TransitRadar

Sunday, 23 August 2026

88% of the 12,964 passenger trains whose arrival was recorded on Sunday, 23 August 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.

Of 16,399 recorded runs, 401 did not run at all. Among those whose arrival reached the archive, 11,457 were within five minutes, 1,420 between five and thirty minutes down, and 87 more than half an hour — the tail that people actually remember.

“This service has been delayed by a safety inspection of the track” was the most common explanation, given for 431 services.

Tyne and Wear Metro came closest to running to time, 100.0% of its 102 recorded arrivals; c2c had the largest cancelled share at 31.2%.

A weekend timetable, so the 16,399 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.

The day in numbers

Passenger trains recorded16,399
Cancelled4012.4%
Arrival time recorded12,96481.0% of those that ran
…arrived within 5 minutes11,45788.4%
…arrived 5 to 30 minutes late1,42011.0%
…arrived more than 30 minutes late870.7%
Average delay at destination1.3 min

Every percentage among the bands is of the 12,964 trains whose arrival reached the archive — not of all 16,399, and the bands are exclusive. 3,034 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

40 operators ran passenger services on this date, from ScotRail on 1,651 runs down to SO on 1. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR1,6511%1,110 93% 92% 1 min
Northern NT1,3791%1,174 91% 90% 0.5 min
South Western Railway SW1,3262%1,022 87% 85% 1.8 min
London Overground LO1,2343%1,197 99% 96% -0.6 min
Southern SN1,2235%904 76% 71% 3.4 min
Great Western Railway GW1,1643%884 86% 83% 1.9 min
Greater Anglia LE1,0091%915 94% 93% 0.2 min
Southeastern SE1,0070%930 85% 85% 1.8 min
Transport for Wales AW8211%650 86% 85% 1.7 min
West Midlands Railway LM6812%579 88% 85% 1.5 min
London Underground LT6520%244 89% 88% 1.8 min
Thameslink TL6053%435 85% 81% 1.5 min
Elizabeth line XR5151%492 99% 98% -1.2 min
TransPennine Express TP4260%326 93% 93% 0.4 min
East Midlands Railway EM3611%286 82% 81% 3.7 min
Merseyrail ME3310%331 98% 98% 0 min
Avanti West Coast VT2864%205 40% 38% 11.1 min
Great Northern GN2420%235 93% 93% 0.7 min
CrossCountry XC22512%40 80% 48% 3.3 min
London North Eastern Railway GR2101%159 63% 62% 4.4 min
Chiltern Railways CH20617%170 95% 79% 0.1 min
c2c CC20231%137 80% 55% 2.7 min
Heathrow Express HX1514%145 99% 95% -0.9 min
Tyne and Wear Metro TW1240%102 100% 100% 0.1 min
Gatwick Express GX723%70 70% 68% 4 min
Eurostar ES520%45 84% 84% 5.8 min
Sheffield Supertram SJ510%48 100% 100% 0.5 min
Island Line IL460%46 100% 100% -0.8 min
Charter/Other ZZ390%5 80% 80% 1.8 min
West Coast Railway Co WR270%12 83% 83% -5.4 min
Grand Central GC240%18 67% 67% 6.2 min
Hull Trains HT120%12 75% 75% 5.9 min
Lumo LD110%11 27% 27% 5.7 min
Lumo Stirling LF863%3 33% 13% 7.3 min
LS LS70%3 100% 100% -3.7 min
Caledonian Sleeper CS70%7 71% 71% -4.9 min
TY TY60%6 33% 33% 8.7 min
North Yorkshire Moors Railway NY40%4 100% 100% 1 min
YG YG10%1 100% 100% -5 min
SO SO10%1 100% 100% 0 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 88% and 86% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a safety inspection of the track

