Thursday, 13 August 2026
26,210 passenger trains were recorded on Thursday, 13 August 2026 and 1,050 of them were cancelled. Arrival times were not captured for most of this day, so it is a record of what ran rather than of how punctual it was.
26,210 passenger services were recorded as having been scheduled and settled on this date. Arrival times reached the archive for only 1,003 of them, so nothing is claimed here about how late the rest were — the figures below cover what ran and what did not.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
1,050 services were cancelled, 4.0% of everything booked. The reason given most often was “This service has been cancelled because of forecasted severe weather”, on 448 of them. Cancellation reasons are close to complete even on days like this, and they are the operators' own wording, reproduced unedited.
Chiltern Railways lost the largest share of its own timetable, 14.8% of 351 booked runs.
The day in numbers
| Passenger trains recorded | 26,210 | |
|---|---|---|
| Cancelled | 1,050 | 4.0% |
| Arrival time recorded | 1,003 | 4.0% of those that ran |
Every percentage among the bands is of the 1,003 trains whose arrival reached the archive — not of all 26,210, and the bands are exclusive. 24,157 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from ScotRail on 3,073 runs down to TY on 4. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||
|---|---|---|
ScotRail SR | 3,073 | 0% |
Northern NT | 2,985 | 8% |
Great Western Railway GW | 2,169 | 5% |
South Western Railway SW | 1,884 | 2% |
Southern SN | 1,670 | 1% |
Southeastern SE | 1,648 | 0% |
London Overground LO | 1,594 | 7% |
Transport for Wales AW | 1,505 | 4% |
West Midlands Railway LM | 1,328 | 11% |
Greater Anglia LE | 1,303 | 2% |
Thameslink TL | 947 | 5% |
London Underground LT | 771 | 0% |
Elizabeth line XR | 698 | 3% |
East Midlands Railway EM | 626 | 15% |
Merseyrail ME | 609 | 0% |
Great Northern GN | 431 | 1% |
c2c CC | 422 | 5% |
Avanti West Coast VT | 380 | 3% |
CrossCountry XC | 352 | 13% |
Chiltern Railways CH | 351 | 15% |
TransPennine Express TP | 334 | 1% |
London North Eastern Railway GR | 324 | 2% |
Tyne and Wear Metro TW | 173 | 0% |
Heathrow Express HX | 152 | 0% |
Sheffield Supertram SJ | 97 | 0% |
Gatwick Express GX | 72 | 1% |
Charter/Other ZZ | 54 | 0% |
Island Line IL | 52 | 0% |
Eurostar ES | 48 | 0% |
West Coast Railway Co WR | 35 | 0% |
Grand Central GC | 20 | 0% |
Hull Trains HT | 14 | 0% |
Lumo LD | 12 | 0% |
LS LS | 10 | 0% |
Lumo Stirling LF | 10 | 0% |
Caledonian Sleeper CS | 10 | 20% |
North Yorkshire Moors Railway NY | 8 | 0% |
TY TY | 4 | 0% |
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by damage to the overhead electric wires
35 services
This service has been delayed by a points failure
25 services
This service has been delayed by a late running train being in front of this one
24 services
This service has been delayed by a broken down train
15 services
This service has been delayed by a fault with the signalling system
13 services
This service has been delayed by a fault on a train earlier
12 services
This service has been delayed by train crew being delayed
9 services
This service has been delayed by a safety inspection of the track earlier today
9 services
Why trains were cancelled
A reason reached the archive for 916 of the 1,050 cancellations (87.2%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of forecasted severe weather
448 services
This service has been cancelled because of severe weather
226 services
This service has been cancelled because of a shortage of train drivers
107 services
This service has been cancelled because of damage to the overhead electric wires
51 services
This service has been cancelled because of a fault with the signalling system
36 services
This service has been cancelled because of a speed restriction because of severe weather
20 services
This service has been cancelled because of a speed restriction over defective track
16 services
This service has been cancelled because of a fault on a train
12 services
The longest delays
The worst of them arrived 2h 46m behind schedule — London Euston to London Euston, booked away at 22:47, run by an operator. The ten longest range from 2h 46m down to 1h 00m, and they belong to 7 operators, Avanti West Coast accounting for 3. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
22:47 | London Euston to London Euston · | 2h 46m |
18:30 | Manchester Piccadilly to Cardiff Central 1V62 · AW | 1h 33m |
14:04 | Edinburgh to Plymouth 1V66 · XC | 1h 15m |
19:58 | Exeter St Davids to London Waterloo 1L80 · SW | 1h 11m |
17:45 | Bournemouth to Manchester Piccadilly 1M70 · XC | 1h 06m |
21:06 | London Euston to Wolverhampton 9G46 · VT | 1h 05m |
22:23 | London Victoria to Tunbridge Wells 2Z34 · SE | 1h 02m |
17:30 | Glasgow Central to London Euston 1M18 · VT | 1h 00m |
17:39 | London Euston to Glasgow Central 9S97 · VT | 1h 00m |
20:03 | London Paddington to Plymouth 1C96 · GW | 1h 00m |
Through the day
Booked departures by hour.
The quietest was 02:00 with 10.
Buses
16,585 buses from 164 operators were seen on this date, across 3,000,080 position reports.
Bus punctuality was not yet being archived on this date, so only vehicle activity is shown. Nothing before that can be recovered.
Recorded live from the Darwin and TRUST feeds on 13 Aug 2026 itself. How these figures are measured · Sources and licences