Monday, 26 October 2026
1,782 of the 12,816 passenger trains recorded on Monday, 26 October 2026 never ran, and those that did were an average of 5 minutes down. This is what a badly disrupted day looks like in the raw feed.
The largest single cause of cancellation was recorded 205 times, and the industry's own wording for it was “This service has been cancelled because of a fault with the signalling system”. Reasons on this site are reproduced exactly as the feed publishes them, because the phrasing is the operator's account of its own day rather than ours.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
c2c lost the largest share of its own timetable — 51.8% of 280 booked runs, against 13.9% across the network. On a day like this the figure says more about where the disruption sat geographically than about the operator.
The worst individual delay recorded was 1h 39m on the 05:15 Southampton Central to Manchester Piccadilly.
Buses on this date: 130,429 journeys followed to their destination, 69.9% on time.
The day in numbers
| Passenger trains recorded | 12,816 | |
|---|---|---|
| Cancelled | 1,782 | 13.9% |
| Arrival time recorded | 8,929 | 80.9% of those that ran |
| …arrived within 5 minutes | 6,459 | 72.3% |
| …arrived 5 to 30 minutes late | 2,231 | 25.0% |
| …arrived more than 30 minutes late | 239 | 2.7% |
| Average delay at destination | 5 min |
Every percentage among the bands is of the 8,929 trains whose arrival reached the archive — not of all 12,816, and the bands are exclusive. 2,105 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
37 operators ran passenger services on this date, from Northern on 1,528 runs down to West Coast Railway Co on 2. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||||||
|---|---|---|---|---|---|---|
Northern NT | 1,528 | 29% | 900 | 52% | 35% | 9.9 min |
ScotRail SR | 1,429 | 19% | 827 | 57% | 43% | 6.8 min |
Great Western Railway GW | 1,012 | 3% | 749 | 80% | 76% | 3.3 min |
Southeastern SE | 932 | 4% | 809 | 78% | 75% | 3.5 min |
Southern SN | 876 | 9% | 674 | 81% | 72% | 3.3 min |
South Western Railway SW | 869 | 6% | 680 | 69% | 63% | 4.9 min |
London Overground LO | 787 | 22% | 614 | 93% | 73% | 1.4 min |
West Midlands Railway LM | 653 | 13% | 528 | 72% | 62% | 4.6 min |
Transport for Wales AW | 643 | 19% | 333 | 68% | 50% | 6.7 min |
Greater Anglia LE | 597 | 2% | 576 | 90% | 89% | 1.7 min |
Thameslink TL | 466 | 18% | 237 | 78% | 58% | 3.4 min |
Merseyrail ME | 373 | 17% | 236 | 82% | 65% | 2.5 min |
London Underground LT | 347 | 0% | 140 | 78% | 78% | 3.7 min |
Elizabeth line XR | 325 | 0% | 325 | 97% | 97% | 0 min |
East Midlands Railway EM | 286 | 10% | 197 | 49% | 43% | 9.5 min |
c2c CC | 280 | 52% | 106 | 79% | 33% | 3.4 min |
TransPennine Express TP | 248 | 21% | 138 | 45% | 32% | 11.3 min |
Great Northern GN | 208 | 8% | 171 | 84% | 77% | 2.9 min |
Avanti West Coast VT | 199 | 31% | 97 | 11% | 7% | 27.7 min |
Chiltern Railways CH | 161 | 3% | 156 | 72% | 70% | 3.8 min |
CrossCountry XC | 160 | 14% | 111 | 32% | 27% | 14.3 min |
London North Eastern Railway GR | 110 | 3% | 68 | 38% | 37% | 16.2 min |
Tyne and Wear Metro TW | 80 | 0% | 80 | 80% | 80% | 3.2 min |
Heathrow Express HX | 72 | 0% | 71 | 100% | 100% | 0.5 min |
Sheffield Supertram SJ | 48 | 0% | 34 | 97% | 97% | 1.1 min |
Gatwick Express GX | 32 | 6% | 30 | 50% | 47% | 6.8 min |
Island Line IL | 22 | 9% | 0 | — | — | — |
Charter/Other ZZ | 21 | 0% | 3 | 100% | 100% | 1.3 min |
Eurostar ES | 16 | 0% | 16 | 56% | 56% | 10.4 min |
Grand Central GC | 8 | 25% | 6 | 17% | 13% | 18 min |
LS LS | 6 | 0% | 0 | — | — | — |
Lumo LD | 5 | 0% | 5 | 20% | 20% | 19 min |
Hull Trains HT | 5 | 0% | 5 | 20% | 20% | 11.8 min |
North Yorkshire Moors Railway NY | 4 | 0% | 4 | 75% | 75% | -26.5 min |
Lumo Stirling LF | 3 | 67% | 1 | 100% | 33% | 4 min |
Caledonian Sleeper CS | 3 | 33% | 1 | 0% | 0% | 72 min |
West Coast Railway Co WR | 2 | 0% | 1 | 100% | 100% | 0 min |
“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 72% and 60% — why both are published, what each hides, and how the sort treats a small operator.
