Monday, 14 September 2026
87% of the 19,480 passenger trains whose arrival was recorded on Monday, 14 September 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 25,083 recorded runs, 602 did not run at all. Among those whose arrival reached the archive, 17,007 were within five minutes, 2,328 between five and thirty minutes down, and 145 more than half an hour — the tail that people actually remember.
“This service has been delayed by a fault with the signalling system” was the most common explanation, given for 669 services.
Merseyrail came closest to running to time, 100.0% of its 400 recorded arrivals; Chiltern Railways had the largest cancelled share at 11.9%.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
The day in numbers
| Passenger trains recorded | 25,083 | |
|---|---|---|
| Cancelled | 602 | 2.4% |
| Arrival time recorded | 19,480 | 79.6% of those that ran |
| …arrived within 5 minutes | 17,007 | 87.3% |
| …arrived 5 to 30 minutes late | 2,328 | 12.0% |
| …arrived more than 30 minutes late | 145 | 0.7% |
| Average delay at destination | 1.7 min |
Every percentage among the bands is of the 19,480 trains whose arrival reached the archive — not of all 25,083, and the bands are exclusive. 5,001 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 2,883 runs down to North Yorkshire Moors Railway on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 2,883 | 0% | 2,135 | 96% | 95% | 0.5 min |
Northern NT | 2,766 | 1% | 2,527 | 91% | 90% | 0.8 min |
Great Western Railway GW | 2,069 | 2% | 1,262 | 81% | 78% | 4.3 min |
South Western Railway SW | 1,811 | 1% | 1,422 | 88% | 87% | 1.2 min |
Southeastern SE | 1,752 | 3% | 1,528 | 83% | 81% | 2.6 min |
Southern SN | 1,699 | 3% | 1,530 | 84% | 81% | 2.3 min |
London Overground LO | 1,578 | 3% | 1,457 | 98% | 95% | -0.2 min |
Greater Anglia LE | 1,288 | 1% | 1,225 | 90% | 90% | 0.9 min |
West Midlands Railway LM | 1,258 | 2% | 994 | 86% | 83% | 1.7 min |
Transport for Wales AW | 1,173 | 6% | 908 | 92% | 86% | -0.1 min |
Thameslink TL | 960 | 5% | 499 | 71% | 64% | 4 min |
London Underground LT | 742 | 0% | 135 | 95% | 95% | 0.4 min |
Elizabeth line XR | 688 | 5% | 602 | 95% | 90% | -0.4 min |
East Midlands Railway EM | 599 | 3% | 446 | 75% | 73% | 4 min |
Merseyrail ME | 577 | 0% | 400 | 100% | 100% | -0.9 min |
Great Northern GN | 409 | 5% | 287 | 77% | 72% | 3.6 min |
c2c CC | 399 | 6% | 320 | 91% | 85% | 2 min |
Avanti West Coast VT | 397 | 2% | 289 | 33% | 33% | 13.4 min |
Chiltern Railways CH | 345 | 12% | 286 | 90% | 79% | 1.6 min |
CrossCountry XC | 335 | 5% | 250 | 60% | 57% | 7.1 min |
TransPennine Express TP | 316 | 3% | 296 | 77% | 74% | 3 min |
London North Eastern Railway GR | 300 | 0% | 192 | 81% | 81% | 1.8 min |
Tyne and Wear Metro TW | 173 | 0% | 85 | 96% | 96% | -0.1 min |
Heathrow Express HX | 146 | 1% | 142 | 95% | 94% | 0.6 min |
Sheffield Supertram SJ | 96 | 0% | 36 | 100% | 100% | -0.9 min |
Gatwick Express GX | 72 | 1% | 70 | 69% | 68% | 4 min |
Eurostar ES | 52 | 0% | 25 | 72% | 72% | 6.1 min |
Island Line IL | 51 | 0% | 48 | 100% | 100% | -0.4 min |
Charter/Other ZZ | 47 | 0% | 6 | 67% | 67% | 12.3 min |
Grand Central GC | 21 | 10% | 18 | 67% | 60% | 3.5 min |
West Coast Railway Co WR | 17 | 0% | 8 | 88% | 88% | -10.4 min |
Hull Trains HT | 14 | 7% | 13 | 77% | 71% | 4.2 min |
LS LS | 11 | 0% | 2 | 100% | 100% | -47 min |
Lumo LD | 11 | 0% | 11 | 82% | 82% | 0.2 min |
Lumo Stirling LF | 10 | 0% | 10 | 50% | 50% | 12.6 min |
Caledonian Sleeper CS | 10 | 0% | 10 | 50% | 50% | 14.6 min |
North Yorkshire Moors Railway NY | 8 | 0% | 6 | 100% | 100% | -7.2 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 87% and 85% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a fault with the signalling system
669 services
This service has been delayed by a speed restriction
578 services
This service has been delayed by a late running train being in front of this one
547 services
This service has been delayed by the emergency services dealing with an incident
290 services
This service has been delayed by a speed restriction over defective track
259 services
This service has been delayed by a safety inspection of the track
