TransitRadar

Friday, 25 September 2026

88% of the 22,318 passenger trains whose arrival was recorded on Friday, 25 September 2026 reached their destination within five minutes — an ordinary day, with the delays concentrated where they usually are.

Of 26,623 recorded runs, 512 did not run at all. Among those whose arrival reached the archive, 19,605 were within five minutes, 2,559 between five and thirty minutes down, and 154 more than half an hour — the tail that people actually remember.

“This service has been delayed by a late running train being in front of this one” was the most common explanation, given for 600 services.

London Overground came closest to running to time, 97.3% of its 1,584 recorded arrivals; Transport for Wales had the largest cancelled share at 6.8%.

Friday carries the heaviest long-distance loading of the week, and it is the day on which a late-afternoon problem has the fewest spare paths to recover into.

The day in numbers

Passenger trains recorded26,623
Cancelled5121.9%
Arrival time recorded22,31885.5% of those that ran
…arrived within 5 minutes19,60587.8%
…arrived 5 to 30 minutes late2,55911.5%
…arrived more than 30 minutes late1540.7%
Average delay at destination1.6 min

Every percentage among the bands is of the 22,318 trains whose arrival reached the archive — not of all 26,623, and the bands are exclusive. 3,793 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

38 operators ran passenger services on this date, from ScotRail on 3,069 runs down to North Yorkshire Moors Railway on 4. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0690%2,267 94% 94% 0.7 min
Northern NT2,8631%2,715 88% 87% 1.5 min
Great Western Railway GW2,1832%1,676 79% 78% 3.1 min
South Western Railway SW1,9284%1,490 86% 81% 2 min
Southeastern SE1,8122%1,772 84% 82% 2.3 min
Southern SN1,7243%1,594 84% 81% 2.6 min
London Overground LO1,6081%1,584 97% 96% -0.3 min
West Midlands Railway LM1,3341%1,309 91% 91% 1.1 min
Greater Anglia LE1,3110%1,301 94% 93% 0.5 min
Transport for Wales AW1,2867%983 93% 86% -0.4 min
Thameslink TL9874%608 83% 78% 2.2 min
London Underground LT7760%383 95% 95% 1.2 min
TransPennine Express TP7521%348 82% 80% 2.6 min
Elizabeth line XR6963%672 90% 87% 0.2 min
East Midlands Railway EM6261%494 77% 75% 3.5 min
Merseyrail ME6220%619 97% 97% 0.4 min
Great Northern GN4303%380 77% 74% 3.5 min
Avanti West Coast VT4210%317 73% 73% 4.1 min
c2c CC4181%362 91% 90% 1.7 min
CrossCountry XC3505%263 64% 60% 7 min
Chiltern Railways CH3496%328 96% 90% 0.4 min
London North Eastern Railway GR3170%199 78% 78% 2 min
Tyne and Wear Metro TW1740%174 97% 97% 0.6 min
Heathrow Express HX1520%152 74% 74% 2.9 min
Sheffield Supertram SJ980%74 100% 100% 0.3 min
Gatwick Express GX7213%61 64% 56% 6.6 min
Charter/Other ZZ580%9 100% 100% 1.9 min
Eurostar ES570%57 93% 93% 2.5 min
Island Line IL520%52 100% 100% -0.6 min
Grand Central GC229%19 63% 57% 6.4 min
West Coast Railway Co WR160%8 63% 63% -0.5 min
Hull Trains HT140%14 71% 71% 3.9 min
LS LS110%3 33% 33% 23.3 min
Lumo LD110%11 64% 64% 3.4 min
Lumo Stirling LF100%10 70% 70% 6.3 min
Caledonian Sleeper CS60%6 83% 83% 2.5 min
TY TY40%0 — — —
North Yorkshire Moors Railway NY40%4 50% 50% 10.5 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 88% and 86% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