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by severe weather earlier
270 services
This service has been delayed by a fault with the signalling system
220 services
This service has been delayed by a late running train being in front of this one
193 services
This service has been delayed by severe weather
192 services
This service has been delayed by slippery rails
142 services
This service has been delayed by a speed restriction over defective track
101 services
This service has been delayed by a fault with the signalling system earlier today
65 services
This service has been delayed by a speed restriction
63 services
Why trains were cancelled
A reason reached the archive for 1,080 of the 1,782 cancellations (60.6%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fault with the signalling system
205 services
This service has been cancelled because of severe weather
157 services
This service has been cancelled because of an operational incident
155 services
This service has been cancelled because of severe weather earlier
152 services
This service has been cancelled because of slippery rails
137 services
This service has been cancelled because of forecasted severe weather
102 services
This service has been cancelled because of a derailed train
100 services
This service has been cancelled because of damage to the overhead electric wires
72 services
The longest delays
The worst of them arrived 1h 39m behind schedule — Southampton Central to Manchester Piccadilly, booked away at 05:15, run by CrossCountry. The ten longest range from 1h 39m down to 1h 19m, and they belong to 6 operators, Northern accounting for 4. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
05:15 | Southampton Central to Manchester Piccadilly 1M18 · XC | 1h 39m |
11:32 | Chester to London Euston 1A32 · VT | 1h 32m |
07:57 | Sheffield to Scarborough 1W40 · NT | 1h 31m |
06:04 | Hexham to Nunthorpe 2W04 · NT | 1h 28m |
08:38 | Glasgow Central to London Euston 1M09 · VT | 1h 28m |
13:17 | Dorking to London Victoria 2I31 · SN | 1h 26m |
09:49 | Wigan Wallgate to Leeds 2I09 · NT | 1h 25m |
06:10 | Shrewsbury to Birmingham New Street 2G02 · LM | 1h 23m |
05:42 | Newcastle to Carlisle 1N55 · NT | 1h 19m |
04:22 | Glasgow Central to Manchester Airport 1M80 · TP | 1h 19m |
Through the day
Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 17:00, when 0% of 109 arrived within five minutes.
The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 23:00 with 14.
What ran
Formations were recorded for 26,422 trains on this date, made up of 2,827 individual units and 12,509 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.
25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.
The most-used class was the 377, allocated to 3,163 of the day's recorded trains from a pool of 214 units.
The average train was 5.6 vehicles long. The longest formation recorded was 22 vehicles.
| Class | Trains | Units used |
|---|---|---|
| Class 377 | 3,163 | 214 |
| Class 465 | 1,538 | 98 |
| Class 450 | 1,521 | 115 |
| Class 720 | 1,480 | 124 |
| Class 158 | 1,378 | 133 |
| Class 387 | 1,360 | 92 |
| Class 150 | 1,245 | 83 |
| Class 345 | 1,233 | 66 |
| Class 165 | 1,136 | 60 |
| Class 156 | 1,113 | 85 |
| Class 375 | 1,101 | 95 |
| Class 385 | 980 | 65 |
Of 12,816 runs, 26,422 had a formation published (206%) — these are allocations rather than observations.
Buses
16,692 buses from 167 operators were seen on this date, across 3,049,975 position reports.
130,429 bus journeys were followed to their destination on this date. 91,227 arrived on time, 5,618 late, and 33,584 — 26% — arrived ahead of schedule.
Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.
Averaged across every journey, buses arrived 0.3 minutes ahead of schedule — the early arrivals outweighing the late ones.
| Journeys followed to destination | 130,429 | |
|---|---|---|
| On time | 91,227 | 69.9% |
| Early | 33,584 | 25.7% |
| Late | 5,618 | 4.3% |
| …more than 15 minutes late | 661 | 0.5% |
| Average arrival | 0.3 min early |
By operator
| Operator | Journeys | On time | Early |
|---|---|---|---|
Transport for London TFLO | 103,316 | 72% | 26% |
Nottingham City Transport NCTR | 2,572 | 77% | 20% |
Go North East GNEL | 1,844 | 63% | 14% |
Bee Network BNML | 1,159 | 72% | 22% |
Bee Network BNSM | 948 | 76% | 21% |
Arriva Yorkshire WRAY | 857 | 54% | 39% |
First Potteries FPOT | 850 | 49% | 41% |
National Express NATX | 810 | 31% | 37% |
First Leicester FLEI | 764 | 58% | 38% |
Preston Bus PBLT | 709 | 61% | 37% |
Stagecoach Yorkshire SYRK | 570 | 62% | 33% |
trentbarton TBTN | 528 | 59% | 32% |
Of the operators with enough journeys to compare, Uni-Link ran closest to time (89%), and National Express furthest from it (31%).
Our figures, not the regulator's — why buses run early, the current league.
Recorded live from the Darwin and TRUST feeds on 26 Oct 2026 itself. How these figures are measured · Sources and licences