Monday, 19 October 2026
88% of the 21,743 passenger trains whose arrival was recorded on Monday, 19 October 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.
Of 25,955 recorded runs, 640 did not run at all. Among those whose arrival reached the archive, 19,149 were within five minutes, 2,486 between five and thirty minutes down, and 108 more than half an hour — the tail that people actually remember.
“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 627 services.
Tyne and Wear Metro came closest to running to time, 97.7% of its 172 recorded arrivals; Chiltern Railways had the largest cancelled share at 15.7%.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
Buses on this date: 134,131 journeys followed to their destination, 69.5% on time.
The day in numbers
| Passenger trains recorded | 25,955 | |
|---|---|---|
| Cancelled | 640 | 2.5% |
| Arrival time recorded | 21,743 | 85.9% of those that ran |
| …arrived within 5 minutes | 19,149 | 88.1% |
| …arrived 5 to 30 minutes late | 2,486 | 11.4% |
| …arrived more than 30 minutes late | 108 | 0.5% |
| Average delay at destination | 1.6 min |
Every percentage among the bands is of the 21,743 trains whose arrival reached the archive — not of all 25,955, and the bands are exclusive. 3,572 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 2,985 runs down to LS on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 2,985 | 1% | 2,130 | 86% | 85% | 3 min |
Northern NT | 2,820 | 4% | 2,618 | 89% | 85% | 1.3 min |
Great Western Railway GW | 2,154 | 0% | 1,678 | 89% | 89% | 0.9 min |
Southeastern SE | 1,781 | 5% | 1,672 | 81% | 76% | 2.8 min |
South Western Railway SW | 1,765 | 4% | 1,520 | 87% | 83% | 1.4 min |
Southern SN | 1,684 | 2% | 1,564 | 89% | 87% | 1.5 min |
London Overground LO | 1,608 | 2% | 1,472 | 94% | 92% | 0.1 min |
Greater Anglia LE | 1,389 | 3% | 1,247 | 91% | 87% | 1 min |
West Midlands Railway LM | 1,324 | 1% | 1,291 | 95% | 94% | 0.7 min |
Transport for Wales AW | 1,232 | 2% | 1,029 | 94% | 92% | -0.5 min |
Thameslink TL | 976 | 6% | 596 | 86% | 78% | 2.2 min |
Merseyrail ME | 806 | 1% | 611 | 97% | 96% | -0.4 min |
London Underground LT | 778 | 0% | 414 | 91% | 91% | 2 min |
Elizabeth line XR | 700 | 4% | 670 | 89% | 86% | 1 min |
East Midlands Railway EM | 627 | 0% | 502 | 81% | 80% | 2.7 min |
Great Northern GN | 434 | 1% | 388 | 82% | 81% | 2.5 min |
Avanti West Coast VT | 416 | 2% | 310 | 61% | 60% | 5.4 min |
c2c CC | 408 | 5% | 324 | 92% | 86% | 1.4 min |
CrossCountry XC | 347 | 1% | 272 | 69% | 68% | 6.3 min |
Chiltern Railways CH | 345 | 16% | 285 | 90% | 76% | 2 min |
London North Eastern Railway GR | 324 | 1% | 196 | 78% | 77% | 3 min |
TransPennine Express TP | 313 | 1% | 306 | 84% | 83% | 1.8 min |
Tyne and Wear Metro TW | 173 | 0% | 172 | 98% | 98% | 1.6 min |
Heathrow Express HX | 152 | 0% | 152 | 90% | 90% | 1.4 min |
Sheffield Supertram SJ | 97 | 0% | 73 | 93% | 93% | 1 min |
Gatwick Express GX | 72 | 1% | 69 | 87% | 86% | 2.8 min |
Eurostar ES | 54 | 0% | 54 | 59% | 59% | 10.3 min |
Island Line IL | 52 | 0% | 52 | 100% | 100% | -0.7 min |
Charter/Other ZZ | 45 | 0% | 3 | 67% | 67% | 21 min |
Grand Central GC | 20 | 5% | 18 | 61% | 58% | 10.2 min |
Hull Trains HT | 14 | 0% | 14 | 86% | 86% | 2.1 min |
West Coast Railway Co WR | 13 | 0% | 7 | 71% | 71% | 1.9 min |
Lumo LD | 11 | 0% | 11 | 64% | 64% | 3.6 min |
Lumo Stirling LF | 10 | 20% | 5 | 20% | 14% | 7.4 min |
Caledonian Sleeper CS | 10 | 0% | 10 | 70% | 70% | -2.1 min |
North Yorkshire Moors Railway NY | 8 | 0% | 8 | 50% | 50% | 4.4 min |
LS LS | 8 | 0% | 0 | — | — | — |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 88% and 86% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
627 services
This service has been delayed by a fault with the on train signalling system
598 services
This service has been delayed by a speed restriction
579 services
This service has been delayed by a fault with the signalling system
447 services
This service has been delayed by a speed restriction over defective track
286 services
This service has been delayed by a fault with the signalling system earlier today
