TransitRadar

Thursday, 6 August 2026

25,721 passenger trains were recorded on Thursday, 6 August 2026 and 131 of them were cancelled. Arrival times were not captured for most of this day, so it is a record of what ran rather than of how punctual it was.

25,721 passenger services were recorded as having been scheduled and settled on this date. Arrival times reached the archive for only 190 of them, so nothing is claimed here about how late the rest were — the figures below cover what ran and what did not.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

131 services were cancelled, 0.5% of everything booked. The reason given most often was “This service has been cancelled because of a fire next to the track”, on 82 of them. Cancellation reasons are close to complete even on days like this, and they are the operators' own wording, reproduced unedited.

Transport for Wales lost the largest share of its own timetable, 6.0% of 1,377 booked runs.

The day in numbers

Passenger trains recorded25,721
Cancelled1310.5%
Arrival time recorded1900.7% of those that ran

Every percentage among the bands is of the 190 trains whose arrival reached the archive — not of all 25,721, and the bands are exclusive. 25,400 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

Punctuality is not reported for this date. Arrival times reached the archive for only 190 of the 25,590 trains that ran (0.7%), and a punctuality figure drawn from that would describe the sample rather than the railway. What ran, what was cancelled and why are recorded in full below.

By operator

38 operators ran passenger services on this date, from ScotRail on 3,073 runs down to TY on 4. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0730%
Northern NT2,7970%
Great Western Railway GW2,1610%
South Western Railway SW1,8770%
Southern SN1,6680%
Southeastern SE1,6310%
London Overground LO1,5831%
Transport for Wales AW1,3776%
West Midlands Railway LM1,3270%
Greater Anglia LE1,3040%
Thameslink TL9370%
London Underground LT7530%
Elizabeth line XR6870%
Merseyrail ME6140%
East Midlands Railway EM6120%
Great Northern GN4350%
c2c CC4170%
Avanti West Coast VT3824%
CrossCountry XC3442%
Chiltern Railways CH3430%
London North Eastern Railway GR3170%
TransPennine Express TP3141%
Tyne and Wear Metro TW1740%
Heathrow Express HX1520%
Sheffield Supertram SJ980%
Gatwick Express GX720%
Island Line IL520%
Eurostar ES500%
Charter/Other ZZ490%
West Coast Railway Co WR360%
Grand Central GC200%
Hull Trains HT140%
Lumo LD110%
Lumo Stirling LF100%
Caledonian Sleeper CS100%
North Yorkshire Moors Railway NY80%
LS LS80%
TY TY40%

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a problem currently under investigation

4 services

This service has been delayed by failure of the electricity supply earlier today

3 services

This service has been delayed by failure of the electricity supply

2 services

This service has been delayed by a speed restriction

2 services

This service has been delayed by a safety inspection of the track earlier today

2 services

This service has been delayed by a late running train being in front of this one

2 services

This service has been delayed by a late running freight train

2 services

This service has been delayed by a fault with the signalling system

2 services

Why trains were cancelled

A reason reached the archive for 127 of the 131 cancellations (96.9%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a fire next to the track

82 services

This service has been cancelled because of a shortage of train crew

19 services

This service has been cancelled because of more trains than usual needing repairs at the same time

11 services

This service has been cancelled because of failure of the electricity supply

4 services

This service has been cancelled because of a shortage of train drivers

4 services

This service has been cancelled because of a fault with the signalling system

4 services

This service has been cancelled because of trespassers on the railway

2 services

This service has been cancelled because of a short-notice change to the timetable

1 service

The longest delays

The worst of them arrived 1h 02m behind schedule — Edinburgh to Manchester Airport, booked away at 20:12, run by TransPennine Express. The ten longest range from 1h 02m down to 28 min, and they belong to 5 operators, Northern accounting for 3. What a delay on that scale usually means.

BookedServiceLate by
20:12Edinburgh to Manchester Airport 1M65 · TP1h 02m
22:02Blackpool North to Leeds 1B00 · NT56 min
19:30London Euston to Glasgow Central 1S98 · VT45 min
18:40Glasgow Central to London Euston 1M19 · VT42 min
22:58Leeds to Sheffield 2L87 · NT41 min
22:25Exeter St Davids to Salisbury 1L88 · SW40 min
20:25Exeter St Davids to London Waterloo 1L80 · SW37 min
21:39London Euston to Manchester Piccadilly 1H45 · VT33 min
22:51Colne to Preston 2N87 · NT31 min
23:16London Marylebone to Aylesbury 2A74 · CH28 min

Through the day

Booked departures by hour.

00 39
01 35
02 14
03 25
04 151
05 920
06 1,605
07 1,655
08 1,521
09 1,432
10 1,411
11 1,397
12 1,399
13 1,394
14 1,413
15 1,451
16 1,549
17 1,615
18 1,518
19 1,343
20 1,212
21 1,103
22 968
23 551

The quietest was 02:00 with 14.

Recorded live from the Darwin and TRUST feeds on 6 Aug 2026 itself. How these figures are measured · Sources and licences