TransitRadar

Thursday, 24 September 2026

The railway ran close to plan on Thursday, 24 September 2026: 90% of the 22,306 passenger trains whose arrival was recorded were within five minutes, and only 382 of 26,624 were cancelled.

19,973 of the 22,306 trains whose arrival was recorded were within five minutes, and the average delay was 1.3 minutes. Days like this rarely make the news, which is part of why they are worth recording.

An ordinary weekday timetable, with the two commuter peaks that give the network most of its work and least of its slack.

Even so, 134 trains were more than half an hour late. The worst was the 17:09 Reading to London Waterloo, which arrived 2h 42m behind schedule.

Where a reason was given at all, the most frequent was “This service has been delayed by a late running train being in front of this one” (717 services).

The day in numbers

Passenger trains recorded26,624
Cancelled3821.4%
Arrival time recorded22,30685.0% of those that ran
…arrived within 5 minutes19,97389.5%
…arrived 5 to 30 minutes late2,1999.9%
…arrived more than 30 minutes late1340.6%
Average delay at destination1.3 min

Every percentage among the bands is of the 22,306 trains whose arrival reached the archive — not of all 26,624, and the bands are exclusive. 3,936 trains ran without an arrival time being recorded, and nothing is claimed about how punctual those were. Delay is judged at the destination, a stricter test than the industry's own measure and not comparable with it.

By operator

38 operators ran passenger services on this date, from ScotRail on 3,055 runs down to North Yorkshire Moors Railway on 4. Ordered by volume, not performance — any heading re-sorts it.

Operator
ScotRail SR3,0550%2,255 95% 94% 0.8 min
Northern NT2,8691%2,703 89% 88% 1.4 min
Great Western Railway GW2,1841%1,671 85% 84% 1.7 min
South Western Railway SW1,9062%1,543 88% 86% 1.5 min
Southeastern SE1,8091%1,775 86% 84% 2.1 min
Southern SN1,7192%1,649 88% 86% 1.6 min
London Overground LO1,6091%1,560 96% 94% 0.2 min
West Midlands Railway LM1,3400%1,224 91% 91% 1 min
Greater Anglia LE1,3171%1,298 90% 89% 1.7 min
Transport for Wales AW1,2935%984 92% 86% 0.2 min
Thameslink TL9863%605 88% 84% 1.3 min
London Underground LT7770%413 98% 98% 0.8 min
TransPennine Express TP7541%348 84% 82% 2.2 min
Elizabeth line XR6992%682 95% 93% -0.2 min
East Midlands Railway EM6251%489 83% 81% 2.2 min
Merseyrail ME6220%618 99% 98% 0.2 min
Great Northern GN4402%379 82% 80% 3.2 min
Avanti West Coast VT4200%316 77% 77% 3.3 min
c2c CC4161%358 91% 89% 1.9 min
Chiltern Railways CH3519%319 95% 86% 0.8 min
CrossCountry XC3484%264 66% 63% 6 min
London North Eastern Railway GR3170%199 85% 85% 0.4 min
Tyne and Wear Metro TW1740%172 99% 99% 0.4 min
Heathrow Express HX1520%152 89% 89% 1.4 min
Sheffield Supertram SJ980%74 100% 100% -0.1 min
Gatwick Express GX720%72 81% 81% 2.3 min
Charter/Other ZZ610%1 100% 100% 1 min
Eurostar ES550%55 87% 87% 3 min
Island Line IL520%52 100% 100% -0.8 min
West Coast Railway Co WR240%10 80% 80% 0.9 min
Grand Central GC200%20 70% 70% 3.9 min
Hull Trains HT140%14 79% 79% 6 min
Lumo LD120%12 67% 67% 4 min
LS LS100%2 50% 50% 3.5 min
Lumo Stirling LF1020%8 38% 30% 5.6 min
Caledonian Sleeper CS60%6 83% 83% -2.7 min
TY TY40%0 — — —
North Yorkshire Moors Railway NY40%4 75% 75% 4 min

“On time” is of each operator's recorded arrivals; “incl. cancelled” counts a cancellation as a failure, which is what the industry's own measure does. Across the whole day they read 90% and 88% — why both are published, what each hides, and how the sort treats a small operator.

Why trains were late

8 different reasons were given for delay on this date, each reproduced in the operator's own words.

This service has been delayed by a late running train being in front of this one

717 services

This service has been delayed by a speed restriction

474 services

This service has been delayed by a speed restriction over defective track

326 services

This service has been delayed by a fault with the signalling system

182 services

This service has been delayed by congestion

155 services

This service has been delayed by a problem currently under investigation

114 services

This service has been delayed by a safety inspection of the track

94 services

This service has been delayed by animals on the railway

83 services

Why trains were cancelled

A reason reached the archive for 181 of the 382 cancellations (47.4%), across 8 distinct reasons. A run cancelled part-way along often carries no reason at all.

