TransitRadar

Saturday, 22 August 2026

Saturday, 22 August 2026 was a poor day on the railway: of the 17,772 passenger trains whose arrival was recorded, 87% were within five minutes, and a further 816 were cancelled outright.

A weekend timetable, so the 24,562 recorded runs are well below a weekday's — most engineering possessions land here too, which shortens some routes and removes others entirely.

2,225 trains arrived more than five minutes late and 91 more than half an hour, against 15,456 that ran to time. The average delay across every train whose arrival was recorded was 1.5 minutes.

The reason attached most often to a late train was “This service has been delayed by a safety inspection of the track” — 679 services carried it. Darwin publishes these as complete sentences written for passengers, so they appear here unedited.

The busiest hour was 17:00, with 1,465 booked departures and an average delay of 1.8 minutes.

The day in numbers

Passenger trains recorded24,562
Cancelled8163.3%
Arrival time recorded17,77274.8% of those that ran
…arrived within 5 minutes15,45687.0%
…arrived 5 to 30 minutes late2,22512.5%
…arrived more than 30 minutes late910.5%
Average delay at destination1.5 min

Every percentage among the bands is of the 17,772 trains whose arrival reached the archive — not of all 24,562, and the bands are exclusive. 5,974 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

39 operators ran passenger services on this date, from ScotRail on 2,873 runs down to Caledonian Sleeper on 3. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR2,8730%2,023 94% 94% 0.6 min
Northern NT2,8034%2,509 90% 87% 1.1 min
Great Western Railway GW1,9853%1,270 82% 78% 2.4 min
South Western Railway SW1,7904%1,278 81% 77% 2.8 min
Southern SN1,5958%1,197 81% 73% 3 min
London Overground LO1,5656%1,176 95% 87% 0.5 min
Southeastern SE1,4401%1,275 90% 89% 1 min
West Midlands Railway LM1,3654%877 86% 81% 1.9 min
Transport for Wales AW1,2662%913 86% 83% 0.8 min
Greater Anglia LE1,2271%1,062 90% 89% 0.7 min
Thameslink TL8463%499 82% 78% 2 min
London Underground LT6660%138 97% 95% 0.5 min
Elizabeth line XR6624%582 94% 90% -0.1 min
East Midlands Railway EM6192%464 78% 76% 2.5 min
Merseyrail ME5995%349 99% 91% 0 min
TransPennine Express TP5432%387 87% 85% 1.2 min
CrossCountry XC3944%238 66% 62% 5.8 min
Avanti West Coast VT3817%239 59% 53% 6.1 min
c2c CC33818%206 63% 48% 5.4 min
Great Northern GN3371%262 90% 89% 1.3 min
London North Eastern Railway GR2941%186 72% 71% 3.6 min
Chiltern Railways CH2264%199 93% 89% 0.8 min
Tyne and Wear Metro TW1570%58 97% 97% -0.6 min
Heathrow Express HX1520%144 94% 94% 0.7 min
Sheffield Supertram SJ980%39 95% 95% 0.5 min
Gatwick Express GX7314%48 40% 33% 11 min
Island Line IL520%50 100% 100% -0.5 min
Eurostar ES480%21 86% 86% 2.9 min
Charter/Other ZZ440%8 75% 75% 1.6 min
West Coast Railway Co WR310%9 100% 100% -11.7 min
Grand Central GC270%19 58% 58% 5.5 min
Lumo LD120%12 67% 67% 4.1 min
Hull Trains HT120%11 64% 64% 4 min
Lumo Stirling LF100%7 57% 57% 5.4 min
TY TY80%0 — — —
North Yorkshire Moors Railway NY80%8 100% 100% -40.9 min
LS LS80%3 0% 0% 12.3 min
YG YG50%4 75% 75% 6.8 min
Caledonian Sleeper CS333%2 100% 67% -12 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 87% and 83% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a safety inspection of the track

679 services

This service has been delayed by a late running train being in front of this one

508 services

This service has been delayed by a fault with the signalling system

246 services

This service has been delayed by a speed restriction over defective track

226 services

This service has been delayed by a speed restriction

191 services

This service has been delayed by congestion

187 services

This service has been delayed by a problem currently under investigation

105 services

This service has been delayed by a fault with the signalling system earlier today

