Monday, 24 August 2026
Monday, 24 August 2026 was a poor day on the railway: of the 20,609 passenger trains whose arrival was recorded, 86% were within five minutes, and a further 837 were cancelled outright.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
2,634 trains arrived more than five minutes late and 256 more than half an hour, against 17,719 that ran to time. The average delay across every train whose arrival was recorded was 2.1 minutes.
The reason attached most often to a late train was “This service has been delayed by a late running train being in front of this one” — 457 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.
The busiest hour was 07:00, with 1,688 booked departures and an average delay of 1.2 minutes.
The day in numbers
| Passenger trains recorded | 26,465 | |
|---|---|---|
| Cancelled | 837 | 3.2% |
| Arrival time recorded | 20,609 | 80.4% of those that ran |
| …arrived within 5 minutes | 17,719 | 86.0% |
| …arrived 5 to 30 minutes late | 2,634 | 12.8% |
| …arrived more than 30 minutes late | 256 | 1.2% |
| Average delay at destination | 2.1 min |
Every percentage among the bands is of the 20,609 trains whose arrival reached the archive — not of all 26,465, and the bands are exclusive. 5,019 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from ScotRail on 3,101 runs down to LS on 8. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
ScotRail SR | 3,101 | 1% | 2,199 | 96% | 95% | 0.4 min |
Northern NT | 2,843 | 2% | 2,584 | 87% | 86% | 1.4 min |
Great Western Railway GW | 2,220 | 2% | 1,567 | 82% | 80% | 2.7 min |
South Western Railway SW | 1,911 | 2% | 1,479 | 86% | 84% | 1.7 min |
Southeastern SE | 1,803 | 2% | 1,681 | 85% | 83% | 2.1 min |
Southern SN | 1,742 | 3% | 1,506 | 84% | 81% | 2.2 min |
London Overground LO | 1,667 | 7% | 1,408 | 94% | 87% | 0.5 min |
Greater Anglia LE | 1,431 | 3% | 1,160 | 89% | 86% | 1.1 min |
West Midlands Railway LM | 1,339 | 3% | 1,123 | 87% | 83% | 1.9 min |
Transport for Wales AW | 1,303 | 3% | 959 | 87% | 84% | 1.2 min |
Thameslink TL | 953 | 5% | 527 | 85% | 78% | 2.1 min |
London Underground LT | 774 | 0% | 367 | 95% | 95% | 1.1 min |
Elizabeth line XR | 697 | 14% | 587 | 97% | 83% | -0.8 min |
Merseyrail ME | 622 | 0% | 514 | 97% | 97% | 0.4 min |
East Midlands Railway EM | 621 | 2% | 463 | 77% | 75% | 3.6 min |
c2c CC | 520 | 13% | 277 | 50% | 41% | 6.6 min |
Great Northern GN | 430 | 8% | 327 | 76% | 69% | 4.8 min |
Avanti West Coast VT | 384 | 2% | 267 | 43% | 42% | 11.4 min |
CrossCountry XC | 355 | 5% | 254 | 54% | 50% | 9.7 min |
Chiltern Railways CH | 346 | 5% | 316 | 95% | 90% | 0.7 min |
TransPennine Express TP | 336 | 4% | 297 | 71% | 68% | 4.4 min |
London North Eastern Railway GR | 318 | 7% | 155 | 43% | 38% | 21.9 min |
Tyne and Wear Metro TW | 174 | 0% | 160 | 97% | 97% | 0.4 min |
Heathrow Express HX | 152 | 0% | 146 | 80% | 80% | 2.8 min |
Sheffield Supertram SJ | 97 | 0% | 66 | 98% | 98% | 0.2 min |
Gatwick Express GX | 74 | 3% | 61 | 66% | 63% | 5.3 min |
Eurostar ES | 55 | 0% | 46 | 72% | 72% | 8.4 min |
Island Line IL | 52 | 2% | 39 | 97% | 95% | 0.8 min |
Charter/Other ZZ | 46 | 0% | 2 | 100% | 100% | 0 min |
Grand Central GC | 22 | 9% | 18 | 11% | 10% | 44.8 min |
West Coast Railway Co WR | 16 | 0% | 6 | 67% | 67% | 8 min |
Hull Trains HT | 14 | 7% | 12 | 25% | 23% | 36.2 min |
Lumo LD | 11 | 18% | 9 | 56% | 45% | 38.3 min |
Lumo Stirling LF | 10 | 0% | 10 | 50% | 50% | 7.9 min |
Caledonian Sleeper CS | 10 | 10% | 9 | 67% | 60% | 0.4 min |
North Yorkshire Moors Railway NY | 8 | 0% | 8 | 100% | 100% | -42.2 min |
LS LS | 8 | 0% | 0 | — | — | — |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 86% and 83% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a late running train being in front of this one
457 services
This service has been delayed by a speed restriction
364 services
This service has been delayed by a speed restriction over defective track
290 services
This service has been delayed by a safety inspection of the track
214 services
This service has been delayed by a fire next to the track
204 services
This service has been delayed by a speed restriction earlier today
