TransitRadar

Monday, 24 August 2026

Monday, 24 August 2026 was a poor day on the railway: of the 20,609 passenger trains whose arrival was recorded, 86% were within five minutes, and a further 837 were cancelled outright.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

2,634 trains arrived more than five minutes late and 256 more than half an hour, against 17,719 that ran to time. The average delay across every train whose arrival was recorded was 2.1 minutes.

The reason attached most often to a late train was “This service has been delayed by a late running train being in front of this one” — 457 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.

The busiest hour was 07:00, with 1,688 booked departures and an average delay of 1.2 minutes.

The day in numbers

Passenger trains recorded26,465
Cancelled8373.2%
Arrival time recorded20,60980.4% of those that ran
…arrived within 5 minutes17,71986.0%
…arrived 5 to 30 minutes late2,63412.8%
…arrived more than 30 minutes late2561.2%
Average delay at destination2.1 min

Every percentage among the bands is of the 20,609 trains whose arrival reached the archive — not of all 26,465, and the bands are exclusive. 5,019 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

37 operators ran passenger services on this date, from ScotRail on 3,101 runs down to LS on 8. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,1011%2,199 96% 95% 0.4 min
Northern NT2,8432%2,584 87% 86% 1.4 min
Great Western Railway GW2,2202%1,567 82% 80% 2.7 min
South Western Railway SW1,9112%1,479 86% 84% 1.7 min
Southeastern SE1,8032%1,681 85% 83% 2.1 min
Southern SN1,7423%1,506 84% 81% 2.2 min
London Overground LO1,6677%1,408 94% 87% 0.5 min
Greater Anglia LE1,4313%1,160 89% 86% 1.1 min
West Midlands Railway LM1,3393%1,123 87% 83% 1.9 min
Transport for Wales AW1,3033%959 87% 84% 1.2 min
Thameslink TL9535%527 85% 78% 2.1 min
London Underground LT7740%367 95% 95% 1.1 min
Elizabeth line XR69714%587 97% 83% -0.8 min
Merseyrail ME6220%514 97% 97% 0.4 min
East Midlands Railway EM6212%463 77% 75% 3.6 min
c2c CC52013%277 50% 41% 6.6 min
Great Northern GN4308%327 76% 69% 4.8 min
Avanti West Coast VT3842%267 43% 42% 11.4 min
CrossCountry XC3555%254 54% 50% 9.7 min
Chiltern Railways CH3465%316 95% 90% 0.7 min
TransPennine Express TP3364%297 71% 68% 4.4 min
London North Eastern Railway GR3187%155 43% 38% 21.9 min
Tyne and Wear Metro TW1740%160 97% 97% 0.4 min
Heathrow Express HX1520%146 80% 80% 2.8 min
Sheffield Supertram SJ970%66 98% 98% 0.2 min
Gatwick Express GX743%61 66% 63% 5.3 min
Eurostar ES550%46 72% 72% 8.4 min
Island Line IL522%39 97% 95% 0.8 min
Charter/Other ZZ460%2 100% 100% 0 min
Grand Central GC229%18 11% 10% 44.8 min
West Coast Railway Co WR160%6 67% 67% 8 min
Hull Trains HT147%12 25% 23% 36.2 min
Lumo LD1118%9 56% 45% 38.3 min
Lumo Stirling LF100%10 50% 50% 7.9 min
Caledonian Sleeper CS1010%9 67% 60% 0.4 min
North Yorkshire Moors Railway NY80%8 100% 100% -42.2 min
LS LS80%0 — — —

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 86% and 83% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

457 services

This service has been delayed by a speed restriction

364 services

This service has been delayed by a speed restriction over defective track

290 services

This service has been delayed by a safety inspection of the track

214 services

This service has been delayed by a fire next to the track

204 services

This service has been delayed by a speed restriction earlier today

175 services

This service has been delayed by a fault with the signalling system

131 services

This service has been delayed by congestion

115 services

Why trains were cancelled

A reason reached the archive for 372 of the 837 cancellations (44.4%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of the fire alarm sounding at a station

71 services

This service has been cancelled because of a fire next to the track

64 services

This service has been cancelled because of a speed restriction

63 services

This service has been cancelled because of a safety inspection of the track

46 services

This service has been cancelled because of a late running freight train

36 services

This service has been cancelled because of a fault with the signalling system

33 services

This service has been cancelled because of damage to the overhead electric wires

32 services

This service has been cancelled because of a broken rail

27 services

The longest delays

The worst of them arrived 2h 38m behind schedule — Edinburgh to London Kings Cross, booked away at 06:26, run by Lumo. The ten longest range from 2h 38m down to 1h 49m, and they belong to 6 operators, London North Eastern Railway accounting for 4. What a delay on that scale usually means.

BookedServiceLate by
06:26Edinburgh to London Kings Cross 1E80 · LD2h 38m
08:40Leeds to London Kings Cross 1A12 · GR2h 32m
08:40Gloucester to Bristol Temple Meads 2T41 · GW2h 30m
16:41Moorgate to Stevenage 2F46 · GN2h 25m
08:10Beverley to London Kings Cross 1A92 · HT2h 15m
09:20Lincoln Central to London Kings Cross 1B83 · GR2h 12m
08:30Edinburgh to London Kings Cross 1E07 · GR2h 03m
08:56Bradford Interchange to London Kings Cross 1A70 · GC1h 56m
16:53Welwyn Garden City to Moorgate 2K51 · GN1h 53m
08:00Edinburgh to London Kings Cross 1E06 · GR1h 49m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 14:00, when 50% of 1,432 arrived within five minutes.

00 61
01 23
02 13
03 24
04 153
05 950
06 1,632
07 1,688
08 1,571
09 1,469
10 1,438
11 1,412
12 1,418
13 1,413
14 1,432
15 1,458
16 1,572
17 1,643
18 1,551
19 1,368
20 1,234
21 1,148
22 1,037
23 757

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 13.

What ran

Formations were recorded for 26,527 trains on this date, made up of 2,848 individual units and 12,481 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,243 of the day's recorded trains from a pool of 219 units.

The average train was 5.6 vehicles long. The longest formation recorded was 18 vehicles.

ClassTrainsUnits used
Class 3773,243219
Class 4651,609100
Class 4501,462117
Class 7201,412108
Class 1581,390135
Class 1501,33686
Class 3871,31390
Class 3451,21967
Class 1561,13990
Class 1651,12260
Class 3751,036101
Class 38599366

Of 26,465 runs, 26,527 had a formation published (100%) — these are allocations rather than observations.

Buses

16,355 buses from 168 operators were seen on this date, across 3,018,062 position reports.

127,498 bus journeys were followed to their destination on this date. 86,602 arrived on time, 5,345 late, and 35,551 — 28% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.5 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination127,498
On time86,60267.9%
Early35,55127.9%
Late5,3454.2%
…more than 20 minutes late5320.4%
Average arrival0.5 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO96,85769%28%
Nottingham City Transport NCTR2,50277%21%
Go North East GNEL1,86078%11%
First South Yorkshire FSYO1,77059%35%
First Bristol, Bath & the West FBRI1,49655%33%
First Leeds FLDS1,46552%40%
National Express NATX92735%35%
Bee Network BNSM86276%20%
Arriva Yorkshire WRAY84857%36%
National Express West Midlands TNXB80279%17%
First Potteries FPOT72550%43%
Bee Network BNML58270%25%

Of the operators with enough journeys to compare, Fastrack (operated by Go Ahead) ran closest to time (86%), and National Express furthest from it (35%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 24 Aug 2026 itself. How these figures are measured · Sources and licences