170 services
This service has been delayed by a fault on a train
96 services
This service has been delayed by the train departing late to maintain customer connections
95 services
Why trains were cancelled
A reason reached the archive for 327 of the 602 cancellations (54.3%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault with the signalling system
94 services
This service has been cancelled because of a safety inspection of the track
43 services
This service has been cancelled because of a fault on this train
42 services
This service has been cancelled because of a late running train being in front of this one
40 services
This service has been cancelled because of the electricity being switched off for safety reasons
37 services
This service has been cancelled because of the emergency services dealing with an incident
25 services
This service has been cancelled because of a speed restriction
23 services
This service has been cancelled because of a points failure
23 services
The longest delays
The worst of them arrived 4h 43m behind schedule — Cheltenham Spa to London Paddington, booked away at 05:53, run by Great Western Railway. The ten longest range from 4h 43m down to 1h 30m, and they belong to 3 operators, Great Western Railway accounting for 8. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
05:53 | Cheltenham Spa to London Paddington 1L62 · GW | 4h 43m |
06:26 | Swansea to London Paddington 1L07 · GW | 4h 19m |
07:18 | Swansea to London Paddington 1L10 · GW | 3h 34m |
05:03 | Penzance to London Paddington 1A73 · GW | 2h 49m |
06:37 | Plymouth to London Paddington 1J74 · GW | 1h 59m |
09:30 | Bristol Temple Meads to London Paddington 1A14 · GW | 1h 54m |
12:48 | London Paddington to Swansea 1B15 · GW | 1h 36m |
09:29 | Weston-super-Mare to London Paddington 1A15 · GW | 1h 32m |
17:14 | Middlesbrough to York 1G82 · TP | 1h 32m |
23:40 | Edinburgh to Carstairs 1C11 · CS | 1h 30m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 10:00, when 60% of 1,421 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 14.
What ran
Formations were recorded for 26,877 trains on this date, made up of 2,886 individual units and 12,690 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,273 of the day's recorded trains from a pool of 222 units.
The average train was 5.6 vehicles long. The longest formation recorded was 24 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,273 | 222 |
| Class 465 | 1,643 | 103 |
| Class 720 | 1,569 | 127 |
| Class 450 | 1,496 | 118 |
| Class 150 | 1,372 | 95 |
| Class 158 | 1,364 | 133 |
| Class 387 | 1,299 | 85 |
| Class 345 | 1,235 | 69 |
| Class 156 | 1,174 | 96 |
| Class 165 | 1,161 | 61 |
| Class 375 | 1,014 | 100 |
| Class 700 | 1,001 | 102 |
Of 25,083 runs, 26,877 had a formation published (107%) — these are allocations rather than observations.
Buses
17,316 buses from 191 operators were seen on this date, across 3,168,188 position reports.
130,750 bus journeys were followed to their destination on this date. 91,727 arrived on time, 6,354 late, and 32,669 — 25% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.2 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 130,750 | |
|---|---|---|
| On time | 91,727 | 70.2% |
| Early | 32,669 | 25.0% |
| Late | 6,354 | 4.9% |
| …more than 20 minutes late | 627 | 0.5% |
| Average arrival | 0.2 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 101,202 | 72% | 26% |
First South Yorkshire FSYO | 1,998 | 63% | 27% |
Go North East GNEL | 1,982 | 74% | 11% |
First Leeds FLDS | 1,434 | 61% | 29% |
Bee Network BNML | 999 | 76% | 19% |
Bee Network BNSM | 923 | 79% | 16% |
Arriva Yorkshire WRAY | 874 | 60% | 29% |
National Express NATX | 841 | 34% | 34% |
First Potteries FPOT | 832 | 56% | 37% |
National Express West Midlands TNXB | 827 | 78% | 15% |
First Leicester FLEI | 730 | 59% | 37% |
Preston Bus PBLT | 689 | 64% | 30% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (92%), and National Express furthest from it (34%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 14 Sept 2026 itself. How these figures are measured · Sources and licences