railway Co WR160%11 82% 82% -2.3 min
LS LS130%6 67% 67% 6.3 min
Hull Trains HT130%13 23% 23% 27.2 min
Lumo LD128%11 18% 17% 52 min
Lumo Stirling LF1040%5 60% 33% 3.4 min
Caledonian Sleeper CS100%10 100% 100% -12.9 min
North Yorkshire Moors Railway NY80%8 88% 88% -20.9 min
TY TY40%0 — — —

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 86% and 83% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a speed restriction

622 services

This service has been delayed by a late running train being in front of this one

603 services

This service has been delayed by congestion

272 services

This service has been delayed by a speed restriction over defective track

248 services

This service has been delayed by a fault with the signalling system

200 services

This service has been delayed by a safety inspection of the track

196 services

This service has been delayed by an object being caught on the overhead electric wires earlier today

140 services

This service has been delayed by a fire next to the track earlier today

126 services

Why trains were cancelled

A reason reached the archive for 268 of the 603 cancellations (44.4%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a fault with the radio system between the driver and the signaller

44 services

This service has been cancelled because of a speed restriction over defective track

43 services

This service has been cancelled because of a shortage of train crew

39 services

This service has been cancelled because of trespassers on the railway earlier today

38 services

This service has been cancelled because of a person being hit by a train

28 services

This service has been cancelled because of a speed restriction

26 services

This service has been cancelled because of a late running train being in front of this one

26 services

This service has been cancelled because of a fault on this train

24 services

The longest delays

The worst of them arrived 3h 35m behind schedule — Peterborough to Horsham, booked away at 07:23, run by Thameslink. The ten longest range from 3h 35m down to 1h 37m, and they belong to 6 operators, London North Eastern Railway accounting for 3. What a delay on that scale usually means.

BookedServiceLate by
07:23Peterborough to Horsham 9J13 · TL3h 35m
07:42Paris Nord to London St Pancras (Intl) 9O09 · ES2h 48m
15:26Edinburgh to London Kings Cross 1E86 · LD2h 19m
10:03London Kings Cross to Aberdeen 1S11 · GR2h 13m
15:31Barnham to Portsmouth Harbour 1Z44 · SN2h 04m
11:30London Kings Cross to Edinburgh 1S14 · GR1h 54m
16:42Leeds to Chester 1D71 · NT1h 50m
10:15London Kings Cross to Edinburgh 1S93 · LD1h 48m
07:00Edinburgh to London Kings Cross 1E04 · GR1h 37m
15:26Chester to Leeds 1E68 · NT1h 37m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 61% of 116 arrived within five minutes.

00 116
01 38
02 13
03 25
04 155
05 935
06 1,617
07 1,670
08 1,556
09 1,455
10 1,419
11 1,405
12 1,404
13 1,401
14 1,426
15 1,463
16 1,567
17 1,624
18 1,529
19 1,353
20 1,224
21 1,131
22 1,007
23 678

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 13.

What ran

Formations were recorded for 24,729 trains on this date, made up of 2,783 individual units and 12,240 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,021 of the day's recorded trains from a pool of 217 units.

The average train was 5.6 vehicles long. The longest formation recorded was 15 vehicles.

ClassTrainsUnits used
Class 3773,021217
Class 4651,55897
Class 7201,422120
Class 4501,359110
Class 3871,33492
Class 1581,288135
Class 3451,25468
Class 1501,20688
Class 1651,19863
Class 37593398
Class 38591364
Class 700884101

Of 26,211 runs, 24,729 had a formation published (94%) — these are allocations rather than observations.

Buses

17,175 buses from 183 operators were seen on this date, across 3,157,420 position reports.

134,386 bus journeys were followed to their destination on this date. 94,148 arrived on time, 7,393 late, and 32,845 — 24% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.2 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination134,386
On time94,14870.1%
Early32,84524.4%
Late7,3935.5%
…more than 20 minutes late7010.5%
Average arrival0.2 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO103,30972%25%
Go North East GNEL2,09077%11%
Nottingham City Transport NCTR1,60677%17%
First South Yorkshire FSYO1,46461%26%
First Bristol, Bath & the West FBRI1,32461%28%
Bee Network BNML1,11772%19%
First Leeds FLDS96559%27%
Bee Network BNSM95477%18%
National Express NATX90833%34%
Arriva Yorkshire WRAY86958%31%
First Potteries FPOT81854%33%
National Express West Midlands TNXB75677%15%

Of the operators with enough journeys to compare, Reading Buses ran closest to time (92%), and National Express furthest from it (33%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 4 Sept 2026 itself. How these figures are measured · Sources and licences