168 services
This service has been delayed by a fault on a train earlier
156 services
This service has been delayed by a problem currently under investigation
140 services
Why trains were cancelled
A reason reached the archive for 409 of the 640 cancellations (63.9%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault with the signalling system
141 services
This service has been cancelled because of forecasted slippery rails
87 services
This service has been cancelled because of a points failure
46 services
This service has been cancelled because of a broken down train
35 services
This service has been cancelled because of a late running train being in front of this one
29 services
This service has been cancelled because of a fault on a train in front of this one
25 services
This service has been cancelled because of a fault with the on train signalling system
23 services
This service has been cancelled because of a fault on this train
23 services
The longest delays
The worst of them arrived 6h 02m behind schedule — Dalmuir to Larkhall, booked away at 06:47, run by ScotRail. The ten longest range from 6h 02m down to 1h 20m, and they belong to 6 operators, ScotRail accounting for 5. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
06:47 | Dalmuir to Larkhall 2L06 · SR | 6h 02m |
06:17 | Dalmuir to Larkhall 2L04 · SR | 6h 00m |
07:17 | Dalmuir to Larkhall 2L08 · SR | 6h 00m |
07:47 | Dalmuir to Larkhall 2L10 · SR | 5h 59m |
05:04 | Regent Centre (Bus) to South Hylton (T & W Metro) 2I12 · TW | 2h 18m |
20:02 | Aberdeen to Edinburgh 1B96 · SR | 1h 51m |
07:44 | Elephant & Castle Underground to Stonebridge Park 2I01 · LT | 1h 45m |
06:45 | London Waterloo to Portsmouth Harbour 2P11 · SW | 1h 42m |
06:48 | Glasgow Central to Edinburgh 1Z54 · XC | 1h 23m |
20:25 | London Victoria to Ashford International 2N66 · SE | 1h 20m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 04:00, when 68% of 151 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 9.
What ran
Formations were recorded for 26,504 trains on this date, made up of 2,923 individual units and 12,859 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,301 of the day's recorded trains from a pool of 221 units.
The average train was 5.7 vehicles long. The longest formation recorded was 20 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,301 | 221 |
| Class 465 | 1,628 | 101 |
| Class 720 | 1,549 | 130 |
| Class 450 | 1,467 | 117 |
| Class 387 | 1,353 | 92 |
| Class 150 | 1,317 | 94 |
| Class 158 | 1,243 | 133 |
| Class 345 | 1,222 | 65 |
| Class 165 | 1,147 | 63 |
| Class 156 | 1,102 | 88 |
| Class 700 | 1,014 | 108 |
| Class 375 | 1,005 | 103 |
Of 25,955 runs, 26,504 had a formation published (102%) — these are allocations rather than observations.
Buses
17,487 buses from 185 operators were seen on this date, across 3,172,734 position reports.
134,131 bus journeys were followed to their destination on this date. 93,197 arrived on time, 6,079 late, and 34,855 — 26% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.3 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 134,131 | |
|---|---|---|
| On time | 93,197 | 69.5% |
| Early | 34,855 | 26.0% |
| Late | 6,079 | 4.5% |
| …more than 15 minutes late | 647 | 0.5% |
| Average arrival | 0.3 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 101,536 | 71% | 26% |
Nottingham City Transport NCTR | 2,652 | 75% | 20% |
Go North East GNEL | 2,129 | 78% | 10% |
First South Yorkshire FSYO | 2,083 | 63% | 27% |
First Leeds FLDS | 1,670 | 57% | 32% |
Bee Network BNSM | 974 | 79% | 17% |
Arriva Yorkshire WRAY | 929 | 59% | 31% |
National Express West Midlands TNXB | 861 | 81% | 16% |
First Potteries FPOT | 856 | 57% | 33% |
National Express NATX | 789 | 36% | 33% |
Bee Network BNML | 752 | 70% | 23% |
First Leicester FLEI | 752 | 54% | 42% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (88%), and National Express furthest from it (36%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 19 Oct 2026 itself. How these figures are measured · Sources and licences