Thursday, 6 August 2026
25,721 passenger trains were recorded on Thursday, 6 August 2026 and 131 of them were cancelled. Arrival times were not captured for most of this day, so it is a record of what ran rather than of how punctual it was.
25,721 passenger services were recorded as having been scheduled and settled on this date. Arrival times reached the archive for only 190 of them, so nothing is claimed here about how late the rest were — the figures below cover what ran and what did not.
An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.
131 services were cancelled, 0.5% of everything booked. The reason given most often was “This service has been cancelled because of a fire next to the track”, on 82 of them. Cancellation reasons are close to complete even on days like this, and they are the operators' own wording, reproduced unedited.
Transport for Wales lost the largest share of its own timetable, 6.0% of 1,377 booked runs.
The day in numbers
| Passenger trains recorded | 25,721 | |
|---|---|---|
| Cancelled | 131 | 0.5% |
| Arrival time recorded | 190 | 0.7% of those that ran |
Every percentage among the bands is of the 190 trains whose arrival reached the archive — not of all 25,721, and the bands are exclusive. 25,400 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.
By operator
38 operators ran passenger services on this date, from ScotRail on 3,073 runs down to TY on 4. Ordered by volume, not performance — any heading re-sorts it.
| Operator | ||
|---|---|---|
ScotRail SR | 3,073 | 0% |
Northern NT | 2,797 | 0% |
Great Western Railway GW | 2,161 | 0% |
South Western Railway SW | 1,877 | 0% |
Southern SN | 1,668 | 0% |
Southeastern SE | 1,631 | 0% |
London Overground LO | 1,583 | 1% |
Transport for Wales AW | 1,377 | 6% |
West Midlands Railway LM | 1,327 | 0% |
Greater Anglia LE | 1,304 | 0% |
Thameslink TL | 937 | 0% |
London Underground LT | 753 | 0% |
Elizabeth line XR | 687 | 0% |
Merseyrail ME | 614 | 0% |
East Midlands Railway EM | 612 | 0% |
Great Northern GN | 435 | 0% |
c2c CC | 417 | 0% |
Avanti West Coast VT | 382 | 4% |
CrossCountry XC | 344 | 2% |
Chiltern Railways CH | 343 | 0% |
London North Eastern Railway GR | 317 | 0% |
TransPennine Express TP | 314 | 1% |
Tyne and Wear Metro TW | 174 | 0% |
Heathrow Express HX | 152 | 0% |
Sheffield Supertram SJ | 98 | 0% |
Gatwick Express GX | 72 | 0% |
Island Line IL | 52 | 0% |
Eurostar ES | 50 | 0% |
Charter/Other ZZ | 49 | 0% |
West Coast Railway Co WR | 36 | 0% |
Grand Central GC | 20 | 0% |
Hull Trains HT | 14 | 0% |
Lumo LD | 11 | 0% |
Lumo Stirling LF | 10 | 0% |
Caledonian Sleeper CS | 10 | 0% |
North Yorkshire Moors Railway NY | 8 | 0% |
LS LS | 8 | 0% |
TY TY | 4 | 0% |
Why trains were late
8 different reasons were given for delay on this date, each reproduced in the operator's own words.
This service has been delayed by a problem currently under investigation
4 services
This service has been delayed by failure of the electricity supply earlier today
3 services
This service has been delayed by failure of the electricity supply
2 services
This service has been delayed by a speed restriction
2 services
This service has been delayed by a safety inspection of the track earlier today
2 services
This service has been delayed by a late running train being in front of this one
2 services
This service has been delayed by a late running freight train
2 services
This service has been delayed by a fault with the signalling system
2 services
Why trains were cancelled
A reason reached the archive for 127 of the 131 cancellations (96.9%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.
This service has been cancelled because of a fire next to the track
82 services
This service has been cancelled because of a shortage of train crew
19 services
This service has been cancelled because of more trains than usual needing repairs at the same time
11 services
This service has been cancelled because of failure of the electricity supply
4 services
This service has been cancelled because of a shortage of train drivers
4 services
This service has been cancelled because of a fault with the signalling system
4 services
This service has been cancelled because of trespassers on the railway
2 services
This service has been cancelled because of a short-notice change to the timetable
1 service
The longest delays
The worst of them arrived 1h 02m behind schedule — Edinburgh to Manchester Airport, booked away at 20:12, run by TransPennine Express. The ten longest range from 1h 02m down to 28 min, and they belong to 5 operators, Northern accounting for 3. What a delay on that scale usually means.
| Booked | Service | Late by |
|---|---|---|
20:12 | Edinburgh to Manchester Airport 1M65 · TP | 1h 02m |
22:02 | Blackpool North to Leeds 1B00 · NT | 56 min |
19:30 | London Euston to Glasgow Central 1S98 · VT | 45 min |
18:40 | Glasgow Central to London Euston 1M19 · VT | 42 min |
22:58 | Leeds to Sheffield 2L87 · NT | 41 min |
22:25 | Exeter St Davids to Salisbury 1L88 · SW | 40 min |
20:25 | Exeter St Davids to London Waterloo 1L80 · SW | 37 min |
21:39 | London Euston to Manchester Piccadilly 1H45 · VT | 33 min |
22:51 | Colne to Preston 2N87 · NT | 31 min |
23:16 | London Marylebone to Aylesbury 2A74 · CH | 28 min |
Through the day
Booked departures by hour.
The quietest was 02:00 with 14.
Recorded live from the Darwin and TRUST feeds on 6 Aug 2026 itself. How these figures are measured · Sources and licences