431 services

This service has been delayed by a late running train being in front of this one

316 services

This service has been delayed by a speed restriction over defective track

159 services

This service has been delayed by a fault with the signalling system

132 services

This service has been delayed by a speed restriction

109 services

This service has been delayed by a problem currently under investigation

101 services

This service has been delayed by a fault on a train

60 services

This service has been delayed by congestion

57 services

Why trains were cancelled

A reason reached the archive for 264 of the 401 cancellations (65.8%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a safety inspection of the track

76 services

This service has been cancelled because of a speed restriction

54 services

This service has been cancelled because of a late running train being in front of this one

34 services

This service has been cancelled because of a shortage of train drivers

28 services

This service has been cancelled because of a fire next to the track

23 services

This service has been cancelled because of a shortage of train crew

22 services

This service has been cancelled because of a fault on this train

15 services

This service has been cancelled because of more trains than usual needing repairs at the same time

12 services

The longest delays

The worst of them arrived 2h 59m behind schedule — Skegness to Nottingham, booked away at 12:16, run by East Midlands Railway. The ten longest range from 2h 59m down to 59 min, and they belong to 5 operators, East Midlands Railway accounting for 3. What a delay on that scale usually means.

BookedServiceLate by
12:16Skegness to Nottingham 2O14 · EM2h 59m
10:50Edinburgh to Aberdeen 1A83 · SR2h 23m
18:40Amsterdam CS to London St Pancras (Intl) 9I67 · ES1h 45m
14:15Skegness to Nottingham 2O18 · EM1h 39m
12:38Edinburgh to Aberdeen 1A65 · SR1h 24m
15:15Skegness to Nottingham 2O20 · EM1h 16m
09:48Liverpool Lime Street to Chester 1D00 · AW1h 00m
12:45London Euston to Crewe 1U35 · LM1h 00m
11:50Milford Haven to Manchester Piccadilly 1W59 · AW59 min
16:42Paris Nord to London St Pancras (Intl) 9O45 · ES59 min

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 06:00, when 52% of 223 arrived within five minutes.

00 130
01 36
02 21
03 17
04 42
05 85
06 223
07 526
08 873
09 1,071
10 1,100
11 1,080
12 1,095
13 1,108
14 1,099
15 1,108
16 1,130
17 1,104
18 1,079
19 975
20 842
21 706
22 593
23 356

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 03:00 with 17.

What ran

Formations were recorded for 15,476 trains on this date, made up of 2,262 individual units and 10,049 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 1,495 of the day's recorded trains from a pool of 149 units.

The average train was 5.9 vehicles long. The longest formation recorded was 28 vehicles.

ClassTrainsUnits used
Class 3771,495149
Class 38793265
Class 34591560
Class 158877122
Class 45083789
Class 15075366
Class 72071966
Class 37569685
Class 70067484
Class 16565256
Class 15663072
Class 46563067

Of 16,399 runs, 15,476 had a formation published (94%) — these are allocations rather than observations.

Buses

11,048 buses from 121 operators were seen on this date, across 1,964,693 position reports.

93,926 bus journeys were followed to their destination on this date. 60,153 arrived on time, 7,077 late, and 26,696 — 28% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.1 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination93,926
On time60,15364.0%
Early26,69628.4%
Late7,0777.5%
…more than 20 minutes late4600.5%
Average arrival0.1 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO76,39164%30%
Nottingham City Transport NCTR1,54277%20%
Go North East GNEL1,14071%10%
First Bristol, Bath & the West FBRI1,12163%21%
First Leeds FLDS1,09860%28%
First South Yorkshire FSYO1,00860%25%
National Express NATX93735%36%
Bee Network BNML72171%19%
Bee Network BNSM50878%17%
National Express West Midlands TNXB50074%14%
Arriva Yorkshire WRAY42959%29%
Brighton & Hove Bus and Coach Company BHBC34684%12%

Of the operators with enough journeys to compare, Fastrack (operated by Go Ahead) ran closest to time (90%), and National Express furthest from it (35%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 23 Aug 2026 itself. How these figures are measured · Sources and licences