80 services

Why trains were cancelled

A reason reached the archive for 488 of the 816 cancellations (59.8%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a safety inspection of the track

149 services

This service has been cancelled because of a fault with the signalling system

65 services

This service has been cancelled because of a speed restriction

56 services

This service has been cancelled because of a shortage of train crew

48 services

This service has been cancelled because of a shortage of train drivers

47 services

This service has been cancelled because of a fault on this train

46 services

This service has been cancelled because of a fire on property near the railway

45 services

This service has been cancelled because of a member of train crew being unavailable

32 services

The longest delays

The worst of them arrived 3h 09m behind schedule — Manchester Victoria to Leeds, booked away at 06:30, run by Northern. The ten longest range from 3h 09m down to 55 min, and they belong to 6 operators, Southern accounting for 3. What a delay on that scale usually means.

BookedServiceLate by
06:30Manchester Victoria to Leeds 1J40 · NT3h 09m
18:30London Euston to Glasgow Central 1S95 · VT1h 53m
20:49Cardiff Central to Derby 1M87 · XC1h 13m
13:56Bognor Regis to London Victoria 1B39 · SN1h 10m
12:03Manchester Piccadilly to Bristol Temple Meads 1V55 · XC1h 08m
12:30Manchester Piccadilly to Cardiff Central 1V42 · AW1h 06m
19:59Holyhead to Manchester Piccadilly 1H96 · AW1h 04m
18:35Horsham to Bognor Regis 1B50 · SN1h 01m
19:06Horsham to Bognor Regis 1B52 · SN57 min
13:09London Waterloo to Portsmouth Harbour 1T37 · SW55 min

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 11:00, when 38% of 1,431 arrived within five minutes.

00 149
01 48
02 28
03 38
04 137
05 759
06 1,392
07 1,398
08 1,423
09 1,419
10 1,461
11 1,431
12 1,456
13 1,441
14 1,450
15 1,438
16 1,460
17 1,465
18 1,420
19 1,271
20 1,067
21 951
22 853
23 607

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 28.

What ran

Formations were recorded for 24,473 trains on this date, made up of 2,633 individual units and 11,536 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 2,578 of the day's recorded trains from a pool of 189 units.

The average train was 5.5 vehicles long. The longest formation recorded was 22 vehicles.

ClassTrainsUnits used
Class 3772,578189
Class 1581,472140
Class 4501,36699
Class 7201,29394
Class 1501,25584
Class 3871,21380
Class 3451,16763
Class 1561,16291
Class 4651,09889
Class 3851,07366
Class 1701,01898
Class 16594562

Of 24,562 runs, 24,473 had a formation published (100%) — these are allocations rather than observations.

Buses

15,442 buses from 152 operators were seen on this date, across 2,731,939 position reports.

114,833 bus journeys were followed to their destination on this date. 78,253 arrived on time, 6,233 late, and 30,347 — 26% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

Averaged across every journey, buses arrived 0.2 minutes ahead of schedule — the early arrivals outweighing the late ones.

Journeys followed to destination114,833
On time78,25368.1%
Early30,34726.4%
Late6,2335.4%
…more than 20 minutes late6010.5%
Average arrival0.2 min early

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO87,39670%26%
Nottingham City Transport NCTR2,20377%20%
Go North East GNEL1,69779%11%
First South Yorkshire FSYO1,38359%33%
First Bristol, Bath & the West FBRI1,36157%29%
First Leeds FLDS1,29453%38%
Bee Network BNML99274%21%
National Express NATX90632%37%
Bee Network BNSM75978%19%
National Express West Midlands TNXB70278%15%
Arriva Yorkshire WRAY68555%39%
First Potteries FPOT62251%40%

Of the operators with enough journeys to compare, Brighton & Hove Bus and Coach Company ran closest to time (84%), and National Express furthest from it (32%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 22 Aug 2026 itself. How these figures are measured · Sources and licences