Sunday, 13 September 2026
Sunday, 13 September 2026 was a poor day on the railway: of the 11,611 passenger trains whose arrival was recorded, 88% were within five minutes, and a further 707 were cancelled outright.
A weekend timetable, so the 16,836 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.
1,305 trains arrived more than five minutes late and 82 more than half an hour, against 10,224 that ran to time. The average delay across every train whose arrival was recorded was 1.4 minutes.
The reason attached most often to a late train was “This service has been delayed by a late running train being in front of this one” — 314 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.
The busiest hour was 16:00, with 1,170 booked departures and an average delay of 1.4 minutes.
The day in numbers
| Passenger trains recorded | 16,836 | |
|---|---|---|
| Cancelled | 707 | 4.2% |
| Arrival time recorded | 11,611 | 72.0% of those that ran |
| …arrived within 5 minutes | 10,224 | 88.1% |
| …arrived 5 to 30 minutes late | 1,305 | 11.2% |
| …arrived more than 30 minutes late | 82 | 0.7% |
| Average delay at destination | 1.4 min |
Every percentage among the bands is of the 11,611 trains whose arrival reached the archive — not of all 16,836, and the bands are exclusive. 4,518 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from ScotRail on 1,648 runs down to North Yorkshire Moors Railway on 2. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 1,648 | 1% | 1,065 | 95% | 94% | 0.3 min |
South Western Railway SW | 1,487 | 5% | 914 | 87% | 80% | 2 min |
London Overground LO | 1,399 | 12% | 1,036 | 96% | 83% | 0.3 min |
Northern NT | 1,323 | 1% | 1,146 | 90% | 89% | 0.8 min |
Southern SN | 1,322 | 2% | 900 | 82% | 80% | 2.5 min |
Great Western Railway GW | 1,228 | 4% | 757 | 82% | 77% | 3.5 min |
Greater Anglia LE | 973 | 3% | 835 | 94% | 91% | 0.1 min |
Southeastern SE | 942 | 0% | 749 | 89% | 89% | 1 min |
Transport for Wales AW | 806 | 2% | 590 | 92% | 90% | -0.2 min |
London Underground LT | 687 | 0% | 136 | 99% | 99% | 0.3 min |
West Midlands Railway LM | 652 | 5% | 470 | 80% | 75% | 2.8 min |
Thameslink TL | 589 | 1% | 442 | 89% | 88% | 0.6 min |
Elizabeth line XR | 506 | 22% | 388 | 95% | 74% | -0.2 min |
TransPennine Express TP | 449 | 0% | 352 | 89% | 89% | 1.2 min |
East Midlands Railway EM | 343 | 2% | 257 | 79% | 77% | 3.1 min |
Great Northern GN | 295 | 3% | 203 | 97% | 92% | -0.2 min |
Merseyrail ME | 289 | 0% | 219 | 100% | 100% | -0.5 min |
Avanti West Coast VT | 283 | 4% | 202 | 22% | 21% | 13.9 min |
Chiltern Railways CH | 281 | 1% | 173 | 99% | 98% | -1.2 min |
c2c CC | 240 | 3% | 98 | 88% | 81% | 2 min |
CrossCountry XC | 232 | 20% | 129 | 64% | 47% | 5.8 min |
London North Eastern Railway GR | 214 | 0% | 158 | 85% | 85% | -0.8 min |
Heathrow Express HX | 155 | 50% | 74 | 78% | 38% | 3.8 min |
Tyne and Wear Metro TW | 146 | 0% | 84 | 87% | 87% | 3.2 min |
Gatwick Express GX | 64 | 0% | 62 | 66% | 66% | 4 min |
Sheffield Supertram SJ | 51 | 0% | 32 | 100% | 100% | -0.7 min |
Eurostar ES | 51 | 0% | 30 | 50% | 50% | 20.6 min |
Island Line IL | 46 | 0% | 44 | 98% | 98% | -0.4 min |
Charter/Other ZZ | 32 | 0% | 6 | 100% | 100% | -1.7 min |
West Coast Railway Co WR | 26 | 0% | 6 | 83% | 83% | -7.7 min |
Grand Central GC | 24 | 4% | 14 | 100% | 93% | 0.2 min |
Hull Trains HT | 12 | 0% | 12 | 83% | 83% | 1 min |
Lumo LD | 11 | 0% | 11 | 82% | 82% | -0.4 min |
Lumo Stirling LF | 8 | 0% | 7 | 0% | 0% | 15.6 min |
LS LS | 7 | 0% | 3 | 100% | 100% | -30.3 min |
Caledonian Sleeper CS | 7 | 0% | 7 | 86% | 86% | -3.4 min |
TY TY | 6 | 0% | 0 | — | — | — |
North Yorkshire Moors Railway NY | 2 | 0% | 0 | — | — | — |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 88% and 83% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
314 services
This service has been delayed by a speed restriction
310 services
This service has been delayed by a speed restriction over defective track
137 services
This service has been delayed by a fault with the signalling system
135 services
This service has been delayed by a problem currently under investigation
119 services
This service has been delayed by the train departing late to maintain customer connections
80 services