600 services

This service has been delayed by a speed restriction

517 services

This service has been delayed by a fault with the signalling system

402 services

This service has been delayed by a speed restriction over defective track

384 services

This service has been delayed by a safety inspection of the track

182 services

This service has been delayed by a problem currently under investigation

145 services

This service has been delayed by a fault on a train earlier

142 services

This service has been delayed by a fault on a train

139 services

Why trains were cancelled

A reason reached the archive for 317 of the 512 cancellations (61.9%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of a fault with the signalling system

82 services

This service has been cancelled because of more trains than usual needing repairs at the same time

74 services

This service has been cancelled because of a fault on a train

36 services

This service has been cancelled because of a safety inspection of the track

30 services

This service has been cancelled because of a late running train being in front of this one

26 services

This service has been cancelled because of a fault on this train

25 services

This service has been cancelled because of a fault on a train earlier

25 services

This service has been cancelled because of a shortage of train drivers

19 services

The longest delays

The worst of them arrived 1h 48m behind schedule — Brighton to Southampton Central, booked away at 17:13, run by Southern. The ten longest range from 1h 48m down to 58 min, and they belong to 9 operators, South Western Railway accounting for 2. What a delay on that scale usually means.

BookedServiceLate by
17:13Brighton to Southampton Central 1N50 · SN1h 48m
18:57London Paddington to Great Malvern 1W36 · GW1h 16m
18:00London Kings Cross to Edinburgh 1S27 · GR1h 14m
04:07Manchester Airport to Scarborough 1P07 · TP1h 11m
08:59Weymouth to London Waterloo 1W08 · SW1h 04m
20:10London Victoria to Dover Priory 1S58 · SE1h 03m
07:57Brussels Midi to London St Pancras (Intl) 9I13 · ES1h 01m
09:35London Waterloo to Weymouth 1W19 · SW1h 00m
10:30Penzance to London Paddington 1Z71 · LS1h 00m
14:52Norwich to Liverpool Lime Street 1R78 · EM58 min

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 52% of 121 arrived within five minutes.

00 121
01 38
02 13
03 26
04 154
05 939
06 1,639
07 1,689
08 1,577
09 1,471
10 1,447
11 1,428
12 1,422
13 1,424
14 1,445
15 1,485
16 1,589
17 1,649
18 1,551
19 1,373
20 1,247
21 1,151
22 1,025
23 720

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 13.

What ran

Formations were recorded for 27,327 trains on this date, made up of 2,906 individual units and 12,768 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,248 of the day's recorded trains from a pool of 221 units.

The average train was 5.6 vehicles long. The longest formation recorded was 24 vehicles.

ClassTrainsUnits used
Class 3773,248221
Class 4651,594101
Class 4501,519121
Class 1581,494138
Class 7201,457124
Class 1501,41991
Class 3871,33690
Class 3451,25466
Class 1651,17663
Class 1561,12391
Class 7001,019106
Class 38599866

Of 26,623 runs, 27,327 had a formation published (103%) — these are allocations rather than observations.

Buses

17,620 buses from 190 operators were seen on this date, across 3,205,916 position reports.

138,478 bus journeys were followed to their destination on this date. 98,967 arrived on time, 8,236 late, and 31,275 — 23% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

The average arrival was 0 minutes late, and 802 journeys finished more than twenty minutes down.

Journeys followed to destination138,478
On time98,96771.5%
Early31,27522.6%
Late8,2365.9%
…more than 20 minutes late8020.6%
Average arrival0 min late

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO106,95474%23%
First South Yorkshire FSYO2,10358%25%
Go North East GNEL2,09176%9%
First Leeds FLDS1,67256%26%
First Bristol, Bath & the West FBRI1,44962%25%
Bee Network BNSM91077%18%
Arriva Yorkshire WRAY88657%28%
National Express NATX88431%36%
First Potteries FPOT84653%35%
National Express West Midlands TNXB83780%16%
Bee Network BNML80672%21%
First Leicester FLEI76956%38%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (91%), and National Express furthest from it (31%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 25 Sept 2026 itself. How these figures are measured · Sources and licences