175 services
This service has been delayed by a fault with the signalling system
131 services
This service has been delayed by congestion
115 services
Why trains were cancelled
A reason reached the archive for 372 of the 837 cancellations (44.4%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of the fire alarm sounding at a station
71 services
This service has been cancelled because of a fire next to the track
64 services
This service has been cancelled because of a speed restriction
63 services
This service has been cancelled because of a safety inspection of the track
46 services
This service has been cancelled because of a late running freight train
36 services
This service has been cancelled because of a fault with the signalling system
33 services
This service has been cancelled because of damage to the overhead electric wires
32 services
This service has been cancelled because of a broken rail
27 services
The longest delays
The worst of them arrived 2h 38m behind schedule — Edinburgh to London Kings Cross, booked away at 06:26, run by Lumo. The ten longest range from 2h 38m down to 1h 49m, and they belong to 6 operators, London North Eastern Railway accounting for 4. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
06:26 | Edinburgh to London Kings Cross 1E80 · LD | 2h 38m |
08:40 | Leeds to London Kings Cross 1A12 · GR | 2h 32m |
08:40 | Gloucester to Bristol Temple Meads 2T41 · GW | 2h 30m |
16:41 | Moorgate to Stevenage 2F46 · GN | 2h 25m |
08:10 | Beverley to London Kings Cross 1A92 · HT | 2h 15m |
09:20 | Lincoln Central to London Kings Cross 1B83 · GR | 2h 12m |
08:30 | Edinburgh to London Kings Cross 1E07 · GR | 2h 03m |
08:56 | Bradford Interchange to London Kings Cross 1A70 · GC | 1h 56m |
16:53 | Welwyn Garden City to Moorgate 2K51 · GN | 1h 53m |
08:00 | Edinburgh to London Kings Cross 1E06 · GR | 1h 49m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 14:00, when 50% of 1,432 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 13.
What ran
Formations were recorded for 26,527 trains on this date, made up of 2,848 individual units and 12,481 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,243 of the day's recorded trains from a pool of 219 units.
The average train was 5.6 vehicles long. The longest formation recorded was 18 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,243 | 219 |
| Class 465 | 1,609 | 100 |
| Class 450 | 1,462 | 117 |
| Class 720 | 1,412 | 108 |
| Class 158 | 1,390 | 135 |
| Class 150 | 1,336 | 86 |
| Class 387 | 1,313 | 90 |
| Class 345 | 1,219 | 67 |
| Class 156 | 1,139 | 90 |
| Class 165 | 1,122 | 60 |
| Class 375 | 1,036 | 101 |
| Class 385 | 993 | 66 |
Of 26,465 runs, 26,527 had a formation published (100%) — these are allocations rather than observations.
Buses
16,355 buses from 168 operators were seen on this date, across 3,018,062 position reports.
127,498 bus journeys were followed to their destination on this date. 86,602 arrived on time, 5,345 late, and 35,551 — 28% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.5 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 127,498 | |
|---|---|---|
| On time | 86,602 | 67.9% |
| Early | 35,551 | 27.9% |
| Late | 5,345 | 4.2% |
| …more than 20 minutes late | 532 | 0.4% |
| Average arrival | 0.5 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 96,857 | 69% | 28% |
Nottingham City Transport NCTR | 2,502 | 77% | 21% |
Go North East GNEL | 1,860 | 78% | 11% |
First South Yorkshire FSYO | 1,770 | 59% | 35% |
First Bristol, Bath & the West FBRI | 1,496 | 55% | 33% |
First Leeds FLDS | 1,465 | 52% | 40% |
National Express NATX | 927 | 35% | 35% |
Bee Network BNSM | 862 | 76% | 20% |
Arriva Yorkshire WRAY | 848 | 57% | 36% |
National Express West Midlands TNXB | 802 | 79% | 17% |
First Potteries FPOT | 725 | 50% | 43% |
Bee Network BNML | 582 | 70% | 25% |
Of the operators with enough journeys to compare, Fastrack (operated by Go Ahead) ran closest to time (86%), and National Express furthest from it (35%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 24 Aug 2026 itself. How these figures are measured · Sources and licences