This service has been cancelled because of more trains than usual needing repairs at the same time

40 services

This service has been cancelled because of a shortage of train crew

38 services

This service has been cancelled because of a late running train being in front of this one

27 services

This service has been cancelled because of a fault on this train

17 services

This service has been cancelled because of animals on the railway

15 services

This service has been cancelled because of a safety inspection of the track

15 services

This service has been cancelled because of a person being hit by a train

15 services

This service has been cancelled because of congestion

14 services

The longest delays

The worst of them arrived 2h 42m behind schedule — Reading to London Waterloo, booked away at 17:09, run by South Western Railway. The ten longest range from 2h 42m down to 1h 05m, and they belong to 6 operators, Transport for Wales accounting for 3. What a delay on that scale usually means.

BookedServiceLate by
17:09Reading to London Waterloo 2C56 · SW2h 42m
10:40Cheltenham Spa to Cardiff Central 2G53 · AW2h 13m
11:40Cheltenham Spa to Cardiff Central 2G55 · AW1h 38m
06:17Llanelli to Pembroke Dock 2E28 · AW1h 24m
16:29Corkickle to Lancaster 2T32 · NT1h 22m
21:00Sheffield to London St Pancras (Intl) 1C98 · EM1h 12m
20:18London Liverpool Street to Clacton-on-Sea 1N58 · LE1h 06m
18:24Cheshunt to London Liverpool Street 2D03 · LO1h 05m
19:05Clacton-on-Sea to London Liverpool Street 1N57 · LE1h 05m
20:00London Liverpool Street to Norwich 1P62 · LE1h 05m

Through the day

Booked departures by hour, with the share that arrived within five minutes. Punctuality was weakest at 00:00, when 62% of 139 arrived within five minutes.

00 139
01 36
02 16
03 25
04 152
05 939
06 1,642
07 1,695
08 1,574
09 1,469
10 1,442
11 1,421
12 1,424
13 1,425
14 1,444
15 1,485
16 1,587
17 1,655
18 1,553
19 1,377
20 1,247
21 1,162
22 1,036
23 679

The filled part of each bar is the share of that hour's booked departures that arrived within five minutes. The quietest was 02:00 with 16.

What ran

Formations were recorded for 27,365 trains on this date, made up of 2,911 individual units and 12,821 separate vehicles. These figures cover the services an allocation was published for, not every train that ran.

25 different classes of train appeared, which is the signature of a full weekday — the long-distance fleets, the regional diesel units and the suburban electrics all working at once.

The most-used class was the 377, allocated to 3,380 of the day's recorded trains from a pool of 220 units.

The average train was 5.6 vehicles long. The longest formation recorded was 20 vehicles.

ClassTrainsUnits used
Class 3773,380220
Class 4651,631104
Class 7201,527131
Class 4501,517122
Class 1501,47089
Class 1581,421131
Class 3871,32192
Class 3451,25667
Class 1651,16564
Class 1561,16193
Class 3751,059102
Class 7001,009108

Of 26,624 runs, 27,365 had a formation published (103%) — these are allocations rather than observations.

Buses

17,598 buses from 187 operators were seen on this date, across 3,182,336 position reports.

135,569 bus journeys were followed to their destination on this date. 96,962 arrived on time, 7,706 late, and 30,901 — 23% — arrived ahead of schedule.

Early arrivals are normal rather than exceptional. Bus running times carry enough slack to survive traffic, and it is concentrated in the last leg, so a clear run simply finishes sooner than booked.

The average arrival was 0 minutes late, and 804 journeys finished more than twenty minutes down.

Journeys followed to destination135,569
On time96,96271.5%
Early30,90122.8%
Late7,7065.7%
…more than 20 minutes late8040.6%
Average arrival0 min late

By operator

OperatorJourneysOn timeEarly
Transport for London TFLO106,08974%23%
Go North East GNEL2,09473%9%
First South Yorkshire FSYO2,06760%25%
First Leeds FLDS1,68960%26%
Bee Network BNSM92078%17%
Arriva Yorkshire WRAY85957%28%
National Express West Midlands TNXB85777%16%
First Potteries FPOT83056%33%
National Express NATX79634%31%
First Leicester FLEI77560%36%
Preston Bus PBLT73164%29%
Bee Network BNML72077%17%

Of the operators with enough journeys to compare, Uni-Link ran closest to time (92%), and National Express furthest from it (34%).

Our figures, not the regulator's — why buses run early, the current league.

Recorded live from the Darwin and TRUST feeds on 24 Sept 2026 itself. How these figures are measured · Sources and licences