Wednesday, 12 August 2026
26,468 passenger trains were recorded on Wednesday, 12 August 2026 and 251 of them were cancelled. Arrival times were not captured for most of this day, so it is a record of what ran rather than of how punctual it was.
26,468 passenger services were recorded as having been scheduled and settled on this date. Arrival times reached the archive for only 324 of them, so nothing is claimed here about how late the rest were — the figures below cover what ran and what did not.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
251 services were cancelled, 0.9% of everything booked. The reason given most often was “This service has been cancelled because of severe weather”, on 83 of them. Cancellation reasons are close to complete even on days like this, and they are the operators' own wording, reproduced unedited.
CrossCountry lost the largest share of its own timetable, 9.6% of 355 booked runs.
The day in numbers
| Passenger trains recorded | 26,468 | |
|---|---|---|
| Cancelled | 251 | 0.9% |
| Arrival time recorded | 324 | 1.2% of those that ran |
Every percentage among the bands is of the 324 trains whose arrival reached the archive — not of all 26,468, and the bands are exclusive. 25,893 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 3,098 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||
|---|---|---|
ScotRail SR | 3,098 | 0% |
Northern NT | 3,014 | 0% |
Great Western Railway GW | 2,195 | 0% |
South Western Railway SW | 1,898 | 1% |
Southern SN | 1,689 | 0% |
Southeastern SE | 1,661 | 0% |
London Overground LO | 1,609 | 2% |
Transport for Wales AW | 1,553 | 5% |
West Midlands Railway LM | 1,334 | 3% |
Greater Anglia LE | 1,309 | 0% |
Thameslink TL | 945 | 0% |
London Underground LT | 781 | 0% |
Elizabeth line XR | 694 | 0% |
Merseyrail ME | 622 | 0% |
East Midlands Railway EM | 618 | 5% |
Great Northern GN | 438 | 1% |
c2c CC | 422 | 0% |
Avanti West Coast VT | 386 | 1% |
CrossCountry XC | 355 | 10% |
Chiltern Railways CH | 353 | 0% |
TransPennine Express TP | 351 | 0% |
London North Eastern Railway GR | 320 | 0% |
Tyne and Wear Metro TW | 174 | 0% |
Heathrow Express HX | 152 | 0% |
Sheffield Supertram SJ | 98 | 0% |
Gatwick Express GX | 72 | 0% |
Charter/Other ZZ | 52 | 0% |
Island Line IL | 52 | 0% |
Eurostar ES | 48 | 0% |
West Coast Railway Co WR | 24 | 0% |
Grand Central GC | 20 | 0% |
Hull Trains HT | 14 | 0% |
LS LS | 12 | 0% |
Lumo LD | 12 | 0% |
Lumo Stirling LF | 10 | 0% |
Caledonian Sleeper CS | 10 | 30% |
North Yorkshire Moors Railway NY | 8 | 0% |
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by trespassers on the railway
10 services
This service has been delayed by a fault on a train earlier
9 services
This service has been delayed by a safety inspection of the track
8 services
This service has been delayed by congestion
5 services
This service has been delayed by a safety inspection of the track earlier today
5 services
This service has been delayed by a problem currently under investigation
5 services
This service has been delayed by a points failure
5 services
This service has been delayed by a late running train being in front of this one
5 services
Why trains were cancelled
A reason reached the archive for 238 of the 251 cancellations (94.8%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of severe weather
83 services
This service has been cancelled because of forecasted severe weather
61 services
This service has been cancelled because of a speed restriction because of high track temperatures
41 services
This service has been cancelled because of a shortage of train drivers
31 services
This service has been cancelled because of a points failure
13 services
This service has been cancelled because of a fault on this train
4 services
This service has been cancelled because of a shortage of train crew
3 services
This service has been cancelled because of trespassers on the railway
2 services
The longest delays
The worst of them arrived 1h 48m behind schedule — Rochdale to Leeds, booked away at 22:41, run by Northern. The ten longest range from 1h 48m down to 1h 16m, and they belong to 4 operators, Northern accounting for 7. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
22:41 | Rochdale to Leeds 2J33 · NT | 1h 48m |
23:05 | Rochdale to Leeds 1J34 · NT | 1h 42m |
22:02 | Blackpool North to Leeds 1B00 · NT | 1h 39m |
23:27 | Leeds to Halifax 2K37 · NT | 1h 31m |
19:30 | London Kings Cross to Edinburgh 1S31 · GR | 1h 26m |
22:58 | Leeds to Blackburn 1B49 · NT | 1h 21m |
12:53 | Darlington to Darlington · | 1h 17m |
16:35 | Scarborough to Paignton 1Z33 · LS | 1h 17m |
22:42 | Leeds to Rochdale 1J45 · NT | 1h 17m |
23:34 | Rochdale to Leeds 1E82 · NT | 1h 16m |
Through the day
Booked departures by hour.
The quietest was 02:00 with 12.
Buses
16,490 buses from 169 operators were seen on this date, across 3,053,399 position reports.
Bus punctuality was not yet being archived on this date, so only vehicle activity is shown. Nothing before that can be recovered.
Recorded live from the Darwin and TRUST feeds on 12 Aug 2026 itself. How these figures are measured · Sources and licences