TransitRadar

Wednesday, 12 August 2026

26,468 passenger trains were recorded on Wednesday, 12 August 2026 and 251 of them were cancelled. Arrival times were not captured for most of this day, so it is a record of what ran rather than of how punctual it was.

26,468 passenger services were recorded as having been scheduled and settled on this date. Arrival times reached the archive for only 324 of them, so nothing is claimed here about how late the rest were — the figures below cover what ran and what did not.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

251 services were cancelled, 0.9% of everything booked. The reason given most often was “This service has been cancelled because of severe weather”, on 83 of them. Cancellation reasons are close to complete even on days like this, and they are the operators' own wording, reproduced unedited.

CrossCountry lost the largest share of its own timetable, 9.6% of 355 booked runs.

The day in numbers

Passenger trains recorded26,468
Cancelled2510.9%
Arrival time recorded3241.2% of those that ran

Every percentage among the bands is of the 324 trains whose arrival reached the archive — not of all 26,468, and the bands are exclusive. 25,893 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

Punctuality is not reported for this date. Arrival times reached the archive for only 324 of the 26,217 trains that ran (1.2%), and a punctuality figure drawn from that would describe the sample rather than the railway. What ran, what was cancelled and why are recorded in full below.

By operator

37 operators ran passenger services on this date, from ScotRail on 3,098 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0980%
Northern NT3,0140%
Great Western Railway GW2,1950%
South Western Railway SW1,8981%
Southern SN1,6890%
Southeastern SE1,6610%
London Overground LO1,6092%
Transport for Wales AW1,5535%
West Midlands Railway LM1,3343%
Greater Anglia LE1,3090%
Thameslink TL9450%
London Underground LT7810%
Elizabeth line XR6940%
Merseyrail ME6220%
East Midlands Railway EM6185%
Great Northern GN4381%
c2c CC4220%
Avanti West Coast VT3861%
CrossCountry XC35510%
Chiltern Railways CH3530%
TransPennine Express TP3510%
London North Eastern Railway GR3200%
Tyne and Wear Metro TW1740%
Heathrow Express HX1520%
Sheffield Supertram SJ980%
Gatwick Express GX720%
Charter/Other ZZ520%
Island Line IL520%
Eurostar ES480%
West Coast Railway Co WR240%
Grand Central GC200%
Hull Trains HT140%
LS LS120%
Lumo LD120%
Lumo Stirling LF100%
Caledonian Sleeper CS1030%
North Yorkshire Moors Railway NY80%

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by trespassers on the railway

10 services

This service has been delayed by a fault on a train earlier

9 services

This service has been delayed by a safety inspection of the track

8 services

This service has been delayed by congestion

5 services

This service has been delayed by a safety inspection of the track earlier today

5 services

This service has been delayed by a problem currently under investigation

5 services

This service has been delayed by a points failure

5 services

This service has been delayed by a late running train being in front of this one

5 services

Why trains were cancelled

A reason reached the archive for 238 of the 251 cancellations (94.8%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of severe weather

83 services

This service has been cancelled because of forecasted severe weather

61 services

This service has been cancelled because of a speed restriction because of high track temperatures

41 services

This service has been cancelled because of a shortage of train drivers

31 services

This service has been cancelled because of a points failure

13 services

This service has been cancelled because of a fault on this train

4 services

This service has been cancelled because of a shortage of train crew

3 services

This service has been cancelled because of trespassers on the railway

2 services

The longest delays

The worst of them arrived 1h 48m behind schedule — Rochdale to Leeds, booked away at 22:41, run by Northern. The ten longest range from 1h 48m down to 1h 16m, and they belong to 4 operators, Northern accounting for 7. What a delay on that scale usually means.

BookedServiceLate by
22:41Rochdale to Leeds 2J33 · NT1h 48m
23:05Rochdale to Leeds 1J34 · NT1h 42m
22:02Blackpool North to Leeds 1B00 · NT1h 39m
23:27Leeds to Halifax 2K37 · NT1h 31m
19:30London Kings Cross to Edinburgh 1S31 · GR1h 26m
22:58Leeds to Blackburn 1B49 · NT1h 21m
12:53Darlington to Darlington · 1h 17m
16:35Scarborough to Paignton 1Z33 · LS1h 17m
22:42Leeds to Rochdale 1J45 · NT1h 17m
23:34Rochdale to Leeds 1E82 · NT1h 16m

Through the day

Booked departures by hour.

00 132
01 34
02 12
03 25
04 150
05 920
06 1,610
07 1,674
08 1,549
09 1,461
10 1,442
11 1,422
12 1,427
13 1,419
14 1,450
15 1,475
16 1,570
17 1,635
18 1,544
19 1,367
20 1,243
21 1,151
22 1,031
23 713

The quietest was 02:00 with 12.

Buses

16,490 buses from 169 operators were seen on this date, across 3,053,399 position reports.

Bus punctuality was not yet being archived on this date, so only vehicle activity is shown. Nothing before that can be recovered.

Recorded live from the Darwin and TRUST feeds on 12 Aug 2026 itself. How these figures are measured · Sources and licences