This service has been delayed by a fault on this train
64 services
This service has been delayed by engineering works not being finished on time
55 services
Why trains were cancelled
A reason reached the archive for 500 of the 707 cancellations (70.7%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of vandalism of railway equipment
216 services
This service has been cancelled because of a burst water main flooding the railway
137 services
This service has been cancelled because of a shortage of train drivers
42 services
This service has been cancelled because of urgent repairs to the railway
32 services
This service has been cancelled because of the emergency services dealing with an incident
26 services
This service has been cancelled because of a shortage of train crew
19 services
This service has been cancelled because of a speed restriction
14 services
This service has been cancelled because of a short-notice change to the timetable
14 services
The longest delays
The worst of them arrived 2h 28m behind schedule — South Gosforth (T & W Metro) to South Hylton (T & W Metro), booked away at 06:23, run by Tyne and Wear Metro. The ten longest range from 2h 28m down to 1h 01m, and they belong to 6 operators, Great Western Railway accounting for 5. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
06:23 | South Gosforth (T & W Metro) to South Hylton (T & W Metro) 2I09 · TW | 2h 28m |
21:44 | London Paddington to Worcester Shrub Hill 1W79 · GW | 1h 50m |
20:16 | Taunton to Bristol Temple Meads 2M71 · GW | 1h 44m |
15:31 | Hereford to London Paddington 1P68 · GW | 1h 30m |
19:08 | Paris Nord to London St Pancras (Intl) 9O55 · ES | 1h 29m |
22:40 | Brighton to London Victoria 1A69 · SN | 1h 24m |
17:31 | Hereford to London Paddington 1P78 · GW | 1h 10m |
22:25 | London Euston to Wolverhampton 9G68 · VT | 1h 07m |
19:45 | Bath Spa to London Paddington 1H31 · GW | 1h 04m |
20:47 | Skegness to Nottingham 2O32 · EM | 1h 01m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 05:00, when 15% of 109 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 03:00 with 24.
What ran
Formations were recorded for 15,065 trains on this date, made up of 2,218 individual units and 9,906 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 1,525 of the day's recorded trains from a pool of 143 units.
The average train was 6 vehicles long. The longest formation recorded was 20 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 1,525 | 143 |
| Class 158 | 925 | 114 |
| Class 345 | 916 | 57 |
| Class 720 | 916 | 86 |
| Class 450 | 772 | 81 |
| Class 387 | 733 | 65 |
| Class 150 | 713 | 71 |
| Class 375 | 662 | 78 |
| Class 385 | 645 | 56 |
| Class 700 | 614 | 74 |
| Class 156 | 611 | 70 |
| Class 165 | 587 | 53 |
Of 16,836 runs, 15,065 had a formation published (89%) — these are allocations rather than observations.
Buses
11,065 buses from 117 operators were seen on this date, across 2,008,641 position reports.
92,874 bus journeys were followed to their destination on this date. 60,219 arrived on time, 6,997 late, and 25,658 — 28% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
The average arrival was 0 minutes late, and 560 journeys finished more than twenty minutes down.
| Journeys followed to destination | 92,874 | |
|---|---|---|
| On time | 60,219 | 64.8% |
| Early | 25,658 | 27.6% |
| Late | 6,997 | 7.5% |
| …more than 20 minutes late | 560 | 0.6% |
| Average arrival | 0 min late |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 77,114 | 65% | 29% |
First Leeds FLDS | 1,224 | 63% | 25% |
Go North East GNEL | 1,202 | 63% | 12% |
First South Yorkshire FSYO | 1,071 | 55% | 29% |
National Express NATX | 896 | 32% | 36% |
Bee Network BNML | 852 | 71% | 18% |
Bee Network BNSM | 585 | 77% | 16% |
National Express West Midlands TNXB | 496 | 79% | 11% |
Arriva Yorkshire WRAY | 405 | 57% | 33% |
Preston Bus PBLT | 400 | 57% | 33% |
Brighton & Hove Bus and Coach Company BHBC | 325 | 86% | 9% |
First Potteries FPOT | 278 | 58% | 33% |
Of the operators with enough journeys to compare, Brighton & Hove Bus and Coach Company ran closest to time (86%), and National Express furthest from it (32%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 13 Sept 2026 itself. How these figures are measured · Sources and licences